IR 05000483/1980009
| ML19320B746 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/30/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML19320B747 | List: |
| References | |
| NUDOCS 8007150002 | |
| Download: ML19320B746 (1) | |
Text
' TIC
'
p*" cog UNITED STATES NUCLEAR REGULATORY COMMISSION
+
...,
y
'
o REGION lli
'f 799 ROOSEVELT ROAD
/
GLEN ELLYN, ILLINOIS 60137
.....
FJUN 3 0 G80:
.
Docket No. 50-483 Union Electric Company ATTN:
Mr. John K. Bryan Vice President - Nuclear Post Office Box 149 St. Louis, MO 63166 Gentlemen:
Thank you for your letters dated June 6, 1980 and June 13, 1980, in-forming us of the steps you have taken to correct the items of non-compliance which we brought to your attention in Inspection Report No.
50-483/8009 forwarded by our letter dated March 14, 1980. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, ww.
Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:
Mr. W. H. Weber, Manager Nuclear Construction cc w/ltrs dtd 6/6/80 and 6/13/80:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Regions I & IV Ms. K. Drey Mr. Ronald Fluegge, Utility Division, Missouri Public Service Commission i
8 oonso 04A p