Category:SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE
MONTHYEARML20247Q3461998-05-22022 May 1998 SALP Rept 50-482/98-99 for Period 970406-980418 IR 05000482/19970991997-05-0808 May 1997 SALP Rept 50-482/97-99 for Period 951008-970405 ML20148B8451997-05-0808 May 1997 SALP Rept 50-482/97-99 for Period 951008-970405 ML20125D0231992-12-0404 December 1992 Initial SALP Rept 50-482/92-99 for Period 911006-921010 IR 05000482/19900141990-09-11011 September 1990 SALP Rept 50-482/90-14 for Apr 1989 - June 1990.Licensee Attained High Operating Capacity Factor During Assessment Period.However,Better Procedural Controls Needed in Many Areas,Including Maint & Troubleshooting ML20196C8641988-06-23023 June 1988 SALP Rept 50-482/88-14 for 870301-880331 ML20154E9951988-03-31031 March 1988 Final SALP Rept 50-482/88-14 for Mar 1987 - Mar 1988. Overall Performance Acceptable IR 05000482/19870091987-05-14014 May 1987 SALP Rept 50-482/87-09 for 860201-870228 IR 05000482/19860021986-04-16016 April 1986 SALP Rept 50-482/86-02 for 841002-860131 IR 05000482/19840361985-05-22022 May 1985 Errata to SALP Rept 50-482/84-36 for Aug 1983 - Sept 1984 to Correct Administrative Errors IR 05000482/19810211982-05-0505 May 1982 IE Mgt Meeting 50-482/81-21 on 811019.No Noncompliance Noted.Major Areas Discussed:Systematic Assessment of Licensee Performance for Jul 1980-June 1981 1998-05-22
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000482/19990091999-10-0707 October 1999 Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted. Major Areas Inspected:Events,Emergency Preparedness Facilities & Equipment,Emergency Plan & Implementing Procedures & Emergency Response Organization Training IR 05000482/19990051999-09-21021 September 1999 Insp Rept 50-482/99-05 Has Been Rescheduled for Next Yr.Insp Rept Will Not Be Issued IR 05000482/19990131999-09-20020 September 1999 Insp Rept 50-482/99-13 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990121999-09-14014 September 1999 Insp Rept 50-482/99-12 on 990816-20.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Mgt Program, Radioactive Matls Transportation Program,Facilities & Equipment,Staff Kowledge & Performance & Staff Training IR 05000482/19990161999-08-26026 August 1999 Insp Rept 50-482/99-16 on 990809-13.No Violations Noted. Major Areas Inspected:Planning & Preparation,Program to Maintain Occupational Exposure Alara,Temporary Shielding Program & Hot Spot Reduction Program IR 05000482/19990081999-08-18018 August 1999 Insp Rept 50-482/99-08 on 990613-0724.Noncited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000482/19993011999-08-17017 August 1999 Exam Rept 50-482/99-301 on 990726-29.Exam Results:All Nine Applicants Passed Written Exams & Exhibited No Broad Knowledge or Training Weaknesses IR 05000482/19990111999-08-13013 August 1999 Insp Rept 50-482/99-11 on 990712-16.No Violations Noted. Major Areas Inspected:Review of Radiological Environ Monitoring Program,Meterological Monitoring Prgram & Results of Licensee Investigation of 990525 Personnel Event IR 05000482/19990151999-08-10010 August 1999 Canceled Insp Rept 50-482/99-15.No Inspection Rept Will Be Issued for This Rept Number IR 05000482/19990071999-07-15015 July 1999 Insp Rept 50-482/99-07 on 990614-18.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Radiation Protection Program Activities IR 05000482/19990061999-07-0202 July 1999 Insp Rept 50-482/99-06 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-IV-99-029, on 990625,female Licensee Employee Was Discovered Contaminated in Facial Area.Licensee Convened Incident Investigation Team to Assess Event.Worker Received Total Effective Dose Equivalent of Approx 7 Mrem1999-06-28028 June 1999 PNO-IV-99-029:on 990625,female Licensee Employee Was Discovered Contaminated in Facial Area.Licensee Convened Incident Investigation Team to Assess Event.Worker Received Total Effective Dose Equivalent of Approx 7 Mrem IR 05000482/19990031999-05-21021 May 1999 Insp Rept 50-482/99-03 on 990321-0501.Four NCVs Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000482/19990041999-05-0505 May 1999 Insp Rept 50-482/99-04 on 990405-09.No Violations Noted. Major Areas Inspected:Licensee Implementation of Facility Inservice Insp Program & Followup Review of Previously Identified Insp Findings IR 05000482/19990021999-04-0909 April 1999 Insp Rept 50-482/99-02 on 990207-0320.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990011999-01-26026 January 1999 Insp Rept 50-482/99-01 on 990111-14.No Violations Noted. Major Areas Inspected:Testing & Maintenance,Protected Area Barriers & Detection Aids,Vital Area Barriers & Detection Aids,Compensatory Measures & Security Sys Power Supply IR 05000482/19980201999-01-15015 January 1999 Insp Rept 50-482/98-20 on 981115-1226.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000482/19980161998-12-10010 December 1998 Informs That Insp Rept 50-482/98-16 Was Combined with Insp Rept 50-482/98-12,therefore,no Rept Will Be Issued for Rept 50-482/98-16 ML20196H3711998-12-0303 December 1998 Insp Rept 50-482/98-19 on 981002-1114.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Licensee Response to Road Closure Due to Flooding within 10-mile Emergency Zone Was Excellent PNO-IV-98-051, on 981102,flooding in Vicinity of Wolf Creek Generating Station Occurred.Licensee Has Been in Close Contact with Army Corps of Engineers,Region VII Ofc of Federal Emergency Mgt Agency Emergency Organizations1998-11-0505 November 1998 PNO-IV-98-051:on 981102,flooding in Vicinity of Wolf Creek Generating Station Occurred.Licensee Has Been in Close Contact with Army Corps of Engineers,Region VII Ofc of Federal Emergency Mgt Agency Emergency Organizations ML20155A1871998-10-22022 October 1998 Insp Rept 50-482/98-17 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Use of Fire Protection Sys Pumps for Purposes Other than Fire Protection Constituted Degradation of Sys IR 05000482/19980181998-10-0505 October 1998 Insp Rept 50-482/98-18 on 980921-25.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Assessment Aids,Communications & Security Program Plan & Procedures ML20154C7031998-09-29029 September 1998 Notice of Violations from Insp on 980323-0410 & 0622-25. Violations Noted:Without Prior Commission Approval & Without Performing Written Safety Evaluations,Licensee Made Changes Described in USAR Re Unreviewed Safety Question ML20154C7071998-09-29029 September 1998 Insp Rept 50-482/98-12 on 980323-0410 & 0622-25.Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000482/19980151998-09-0404 September 1998 Insp Rept 50-482/98-15 on 980712-0822.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20236T1461998-07-23023 July 1998 Insp Rept 50-482/98-14 on 980531-0711.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236T1431998-07-23023 July 1998 Notice of Violation from Insp on 980531-0711.Violation Noted:On 980604,technicians Placed Heavy Door & Frame in Control Room Equipment Cabinet Adjacent to Train a Protection Sys Logic Cabinets IR 05000482/19980131998-06-12012 June 1998 Insp Rept 50-482/98-13 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20249A0341998-06-12012 June 1998 Notice of Violation from Insp on 980419-0530.Violation Noted:On 980317,electricians Removed Breaker NG001AGF1 While Clearance Order 98-0250-EF Relied on Procedure Mge EOOP-11 to Establish Isolation of Breaker from Bus ML20248B6471998-05-27027 May 1998 Notice of Violation from NRC Investigation on 961224-980206. Violation Noted:On 961211,S Buehne Intentionally Submitted Info to Licensee Known to Be Inaccurate & Info Submitted to NRC ML20247Q3461998-05-22022 May 1998 SALP Rept 50-482/98-99 for Period 970406-980418 ML20216A8881998-05-0606 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980410,an Accessible High Radiation Area on Radwaste Bldg Roof W/Dose Rate of Approx 400 Mr/H at 18 Inch Was Not Posted as High Radiation Area ML20216A9051998-05-0606 May 1998 Insp Rept 50-482/98-10 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217M3691998-04-30030 April 1998 Insp Rept 50-482/98-07 on 980330-0403.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20217E0851998-04-23023 April 1998 Notice of Violation from Insp on 970624-27.Violation Noted: Licensee Identified That Unauthorized Work, (Work Outside Scope of Assigned Work Package Tasks & Applicable Procedures) Performed & Not Documented ML20217M5291998-04-0202 April 1998 Notice of Violation from Insp on 980316-20.Violation Noted: Inspector Identified Seven Radioactive Matl Containers Located in Radwaste Storage Bldg ML20217M5491998-04-0202 April 1998 Insp Rept 50-482/98-11 on 980316-20.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Waste/Matls Transportation Programs IR 05000482/19980041998-04-0101 April 1998 Insp Rept 50-482/98-04 on 980125-0307.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217H6431998-04-0101 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:Operators Failed to Log Entry Into Action Statement for TS 3.1.3.5 Shutdown Rods Inserted Beyond Rod Insertion Limits IR 05000482/19980081998-03-30030 March 1998 Insp Rept 50-482/98-08 on 980302-06.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20216G5661998-03-13013 March 1998 Notice of Violation from Insp on 980223-27.Violation Noted: Proper Surveys Were Not Performed to Prevent Unconditional Release of Radioactive Matls Greater than Release Criteria ML20216G5761998-03-13013 March 1998 Insp Rept 50-482/98-09 on 980223-27.Violation Noted.Major Areas Inspected:Radiation Protection Program IR 05000482/19980021998-03-0606 March 1998 Insp Rept 50-482/98-02 on 980202-06.No Violations Noted. Major Areas Inspected:Maint,Engineering & Emergency Preparedness IR 05000482/19980061998-02-27027 February 1998 Insp Rept 50-482/98-06 on 980202-06.No Violations Noted. Major Areas Inspected:Review of Radiation Protection Program Activities ML20203K9181998-02-26026 February 1998 Insp Rept 50-482/98-03 on 980202-06.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Mgt Program,Training & Qualifications,Qa Oversight, Facilities & Equipment & Annual Repts ML20203K2831998-02-26026 February 1998 Insp Rept 50-482/98-301 on 980217.No Violations Noted.Major Areas Inspected:Operations,Including Evaluation of Competency of 2 Retake RO & 2 SRO Retake License Applicants for Issuance of Operating Licenses at Facility ML20203H5341998-02-23023 February 1998 Insp Rept 50-482/97-201 on 971103-980109.No Violations Noted.Major Areas Inspected:Capability of RHR & CCW Sys to Perform Safety Functions Required by Design Bases & Adherence of Sys to Design & Licensing Bases IR 05000482/19970211998-02-0909 February 1998 Insp Rept 50-482/97-21 Cancelled ML20199H9141998-01-29029 January 1998 Notice of Violation from Insp on 971214-980124.Violation Noted:Technicians Failed to Follow Procedure Steps by Removing Vendor Wire & Reversed Variable Transformer Leads IR 05000482/19970231998-01-29029 January 1998 Insp Rept 50-482/97-23 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-21
[Table view] |
Text
7 c-( > :-
x-p ,,4,- , , . .. ,
g. f;3 . spy ,n +
,,g ;
...
, , '
,
- %q
_
- 1' g- : s
.e ,1 :;; ,
Q)3 ' n .Q
. ,
'
. ~ .
. y:7m Raj ,;- :'w ca,Yn1" .~_'l
,
.
+ ' -
, ,, 1
- '
y+,, .A, , ,
. .
- -y, o
,
.e
,
- , ,
j;;,. ,
- ... .f ,
- - - 4 ,
.,.
1.~ ERRATA SHEE ,a . .. , ,
-
1 *I '
4....
47 ,
- Fa'cility:i,cWolf Creek' Generating Station '%
i &; , 3 ,
-
,
.
.
-
M ' ", NRC"IOpection Report 50-482/84-36
.
e k1',y= *
%"
- ..
-
,
gPa e' < >- Line: Now Reads Should Read'. -
.V. . . 4 <. WA'. .Two.NRC inspections have
.
One NRC inspection has-Line 6
- Basis for: change: 'To correct administrative. error
. (27 V. A'. Severity Level III Severity Level
~
.. -Line 1 1 4
' Basis for change:. To correct administrative error .
-
~
.28 V. IThree separate ~ Two separate
.
Line 1 Basis for change: To' correct-administrative error
.
28- 2 V. ' _ Severity Level item eliniinated Lines 6-8 Failu're to implement QA
. Procedures involving the as - turnover from construc-tion of the Refueling-
'
~
Water System. NRC Report
- ._ .
50-482/84-02 ll Basis!for change: To correct administrative error C
Y b
k v
w;.
l)sA '
, 1, ,
J
- % *
'
. , ,
g j ;.
?, '
,
,
(
v
. , s '
'
, .
f ,
.. t p,. 'r, ,
.
,s ;. 3 .
, r ,
. if + g ( * .t 1 "
., .., '. t y/*
8505290336 850522 -
ADOCK 05000482
,
f PDR E - ;..n
.i.' -. -
G
., .,
PDR
,
, ,
'
%- ~ , g I
U . .) '
... . ,
.
, ..
-4- . Maintenance 2 N/A Security and Safeguards 2 N/A Radiological Controls 0.1. Radiation Protection . 1 N/A 0.2. Radwaste Systems / Liquid and Gaseous . . . . 2 N/A 0.3. Transportation Activ ities/ Solid Radwaste 2 N/A 0.4. Chemistry / Radio-chemistry . . . . . 2 N/A 0.5. Environmental Surveillance ... 1 N/A Emergency Preparedness 3 N/A The total NRC inspection effort during this SALP enal'uat eriod consisted of 44 inspections involving a total of-4.98f i pector-hours onsite by NRC inspectors and NRC consultan / /
IV. PERFORMANCE ANALYSIS
{U Containment and Other Safety-klate Structures The construction a tiv iks his broad functional area were essentially comp e( r to this assessment period with the exception of the building. This t ,rh had uralbeen integrity test offorthe scheduled latecontainment in the assessment periodbutyaj ayed to facilitate the completion of other test Two NR@n ions have identified construction deficiencies in this area, ho er, these deficiencies are addressed in the Quality Assura e area of this repor is area will not be assigned a performance category for this perio Piping Systems and Supports Analysis Piping Systems This area was inspected during the periods of October 3-6, 1983, and April 9-13, 1984, by region based inspectors.
'
During the assessment period, three violations were identified as follows:
(1) 8408-01: Review of documentation by the Combined Review Group (CRG) did.not ensure compliance to applicable specifications for pipe spool EJ-04-501 (Severity Level V)
,
- . , , . , . , - - _ _ . , ,. - - -, . , . , - . - , _ . - , ,g
io .
'. .
-
<
! 4_ Maintenance 2 N/A . Security and Safeguards 2 N/A I Radiological Controls ,
- 0.1. Radiation Protection . 1 N/A l 0.2. Radwaste Systems / Liquid !
and Gaseous . . . . 2 N/A 0.3. Transportation Activ ities/ Solid Radwaste 2 N/A
0.4. Chemistry / Radio-chemistry . . . . . 2 N/A 0.5. Environmental Surveillance ... 1 N/A Emergency Preparedness 3
,
N/A The total NRC inspection effort during this SALP evaluation period
. consisted of 44 inspections involving a total of 4198 inspector-hours
- onsite by NRC inspectors and MRC consultant i I PERFORMANCE ANALYSIS
' Containment and Other Safety-Related Structures The construction activities in this broad functional area were essentially completed prior to this assessment period with the
'
exception of the structural integrity test of the containment building. This test had been scheduled for late in the assessment period but was delayed to facilitate the completion of other test One NRC inspection:has_ identified construction deficiencies in 'this ~
area, however, the'se deficiencies are addressed in the Quality i- Assurance area of this report.
.
This area will not be assigned a performance catego'ry for this
~
period.
j Piping Systems and Supports .
I Analysis Piping Systems This area was inspected during the periods of October.3-6, 1983, and April 9-13, 1984, by region based inspector During the assessment period, three violations were identified as follows:
(1) 8408-01: Review of documentation by the Combined i Review Group (CRG) did.not ensure compliance to
'
applicable specifications for pipe spool EJ-04-501 '
(Severity Level V)
.
y ... , , - - - -.,-...n.-., ,------,-,,_ : * * *' -
, . ..,, . - . ~ , . .
, ,
. . -.,
-27- Supportino Data and Summaries Violations Severity Levels
- Functional Areas I II III IV V Containment and Other Safety- 1 1 Related' Structures Piping Systems and Supports 3 Safety Related Components Support Systems Including k HVAC and Fire Protection d Electrical _ Power Supply / 2 And Distribution Instrumentation and j Control Systems Preoperational Testing / je 3 Licensing Activities Quality Assurance j j p[/ ,
2 2 10. Management Control /g ,/ 2 3 11. Design Control ah/
12. Plant Operations 1 Maintenance l (!/ 1
3 1 Security And 1p/hguards 1 Radiological I trols 1 Emergency Pre afedness Totals 1 8 15 Licensee Report Data
~ art 21 Reports During this Assessment Period, the Licensee did not submit any reports applicable to 10 CFR Part 21 Construction Deficiency Reports Tube-Line Could-Runde11 Handswitches PSA Snubbers Exposed Threads on Seal Welder Connectors Cracked Edge Connectors on Westinghouse 7300 Process System Improper Fitting on MSIV HVAC Polar Crane Testing Cable Termination Lugs I Beams r Code Welding Pipe Schedule
_..___..~ .._... . _ . . . .. .
F , ',. ,
.
.
-
, ,
-
t -
.
,
-27-V. Supportino Data and Summaries
.
. Violations Severity Levels I
Functional Areas I II III IV V Containment and Other Safety- 1
'
Related Structures Piping Systems and Supports 3 Safety Related Components Support Systems Including HVAC and Fire Protection Electrical Power Supply 2
,
And Distribution Instrumentation and Control Systems Preoperational Testing 3 Licensing Activities Quality Assurance 2 2 10. Management Control 2 3 11. Design Control 1 Plant Operations 1 1 Maintenance 1 3
-
1 Security And Safeguards 1 Radiological Controls 1 Emergency Preparedness Totals 1 8 15 Licensee Report Data Part 21 Reports During this Assessment Period, the Licensee did
not submit any reports applicable to 10 CFR Part 21
, Construction Deficiency Reports Tube-Line Gould-Runde11 Handswitches PSA Snubbers Exposed Threads on Seal Welder Connectors Cracked Edge Connectors on Westinghouse 7300 Process System Improper Fitting on MSIV HVAC Polar. Crane Testing Cabie Termination Lugs I Beans e Code Welding Pipe Schedule
. - _ . _ - _ _ _ . _ . . _ _ . . _ _ _ _ _ _ _ --
- _ _ . _ , _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ - - . _ . .
._ .
,
. .. . . . . , . . - . - ,:. .
- .
.a .
. .,.. a... x
's . ..:.'
.
-
,
.
-
28-
,
m .- . Pipe Pulsation Dampers Field Procurement Butterfly Valves
~ Containment Spray Pump Laundry and Hot Shower Charcoal. Absorber Limitorque 58-2-80 Actuator Gear Damage
- Lube Oil Piping' System Licensee Activities During this appraisal period the construction of the plant has essentially been completed. Preoperational testing is approximately-80% complete and Hot Functional Testing.is in progress. The licensee is forecasting a fuel date between December 31, 1984, and January 31,
. 198 ' Inspection Activities
During the appraisal period of Augugt. 1, 1983 to September 30, 1984,
/ /
a total of 4198 inspector hours wer,elexpe'nded on inspections /
investigations as follows: (1) 16J8 inspector. hours by the Resident Inspectors included in 12 ins 1/lonsj(2)2580inspectorhoursby
- Region IV inspectors, invest ers/and Wolf Creek Task Force included in 32 inspection E. . InvesticationandAllegationsRediew
\ /_
Four investigations wed 6 performed during this appraisal period and 4 numerous allegation ryv lews' KG&E has implemented a Quality First Organization fAnt is specifically charged with all allegations
, identified to the cens'e Yl
~ Escalated Enfosa ment Actions
/
scalated Enforcement Actions were initiated by NRC
-
Three separ i
' Region IV d this assessment perio They are as follows:
,
I S fr Level 2 - Intimidation /Harrassment a Quality Assurance Employee. NRC Report l: 50-482/EA-84-87 (OI) (Pending Appeal)
l l
l everity Level 3 - Failure to implement QA
'
Procedures involving the turnover from construction of the I- Refueling Water Syste NRC Report 50-482/84-02 I'
- . Severity Level 3 - Failure to properly inspect structural steel welding. NRC' Draft Report 50-482/84-22 (
!
I i
E v
e e m-w wgr-,r,r,,r --,-r-w,,,yw, y ,w- ,--,,,m--,,ww,,--m,- -
,y - - --,-- ,y- r--,--,-e---g
X., 4 *~ ..
--
.
-
.
-
.
,
.
-28- Pipe Pulsation Dampers Field Procurement Butterfly Valves ! Containment Spray Pump , Laundry and Hot Shower Charcoal Absorber ! Limitorque 58-2-80 Actuator Gear Damage . Lube Oil Piping System Licensee Activities
,
During this appraisal period the construction of the plant has
. essentially been completed. Preoperational testing is approximately 80% complete and Hot Functional Testing is in progress. The licensee is forecasting a fuel date between December 31, 1984,- and January 31, 198 Inspection Activities During the appraisal period of August 1,1983 to September 30, 1984, a total of 4198 inspector hours were expended on inspections /
investigations as follows: (1) 1618 inspector hours by the Resident Inspectors included in 12 inspections (2) 2580 inspector hours by Region IV inspectors, investigators, and Wolf Creek Task Force included in 32 inspections.
! Investigation and Allegations Review
!
l Four investigations were performed during this appraisal period and l numerous allegation reviews. KG&E has implemented a Quality l First Organization that is specifically charged with all allegations
? identified to the Licensee.
L Escalated Enforcement Actions Two separate Escalated Enforcement Actions were initiated by NRC Region IV during this assessment period. They are:as follows:
l
Severity Level 2 - Intimidation /Harrassment of a Quality Assurance Employee. NRC
$ Report 50-482/EA-84-87 (0I) (Pending Appeal)
L Severity Level 3 - Failure to properly inspect structural steel welding. NP.C Draft Report 50-482/84-22 l
l
.
l
. - - - . - . .. - . . , - -, , - , - . . - - - --