IR 05000482/1979010

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-482/79-10 on 790428.No Noncompliance Noted. Major Areas Inspected:Record of Items of Noncompliance & Effectiveness of Site QA Program & Current & Projected Manning Level of Site QA Organization
ML19246C492
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/21/1979
From: Crossman W, Oberg C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19246C488 List:
References
50-482-79-10, NUDOCS 7907250488
Download: ML19246C492 (3)


Text

.

-

U. S. flVCLEAR REGULATORY COMMISSI0fl 0FFICE OF IilSPECTION AtlD Ef4FORCEMENT

REGION IV

.

Report flo. STil 50-482/79-10 Docket No. STil 50-482 Category A2 Licensee: Kansas Gas and Electric Company Post Offira Box 208 Wichita, Kansas 67201

-

Facility Name: Wolf Creek, Unit tio.1 Meeting Held at: Arlington, Texas (RIV Office)

Meeting conducted: April 28,1979 Inspection and En forcement Personnel:

K. V. Seyfrit, Director, Region IV W. C. Seidle, Chief, Reactor Construction and Engineering Support Branch, Region IV W. E. Vetter, Assistant to the Director, Region IV W. A. Crossman, Chief, Projects Section, Region IV R. E. Hall, Chief, Engineering Support Section, Region IV C. R. Oberg, Reactor Inspector, Projects Section, Region IV

'4 < rf E/1///7 Reviewed:

.

.

C. R. Oberg, Reactor Inspector, Projects Section Date 2/!7 y Approved:

O W. A. Crossman, Chief, Projects Section Ddte Inspection Summary:

Enforcement meeting on April 28,1979 (Report f;o. STil 50-482/79-10)

Areas Discussed:

Record of items of noncompliance and effectiveness of site QA program; current and projected manning leve! of site QA organization; licensee's follow-up action to concrete problems with emphasis on seeing results; and possibility of escalai,ed enforcement action in event corrective actions by the licensee are ineffective.

,

d 7907250qgg

.

DETAILS

-

1.

Persons Contacted

.

Licensee Attendees Glenn L. Koester, Vice President Operations (KG&E)

Jesse 0. Arterburn, Superintendent of Nuclear Development (KG&E)

Earl W. Creel, Director, Quality Assurance (KG&E)

J. L. Sippel, Assistant Project Engineer (KCPL)

IE Attendees

--

K. V. Seyfrit, Director, RIV W. C. Seidle, Chief, RC&ES Branch, RIV W. E. Vetter, Assistant to the Director, RIV W. A. Crossman, Chief, Projects Section, RIV R. E. Hall, Chief, Engineering Support Section, RIV C. R. Oberg, Project Inspector, Projects Section, RIV 2.

Purpose of Mceting The purpose of the meeting was to review the record of the licensee in regard to items of noncompliance; to discuss the licensee's follow-up action to concrete placement problems with emphasis on "seeing results"; and to discuss the possibility of escalated enforcement action in the event corrective action is ineffective.

3.

Matters Discussed The record of the licensee in regard to items of noncompliance and the manner in which RIV monitors items of noncompliance were discussed with the licensee attendees.

It was emphasized that while RIV has noted some changes in the site activities, it is still too early to determine if changes are of a permanent nature.

Results are of primary interest to the NRC.

The stens available to the NRC for enforcement action were discussed.

The licensee representatives were informed that the next level of enforcement, in the case of KG&E, could be a Civil Penalty if the trend of noncompliance were to continue. The licensee was also intormed that, next to proper management controls, a vigorous on-site licensee / contractor QA/QC program is the best preventive measure available in order to prevent items of non-compliance.

QA/QC preventive audits should be emphasized with appropriate reactive audits conducted as required.

The licensee reviewed the status of their current program and changes that are being instituted for KG&E and for the constructor, Daniel Construction.

These include:

a.

A study of the KG&E QA surveillance program by an outside consultant.

Results will be available the first part of May 1979.

[

v]

,.,.,..-.,.,.,,.

g.

,

.

.

b.

A staf f of eight QA auditor: (plus secretary) has been assigned to the KG&E site.

Various disciplines will be represented.

This staff will be manned as soon as,possible.

This is an increase of four professionals

.

over previous plan d.

.

'

r.

The KG&E staff under the Superintendent of Nuclear Development is to be increased.

A Construction Manager is being sought.

He will report to the Superintendent of Nuclear Development and be responsible for over-seeing Daniel cnd other site construction activities.

d.

Daniel is increasing their QA staff to a full compler;ent of six QA auditors.

.

e.

Changes in the on-site Daniel construction organization including additional /new people were discussed.

The RIV Director concluded the meeting by stating that a continued inspection effort will be given by RIV to observe actual results of improvements and changes presented.

The Director noted that the increased inspection effort by RIV will continue urtil positive results are observed.

,

1/KG&E letter to RIV dated August 10, 1978-3-403 3:i2

-