IE Insp Rept 50-482/79-06 on 790402-04.No Noncompliance Noted.Major Areas Inspected:Const Activities,Review of Audits Performed for Concrete Activities & Preparation for Repairs to Equipment Hatch
ML19261E146
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/24/1979
From: Crossman W, Hansen W, Stewart R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19261E143 List:
References
50-482-79-06, 50-482-79-6, NUDOCS 7907050187
Download: ML19261E146 (6)


Text

.

U. S. fiUCLEAR REGULATORY COMMISSI0tl 0FFICE OF IllSPECTI0ft AtiD EtlFORCEMEtlT REGI0tl IV Report flo. STfl 50-432/79-06 Docket flo. STil 50-482 Category A2 Licensee:

Kansas Gas and Electric Company P. O. Box 208 Wichita, Kansas 67201 Facility flame:

Wolf Creek, Unit flo.1 Inspection at:

Wolf Creek Site, Coffey County, Burlington, Kansas Inspection conducted:

April 2-4, 1979 f!79 Inspectors:

e W. A. Crossman, Chief, Projects Section Date A

28

,

R. C. Stewart,Wctor Inb' tor, Pro 'ects Section Date

/

H

. P SL W f.f W. A. Hansen, Realltfr Inspector, Region III Date

/

Reviewed-

[

-

I/2 9'/7f

~

C. R. Oberg, Reactor Inspector, Projects Section Date Approved:

/

I!7-[!7f

--

W. A. Crossman, Chief, Projects Section 207

7907 050 /ff 7f f

.

Inspection Summary:

Inspection on April 2-4, 1979 (Report flo. STil 50-482/79-06)

Areas Inspected:

Routine, unannounced inspection of construction activities including observation of work activities and review of records pertaining to structural concrete; review of audits performed of concrete activities; and preparation for repairs to the void under the equipment hatch.

The inspec-tion involved sixty inspector-hours by three flRC inspectors.

Results: fio items of noncompliance were identified in the areas inspected.

.

7-

.

.

DETAILS 1.

Persons Contacted Principal Licensee Personnel (KG&E)

  • J. O. Arterburn, Superintendent, Nuclear Developm!nt
  • M. E. Clark, QA Manager, Site W. G. Eales, Jr., Senior QA Engineer D. W. Prigel, QA Engineer G. W. Reeves, QA Engineer
  • R. A. Ayers, QA Engineer Daniel International Corporation (DIC)

W. E. Hitt, Project Manager

  • C. T. Kinney, Construction Manager
  • V. J. Turner, Project QA Manager
  • D. L. Jones, QC Manager
  • I. Hussain, Assistant to Project Manager B. Vanderford, Assistant Construction Manager J. D. Baker, Engineer, Civil
  • denotes those present at the exit interview.

The IE inspectors also contacted and interviewed other licensee and contractor personnel including craftsmen, QA/QC, technical and engi-neering staff members.

2.

Site Tour

'

The IE inspectors toured the various areas of the site including the containment building, tendon gallery, auxiliary building and fuel handling building to observe housekeeping, construction and repair activities in progress.

No items of noncompliance or deviations wera identified.

3.

Procedure Review The following procedures were reviewed in regard to concreting activ-ities:

WP-IV-101, " Reinforcing Steel Placement," Rev. 1, 2/23/77 WP-IV-102, " Mechanical Splicing of Reinforcing Steel," Rev. 3, 11/21/78 2g7 205-3-

.

WP-IV-106, " Concrete Pre-Placement, Placement, and Post Placement," Rev. 4, 2/1/79 WP-IV-107, " Concrete Cold Joints" WP-IV-ll6, " Post Tensioning Tendon Installation and Protection" WP-IV-ll7, " Post Tensioning Embedded Items" Bechtel Specification flo.10466-C103, " Contract for Forming, Placing, Finishing and Curing of Concrete," Rev. 6, 2/16/79 Bechtel Specification tio.10466-Cll2, " Contract for Placing Reinforcing Steel" 4.

Observation of Concrete Work Activities Three concrete placements were made during the inspection.

The following activities associated with placements flo. OC 134-WO4, OC 131-WO8 and OC 121-W10 were inspected:

a.

Placement OC 134-WO4 Placement OC 134-WO4 involved an interior wall in the Auxiliary Building in Area 4 from elevation 2012'

-0" to the underside of slab elevation above (2023' -4").

C-0C 1921 R/9, C-0C 1922 R/6, C-0C 1923 R/6 and C-0C 1341 R/7 were designated as applicable drawings.

This placement was designated as a " difficult placement" and required a special instruction sheet.

The placement was comprised of 104 cubic yards of Design Mix flo. 47-C-1A-ti and was completed on April 2,1979.

(1)

Delivery and Placement delivery and placement was made by pumping the concrete through a si. eel pipeline.

An adequate number of concrete vibrators was being used for consolidation.

An adequate number of drop chutes (less than 5' from previous concrete surfaces) was being used.

-4-

.

(2)

Process Samoling Samples were taken during the placement.

The determination of slump was observed to have been made correctly and to meet the criteria specified (.1 inch to 5 inches).

(3)

Curing The curing compound (liquid membrane) specified was applied at the completion of the placement.

During the curing phase, it was observed that wet burlap was applied to the horizontal surfacas of the placement and that liquid membrane was being applied to vertical surfaces as the forms were removed. The curing met the specification requirements.

(4) Certification of Placement Personnel Training records were reviewed for one individual operating a vibrator. The records indicated that he had been provided several hours of training in the correct use of vibrators.

No items of noncompliance or deviations were identified.

b.

Placement No. OC 131-WO8 The placement is identi~ied as being an interior wall of the Auxiliary Building, elevation 2000' -0" to 2008', Areas 1 and 2.

Applicable drawing include C-0C 1314 R/5, C-0C 1311 R/7, C-0C 1913 R/6, C-0C 1920 R/8 and C-0C 1919 R/7.

Placement Preparation The forms were observed to be clean, tight and had been dampened in preparation for concrete placement.

The reinforcement was spaced correctly and had the correct distance to the forms. The preparation was inspected by quality control inspectors prior to placement.

Placement volume was estimated to be 172 cubic yards of Design Mix 47-C-1A-N.

In process sampling was in accordance with specifications.

No items of noncompliance or deviations were identified.

287 207-5-

.

Placement No. OC 121-W10

..

The placement was in the Auxiliary Building and was identified in drawings C-0C 1212 R/6, C-0C 1211 R/10, C-0C 1910 R/8 and C-0C 15 R/14.

(1)

Placement Preparation The forms were clean and had been dampened in preparation for the concrete placement.

Drop chutes were properly spaced.

Special in:tructions were issued for this placement due to difficult areas where the forms were close to girders.

(2) Records Review The records for the placement were complete and.had been verified by the Quality Control organization.

No items of noncompliance or deviation, were identified.

5.

Daniel QA Audits Daniel Quality Assurance audits of concrete placement were reviewed.

Two audits were performed in March and two others scheduled for April and May.

No items of noncompliance or deviations were identified.

6.

Exit Meeting The IE inspectors met with licensee representatives (denoted in para-graph 1) at the conclusion of the inspection on April 4,1979.

The IE inspectors summarized the scope and findings of the inspection.

opn n