IR 05000461/1980023
| ML19340E759 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 01/07/1981 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML19340E760 | List: |
| References | |
| NUDOCS 8101150602 | |
| Download: ML19340E759 (1) | |
Text
{{#Wiki_filter:F ~ fjI y/ ~ yy.* e h4 AW ~ JAN 7 1980' >l , c4 E2 != , Docket No. 50-461
- c
?: Illinois Power Company it - i, c' 'n> M2 ATTN: Mr. W. C. Gerstner ^$l' ' @ [[h Executive Vice President fj Q 500 South 27th Street g Decatur, IL 62525 ? .: Gentlemen: Thank you for your letter dated December 19, 1980, informing us of the steps you have taken to correct the items of noncompliance which we brought to your attention in Inspection Report No. 50-461/80-23 forwarded by our letter dated November 12, 1980. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, i G. Fiore11i, Chief Reactor Construction and Engineering Support Branch cc w/1tr dtd 12/19/80: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Dean Hansell, Office of Assistant Attorney General Gary N. Wright, Chief Division of Nuclear Safety Randall L. Plant, Prairie Alliance RI I RIII RIII h RIII o a y Live, e np Wescott Knop Fior lli 1/7/81 8191150h0A ) - }}