IR 05000461/1980008

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-461/80-08
ML19310A869
Person / Time
Site: Clinton 
Issue date: 06/17/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML19310A870 List:
References
NUDOCS 8006300613
Download: ML19310A869 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

TIC

'

>" " 4 UNITED STATES g

NUCLEAR REGULATORY COMMISSION s

  • ,

,,e

[

o R EGloN ill

U f

799 ROOSEVELT ROAD

%,

j.

.#

GLEN ELLYN, ILLINOIS 60137 UDN 1 719801 Docket no. 50-461 Illinois Power Company ATTN:

Mr. W. C. Gerstner Executive Vice President 500 South 27th Strece.

Decatur, IL 62525 Gentlemen:

Thank you for your letter dated June 6, 1980, informing us of the steps you have taken to correct the items of noncompliance which we brought to your attention in Inspection Report No. 50-461/80-08 forwarded by our letter dated May 14, 1980. We will examine these matters during a subsequent inspection.

Your cooperation with us is appreciated.

Sincerely,

.

2Oc W

~Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc w/ltr dtd 6/6/80:

Central Files Reptoduction Unit NRC 20b PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General J

8006soogg 3