IR 05000461/1980003

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-461/80-03 on 800304-06.No Noncompliance Noted.Major Areas inspected:RCPB,safety-related Piping & Welding & QA Manuals & Procedures
ML19323E930
Person / Time
Site: Clinton 
Issue date: 03/19/1980
From: Danielson D, Willie Lee
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19323E801 List:
References
50-461-80-03, 50-461-80-3, NUDOCS 8005270440
Download: ML19323E930 (6)


Text

_

__

.,

.

U.S. NUCLEAR REGULATORY COMMISSION

.

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

.

Report No. 50-461/80-03 Docket No. 50-461 License No. CPPR-137 Licensee:

Illinois Power Company 500 South 27th Street Decatur, IL 62525 Facility Name:

Clinton Power Station, Unit 1 Inspection At:

Clinton Site, Clinton, Illinois Inspection Conducted: March 4-6, 1980 lTWl t+

W Inspector:

E. W. K. Lee

8#

susA Approved By:

D. H. Danielson, Chief 3)' f/84)

Engineering Support Section 2 Ins 14ection Summary Inspection on March 4-6, 1980 (Report No. 50-461/80-03)

Areas Inspected: Reactor Coolant Pressure Boundary and Safety Related piping and welding QA manuals and procedures; Reactor Coolant Pressure Boundary and Safety Related piping welding activities.

The inspection involved a total of 18 inspector hours onsite by one NRC inspector.

Results:

No items of noncompliance or deviations were identified.

"

8oos27OWOg

.)

,

DETAILS Persons Contacted Principal Licensee Employees

,

R. Barkin, QA Specialist

  • G. M. Brashear, Manager, Clinton Site
  • A. J. Budnick, Quality Assurance
  • R. J. Canfield, Site Construction Manager
  • E.

E. Connon, Assistant Director Construction

  • L.

Dozier, Construction

  • R. Folck, QA Specialist
  • J. D. Funstcn, Piping
  • J. F. Hampton, Supervisor, Construction QA
  • J. O. McHood, Vice President
  • E. Panganiban, Construction, Piping
  • F. G. Schwarz, Supervisor, Civil Construction
  • J. S Spencer, Supervisor, Field Engineering M. Tindill, QA Specialist Other Personnel
  • B. G. Carson, Manager Technical Services, Baldwin Associates (BA)
  • J. E. Findley, Project Engineer, BA
  • J. A. Grimm, Site Project Supervisor, U. S. Testing Co.
  • J. Hilding, QA Manager, BA
  • J. Linehan, Manager QC, BA
  • T. Selva, Manager Quality and Technical Services, BA
  • H. R. Swift, Assistant Project Engineer, BA
  • T. Walker, Sr. Quality Control Engineer, BA
  • C. Winfrey, Sr. Quality Control Engineer, BA W. Woolery, Welding Engineer, BA The inspector also talked with and interviewed several other lice'see and his contractor's employees, including member of the technical sersices staff, QC and QA personnel and craftsmen.
  • Denotes those present at the exit interview.

Functional or Program Areas Inspected 1.

Reactor Coolant Pressure Boundary and Safety Related Piping - Welding Procedures, Specifications and Quality Assurance Procedures l

a.

Quality Assurance Procedures The inspector reviewed the Baldwin Associates, Incorporated, (BA)

Quality Assurance manual and procedures related to the welding of Reactor Coolant Pressure Boundary and Safety Related piping and-2-

.

established that the ma.nual and the procedures have not been re-vised since the last review (IE Report No. 50-461/79-12).

b.

Weldiag Procedures The inspector reviewed the following BA welding procedures:

(1) GE/NP-8-8-BA-2L, Revision 2 and its procedure qualification record (FQR) No. 3183

-

(2)

WPS-6-2ME, Revision 2 and its PQR No. 61 (3)

N-1-1-BA-M, Revision 5 and its PQRs No. 4956 and No. 0607 (4)

N-1-1-BA-L, Revision 6 and its PQRs No. 0606, No. 24, No. 25 and No. 26 (5)

WPS-1-ME, Revision 0, and its PQRs No. 56 and No. 57 It was determined that ASME B&PV Code Section IX requirements were met.

No items of noncompliance or deviations were identified.

2.

Reactor Coolant Pressure Boundary and Safety Related Pipings - Welding Material Control The inspector reviewed the following documents:

a.

(1) BA Procedure No. BTS-402, Revision 13, " Procedure Specifi-cation for the Procurement, Storage and Control of Welding Filler Materials."

(2) BA Procedure No. BTS-402 (GE/ Weld Control), Revision 2,

" Procedure Specification for the Procurement, Storage and Control of Welding Filler Materials."

(3) Receiving Inspection Reports, Material Certifications and Purchase Orders for ER308L welding rods with lots No.

C3548R308L and No. D3548R308L; ER316L welding rods with lots No. C3466T316LHF and No. D3466T316LHF; ER309 welding rods with lots No. C3287T309 and No. D3313T309; E70S-2 consumable inserts with heat no. 659A315 and ER308L consumable inserts with heat no. NG460.

It was determined that the above documents met the PSAR, 10CFR 50, Appendix B, andtheanthe applicable code and procedure re-quirements.

b.

Control of Materials The inspector toured the welding material issuance stations No.

2 and No. 4.

It was determined that (1) the welding materials-3-

!

L l

-____ -

.

are properly identified and segregated; (2) the temperature of the rod oven is maintained; (3) records are properly kept; and (4) issuance and return of welding materials are controlled in accordance with approved procedures.

No items of noncompliance or deviations were identified,.

3.

Reactor Coolant Pressure Boundary Piping - Observation of Welding Activities

The inspector observed welding activities of the Recirculation System, Welds No. A4 and No. All on Traveller No. B33-G001-A.

It was deter-mined that (1) work was conducted in accordance with the traveller; (2) proper welding materials were used; (3) welding procedure require-ments were met; (4) work area was free of weld rod-stubs, and (5)

physical appearance was acceptable.

No items of noncompliance or deviations were identified.

4.

Reactor Coolant Pressure Boundary and Safety Related Piping - Weld Heat Treatment a.

Review of Procedure The inspector established that the welding procedures reviewed under paragraph Ib of this report specified the acceptable pre-heating and monitoring methods.

b.

Observation While observing welding activities for items stated in paragraphs 3 and 7 of this report, the inspector determined that preheat met the procedure requirements.

No items of noncompliance or deviations were identified.

5.

Reactor Coolant Pressure Boundary and Safety Related Piping - Welder Qualification The inspector reviewed the following documents:

a.

BA Procedure No. BTS-401, Revision 9, " General Welding Procedure Specification."

b.

Qualification records of twelve welders who performed welding on welds stated in paragraphs 3, 6, and 7 of this report.

The inspector determined that the above documents met the requirements of ASME B&PV Code Section IX.

No items of noncompliance or deviations were identified.

-4-

t

.

6.

Reactor Coolant Pressure Boundary Piping - Special Welding Applications

<

The inspector observed the weld repair of the Recirculation System Weld No. A4 on traveller No. B33-G001-A.

It was determined that proper materials were used and procedure requirements were met.

-

No items of noncompliance or deviations were identified.

7*.

Safety Related Piping - Observation of Welding Activities The inspector observed the following welding activities:

Low Pressure Core Spray System Weld No. 11 on traveller a.

No. LP-2.

b.

Main Steam System Weld No. 7 on traveller No. 1B21-D302A-A-SF c.

Main Steam System Weld No. 2 on traveller No. IB21-D302B-A-SF It was determined that (1) work was conducted in accordance with traveller; (2) proper welding materials were used; (3) welding procedure requirements were met; (4) work area was free of weld rod-stubs; and (5) physical appearance was acceptable.

No items of noncompliance or deviations were identified.

8.

Calibration of Welding Machines While observing welding activities, it was noted that welding machines manufactured by Dimetrics, Incorporated were used on certain welds.

Upon questioning the licensee relative to the calibration requirements of the welding machines, it is the inspector's understanding that calibration of the machine is not required. However, the mechanical parts of the machines are checked daily, every four or five weeks, when practical, the machines are cleaned and checked for proper i

operation and it is planned that each machine will be calibrated in accordance with manufacturer's procedure yearly.

Nonetheless, records for the above were not kept. The inspector also learned that the machines were calibrated at the job site, prior to usage, by a manufacturer representative. Review of the records in-dicated that (1) calibration records for one machine is unavailable and (2) only partial data was recorded on the calibration records for 3 machines.

J The inspector stated that IE:HQ will be contacted relative to the calibration requirements of the machine and this matter is con-

sidered unresolved. The licensee stated that manufacturer's recommendation will be obtained. (461/80-03-01).

-5-

_.

.

9.

Safety Related Piping - Observation of NDE Work Activities

.

The inspector observed magnetic particle examination of the Main Steam System Weld No. 7 (layer 5) on traveller No. 1B21-D302-D.

It was determined that (1) surface condition was acceptable; (2) procedure requirements were met; (3) personnel were properly qualified,; (4)

equipment was currently calibrated; and (5) additional grinding was required because linear indications were revealed.

.

No items of noncompliance or deviations were identified.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncom-pliance, or deviations. Unresolved items disclosed during the inspection are discussed in paragraph 8.

Exit Interview The inspector met with licensee representatives (denoted under Persons Contacted) at the conclusion of the inspection on March 6, 1980. The inspector summarized the purpose and findings of the inspection. The licensee acknowledged the information.