IR 05000461/1980017
| ML19339C790 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 11/05/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML19339C791 | List: |
| References | |
| NUDOCS 8011190479 | |
| Download: ML19339C790 (1) | |
Text
.
. --
b
.
,
/, L k
th.?
NOV 5 G80
..
~
is Docket No. 50-4 51
,,_
__
Docket No. 50-462
.: t C
EE7k Illinois Power Company
S'
_.
-
ATTN:
Mr. W. C. Gerstner jj az
__
Executive Vice President
c3 500 South 27th Street
--
.-
Decatur, IL 62525 Gentlemen:
Thank you for your letter dated October 24, 1980, informing us of the steps you have takea to correct the items of noncompliance which we brought to your attention in Inspection Report No. 50-461/80-17 forwarded by our letter dated September 11, 1980. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc w/ltr dtd 10/24/80:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General Mr. Ga ry N. W ' Chief Division o'
- Cafety RIII RIII RIII
,f-2?(
N 4Clb
.
/
-
-
Wescott Knop Fiorel 1
@ +--
11/4/80 8011140V/f Q
-
-