IR 05000461/1980016
| ML19347C230 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/30/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML19347C231 | List: |
| References | |
| NUDOCS 8010170067 | |
| Download: ML19347C230 (1) | |
Text
.
-
.__
..
.
. _ _ _ _
---
__________
l l
p nracy i.
'o UNITED STATES
'
["-
gg
- (. t NUCLEAR REGULATORY COMMISSION
[f 6 REGION lli
,
o, 799 ROOSEVELT ROAD
%,
GLEN ELLYN, ILLINOIS 60137
.....
t SEP 3 0 G80 i
l Docket No. 50-461 Illinois Power Company ATTN: Mr. W. C. Gerstner
!
!
Executive Vice President
!
500 South 27th Street Decatur, IL 62525 Gentlemen:
Thank you for your letter dated September 19, 1980, informing us of the steps you have taken to correct the items of noncompliance which we brought to your attention in Inspection Report No. 50-461/80-16 forwarded by our letter dated August 28, 1980.
We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, l
l
5' G. Fiorelli, Chief Reactor Construction and Engineering Support Brarch j
cc w/ltr dtd 9/19/80:
J Central Files
!
Reproduction Unit NRC 20b l
TIC Mr. Dean Hansell, Office of Assistant Attorney General l
Mr. Gary N. Wright, Chief i
Division of Nuclear Safety I
.
!
.
l l
80101roo67
_
.
.-