OCT 29 886
Docket No. 50-456
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767.
Chicago, IL 60690
Gentlemen:
This refers to the anncunced preoperational physical protection inspection con-
ducted by Messrs.
J. L. Belanger, J. R. Kniceley, and Ms. G. M. Christoffer of
this office on September 2-5, 15-19, and 22, 1986, of activities at the Braidwood
Nuclear Power Station, Unit 1, authorized by NRC Construction Permit No. CPPR-132
and to the discussion of our findings with Mr. E. E. Fitzpatrick at the conclusion
{
of the inspection.
\\;
The enclosed copy of our inspection report identifies the functional areas
of your approved security plan examined during this inspection. Within these
areas, the inspection consisted of a selective examination of procedures
and representative. records, observations, and interviews with personnel.
The inspection showed that several key elements of the security program were
not adequately implemented.
These areas related to the security computer
system / security alarm response, lighting /CCTV surveillance capabilities
during night hours, vital area barriers, and the emergency power supply
for th2 security system. Our concerns in these areas were discussed at
the exit meeting, at which time we stated that our review showed that the
security program, implemented at that time, could not support fuel load.
Our next inspection of the security program was scheduled for the week of
September 29, 1986.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2). This information must be handled and protected in
accordance with the provisions of 10 CFR 73.21.
Consequently, our report of this inspection will not be placed in the NRC
Public Document Room.
l l-
3
. s
-
'[
e611070209 861029
ADOCK 05000456
Enclosure contains
G
SAFEGUARDS INFORMATION
_
,,
Upon separation this
F SJ is Decontrolled
,
'
,
h
h
Commonwealth Edison Company.
2
OCT 291986
-
<
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
[
. Axelson, Chief
uclear Materials Safety
,
I
and Safeguards Branch
Enclosure:
Inspection Report
No. 50-456/86048(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
See Attached Distribution
i
!
l
RIII
RIII
RIII \\
)
III
RIII
R
III
Belanger/ls
Kn
ey
Christoffer
C
ed
Weti
Liptg
os re contains
xelson
/[l
Er
U
1
p a i n th s
rg a is Dgcontrolled____
e
'
.
WM?fi9CMi@+W6N
Commonwealth Edison Company
3
OCT 29 WO6
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Supervisor
IE File
IE/DI/0RPB
IE/ES
NMSS/SGPL
NRR/PWR-B/SSPB
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCS/RSB (RIDS)
Licensing Fee Managemer,t Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
,
I
G. Berry, ELD
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
1
Enclosure contains
SAFEGUARDS INFORMATION
^=---.,---
Up n separation this
, , , , - , , , , , , ,
,
MI LUU/iliUU is a v n h,in ,, U,\\
w is DeconwoM
l