Forwards Safeguards Insp Rept 50-456/86-42 on 860825.No Violations Noted.Failure to Fully Implement Security Program Could Have Adverse Impact on NRC Recommendation for License Issuance
ML20210A969
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 09/12/1986
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20210A975 List:
References
NUDOCS 8609170410
Download: ML20210A969 (3)


See also: IR 05000456/1986042

Text

DIk

'

M r-

n r e n n v m

AD 5 4 STIM

w u < _u vril w n i,

u n a s, i i v il

SEP 121986

Docket No. 50-456

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the telephone conversation between Messrs. J. Brennan and

B. Saunders of your staff and Messrs. J. Creed and J. Belanger of this office

on August 22, 1986 regarding the findings of the Safeguards System Assistance

Visit conducted August 18-22, 1986 by members of your corporate nuclear staff.

-

This also refers to the special physical protection inspecticn conducted by

Messrs. J. Belanger and J. Kniceley of this office on August 25, 1986 of

activities at the Braidwood Nuclear Power Station, Unit 1, authorized by NRC

Construction Permit No. CPPR-132 and to the discussion of our findings with

Mr. C. Schroeder at the conclusion of the inspection.

On the recommendation of Messrs. Brennan and Saunders, we delayed our announced

preoperational security inspection from the week of August 25-29, 1986 to the

period of September 2-19, 1986. We understand this recommendation was based on

the need for additional-time to resolve two significant issues identified

during this assistance visit. Our inspection conducted on August 25, 1986

consisted of a review of the audit report and the corrective actions initiated.

No violations of NRC requirements were identified during the course of this

inspection.

We need to point our concerns regarding the ability of your security program to

support the commitments needed for license issuance or fuel load. As discussed

" with your staff and stated in Paragraph 3 of the enclosed report, your manage-

ment shares our concern regarding the recently noted inadequacies.

Failure to

fully implement your security program could have an adverse impact on our

recommendation for license issuance. Additional management attention is needed

in order to correct these problems.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Pegulations,

Section 73.21(c)(2). This information must be handled and protected in

h(

accordance with the provisions of 10 CFR 73.21. Consequently, our report of

,O

this inspection will not be placed in the NRC Public Document Room,

p

l

Enclosure Contains

SAFEGUARDS I!WonitATIO!!

Upon Separation This

Pago is Decontrolled

,

.)

8609170410 860912

PDR

ADOCK 050004S6

O

PDR

-

- - -

<

o

$%Mhh

Commonwealth Edison Company

2

SEP 121986

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

a&/

ck . Hind, Director

ivision of Radiation Safety

and Safeguards

Enclosure:

Inspection Report

No. 50-456/86042(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

IE Files

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/PWR-B/SSPB

ACRS

Distribution Continued

RIII

RIII

RIII

I

RIII

II

Ah hon

11

Bol ger/bls

Kn

ley

ed

Li

e

EnclosurecontaIns

SAFEGUARDS INFORMATION

I%hhh

ge

c

o1

.\\

Commonwealth Edison Company

3

SEP 1219BS

Distribution

cc w/ enclosures, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

,

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

Enclosure contains

SAFEGUARDS INFORMATION

cc

ro e