IR 05000443/1981007

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-443/81-07 & 50-444/81-06 on 810526-0626 & Notice of Violation
ML20009H646
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 07/22/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tallman W
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20009H647 List:
References
NUDOCS 8108100321
Download: ML20009H646 (2)


Text

~

_

,

,

..

,

Docket !!os. 50-443 82 E 50-444 f

w s

Public Service Company of New Harpshire

'

//

hg A1TH: Mr. W. C. Tallman c.

I

,

.

Chairman and Chief Executive Officer i~ "UG077 M%

1000 Elm Street F-9 Manchester, New Hampshire 03105

D=%'"an,Q Q

P Gentlemen:

C

.

.v,,

-

Subject: Combined Inspection 50-443/81-07 and 50-444/81-06 This refers to the routine safety inspection conducted by Mr. A. Cerne of this office on May 26 through June 26, 1931, at the Seabrook Station, Units 1 and 2 Seabrook, New Hampshire of activities authorized by HRC License Nos. CPPR-135 and CPPR-136 and to the discussions of our findings held by Mr. Cerne with Messrs. Singleton, Philbrick and otheis of your staff at the conclusion of the inspection.

-

Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your activities was not conducted in full cornpliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance has been categorized.into the levels described in the Federal Regisar Notice r

(45 FR 66754) dated October 7, 1980, This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Although Section 2.201 requires you to submit to this office, within 25 days of your receipt of this notice, a written statement of explanation, we note that this item of noncompliance was corrected prior to the completion of our inspection, and therefore, no response with respect to this matter is required.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractors) believe to notify this office by telephone within ten (10)) days from the date of thisbe exempt fra letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office 8:08100321 810722 PDR ADOCK 05000443 T"88[

_ a, %, Q

POR 4

- y A....

..g D,oRg..

l.

.

.

gp

'

..fiEn.

cmc..llIrMP

%--l..t

.

...

..

.. $.

.......o(.

.7/h'...

.

.

..

.

,

@/..

. Ga

.... B.tugt..

,

,,.,,,.

,,

.

,,,,.,

""*;. 7/8/.8i.

.,

...

..

, NRC FORM 318 (10-80) NRCM O240

.

.

.

.... - -

-

._

'

.

-

.

Public Service Cocpany of New

JUL o o 1981

  • ~

Hampshire i

to withhold such information. Consistent with section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the

,

information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed

~

that the information should be withheld from public disclosure. This section

further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted at.ove, the report will be placed in the Public Document Room. The telephone notification of your intent to request withholding, or any request for an extension of the 10 day perind which you believe necessary, should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased to discuss then with you.

Sincerely, ts/exewe Eldon J. Brunner, Chief, Projects Branch #1, Division of Resident

and Project Inspection

,

Enclosures:

1.

Appendix A, Notice of Violation

'

2.

Office of Inspection and Enforcement Combined Inspection Report Hos. 50-443/81-07 and 50-444/81-06 e

i cc w/encls:

John DeVincentis, Project Manager Public Document Room (PDR)

Lccal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

bcc w/encls:

Document Managemerit Branch TIDC (For Distribution)

REG:I Reading Room State of New Hampshire

'

Chief, Operational Support Section (w/o encis)

NRC Resident Inspector

,

"'c'>

.............

...

......

........

............

..

........

...........

....

......

' """^"'>

...................

..............

...........

...............

......

.......

..

..............

DATEh

.................

...............

...................

...

..........

...............

...............

..................

}nc ronu m oo..o. unca o2'

OFFICIAL RECORD COPY m