U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
.
Region I 50-443/81-11 Report Nos. 50-444/81-09 50-443 Docket Nos.'50-444 CPPR-135
- License-Nos. CPPR '36 Priority
--
Category B
Licensee:
Public Service Company of New Hampshire 1000 Elm Street Manchester, New Hampshire 03105 Facility Name:
Seabrook Station,' Units 1 and 2 Meeting At:
Seabrook, New Hampshire
,
Meeting Conducted: October 15, 1981 NRC Personnelj MM
/f!
p)
,A'. C. Cern~e, Senior Resident Inspector date sihned
.
date signed Approved By:
// 34
/
. M. Gallo, Chief, Reactor Projects Section
'ddte (igned 1A, Projects Branch No. 1, DRPI Meeting Summary:
Meeting on October 15, 1981 (Combined Report Nos. 50-443/81-11 and 50-444/81-09)
Scope:
Special, announced management meeting to discuss the results of the Region I board convened to evaluate the licensee's performance from July 1, 1980 to June 30, 1981, as part of the NRC's SALP program. Areas addressed included: Quality Assurance; Site Preparations and Foundations; Containment Structure; Safety-Related Components; Electrical; Instrumentation; Fire Protection; Preservice Inspection; Corrective Actions and Reporting; Procurement; Design and Design Changes; and Training.
Results: A summary of the licensee performance evaluation was presented.
8112160172 011204 PDR ADOCK 05000443
.
-
--
-
-,
3._
o -
r
.
DETAILS 1.
LyenseeAttendees 0. N. Merrill, Executive Vice President (PSNH)
W. P. Johnson,- Vice President (YAEC)
8. B. Beckley, Manager of Nuclear Projects (PSNH)
R. P. Pizzuti, Construction Manager (YAEC)
J. DeVincentis, Seabrook Project Manager (YAEC)
G. F. Mcdonald, Jr., Quality Assurance Manager (YAEC)
J. W. Singleton, Field Quality Assurance Manager (YAEC)
A. M. Shepard, Director of QA (YAEC)
J. P. Cady, Jr., Compliance Manager (PSNH)
W. B. Sturgcon, Jr., Station Mtnager (PSNH)
V. L. Killnack, ~Jr., Nuclear Quality Manager (PSNH)
S. D. Floyd, Operations Engineer (PSNH)
-
'2.
NRC Attendees R. C. Haynes, Regional Administrator, Region I R.' Starostecki, Director, DRPI, Region I
.
R. M. Gallo, Chief, RPSIA, DRPI, Region I A. C. Cerne, Sr. Resident Inspector, Region I L. Wheeler, LPM, NRR 3.
Discussion A brief summary of the Systematic Appraisal of Licensee Performance (SALP) Program was presented to explain the basis and purpose of the evaluation.
The NRC Region I evaluation board meeting was discussed, including the appraisal period, performance data and the results of the board's evaluation.
The SALP Cycle 2 evaluation report will be issued and distributed subsequent to NRC management's approval of SALP program changes which implement the Commission's guidance of October 20, 1981.
This guidance is documented in NRC report NUREG-0834, "NRC Licensee Assessments."