IR 05000443/1981010
| ML20039F528 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 12/18/1981 |
| From: | Devlin J, Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20039F522 | List: |
| References | |
| 50-443-81-10, NUDOCS 8201130073 | |
| Download: ML20039F528 (1) | |
Text
.
,
SAFEGUARDS INF0PJ1ATION t
... -
-
.
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION I
Report No.
50-443/81-10 Docket No.
50-443 License No. CPPR-135 Safeguards Group IV Licensee:
Public Service Company of New Hampshire 1000 Elm Street Manchester, New Hampshire 03105 Facility Name: Seabrook Unit 1
_
Inspection At: Seabrook,New Hampshire Inspection conducted:
September 28-30, 1981 Date of Last Physical Protection-Inspection: Initial Physical Protection
_
s Inspection Type of.Inspec 'o : Mecial, Annou'nced Physical Protection Inspection Inspectors:
.(
IKf Iy h/
G. C. Smith, Physical Protection dafte s[igned Inspector Approved by f/sd
/)-- J-
/
. Devlin, Chief, Physical d(te svigned Protection Section, Technical Inspection Branch
,
Inspection Sunnary:
Special, Announced Physical Protection Inspection on September 28-30, 19E:
(Report No. 50-443/81-10)
Area Inspected:
The inspection involved a review of the licensee's proposed Physical Security Plan by a NRC regional-based inspector and Nuclear Material Safety and Safeguards (NMSS) representatives.
The inspection involved 16 inspector hours onsite.
Results : The proposed Physical Security Plan was found to require clarification in several areas which were identified during this inspec-tion.
"
8201130073 81123i PDR ADOCK 05000443 WARNING:
G PDR S-F1-81-143 UNAUTHORIZED DISCLOSURE IS PROHIBITED, SECTION 147 opy of Copies ATOMIC ENERGY ACT 1954 AND 10 CFR 73.21 VIOLATIONS Pages SUBJECT TO CIVIL AND CRIMINAL SANCTIONS.
REVIEWED BY:
[p
/
/,f/
ENCLOSURE CONTAINS.
jjj UPON SEPARATION THIS PAGE IS DECONTROLLEO.
(JAMISW.DdLIN
/ NRC IF:I - TIB