Text
_ __
U.S. NUCLEAR REGUI.ATORY COMMISSION
'
'
OFFICE OF INSPECTION AND ENFORCEMENT Region I
-
,
Report No. 50-412/81-04 Docket No.
50-412 Category B
License No.
CPPR-105 Priority
--
Licensee:
Duquesne Light Company 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Facility Name:
Beaver Valley Power Station, Unit 2 Meeting at:
Shippingport, Pennsylvania Meeting conducted:
May 19, 1981
[4 J' 2 2 - P/
Inspectors:
1.
=-
E. G. Greenman, Chief, Reactor Projects date signed Section 2A, DRPI
$
_./[
F-21 F/
._
G. Walton, Project Inspettdr date signed
,
.
Approved by:
f
[- 2[-O
,
f. R. Keiarfg] Chief jects Branch date signed
/No.2,DRPIf Meeting Sumary:
Meeting on May 19, 1981 (Report No. 50-412/81-04)
Scoce: Special, announced management meeting to discuss the results of the Region I board convened to evaluate the licensee's performance from March 1,1980 to February 28,1981 as part of the NRC's SALP program. Areas addressed included, but were not limited to: quality assurance; reporting; and, management.
Results: A sumary of the licensee performance evaluation was presented.
Develop-ment of the NRC's SALP program was slso discussed.
Jg106 0 h
-
.
.
-
..
. - -._
.
-.
.- _
-
-
.
DETAILS
-
1.
Licensee Attendees R. Washabaugh, QA Manager 2.
NRC Attendees E. G. Greenman, Chief, Reactor Projects Section No. 2A, DRPI G. Walton, Reactor Inspector 3.
Discussion A brief summary of the Systematic Appraisal of Licensee Performance (SALP)
Program was presented to explain the basis and purpose of the evaluation.
The NRC Region I evaluation board meeting was discussed including the appraisal period, performance data and the results of the board's evaluation (See Appendix 1 and Attachments 1 and 2).
The licensee's cverall performance was considered acceptable.
.
I l
l l
l l
l l
-
.-
--.
. -
- -.
_ _ _ _ -. -.
. _ - _
.
.
- -.-.
.
- .
.
APPENDIX 1
.
..
.
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE BEAVER VALLEY POWER STATION UNIT 2 REGION I EVALUATICN _JARD MEETING Facility:
Beaver Valley Power Station Unit 2 Licensee:
Duquesne Light Company Unit Identification:
Docket No.
License No./Date of Issue Unit No.
50-412 CPPR 105 May 3, 1974
Reactor Information:
NSS: Westinghouse MWT:
2660 Assessment Period:
March 1, 1980 - February 28, 1981 Evaluation Board Meeting 0.te:
April 13, 1981
.
'
Review Board Members:
J. M. Allan, Deputy Director, Region I
-
E. J. Brunner, Acting Director, Division of Resident and Project Inspection, RI
, _ _
G. H. Smith, Director, Division of Emergency Preparedness and Operational Support, RI T. T. Martin, Acting Director, Division of Engineering and Technical Inspection l
R. Xeimig, Chief, Projects Branch 2, Division of l
Resident and Project Inspection
!
K. N. Jabbour, Project Manager, Light Water Reactor Branch 3, OL, NRR Other NRC Attendees:
E. G. Greenman, Chief, Reactor Projects Section 2A, DRPI, RI R. A. Feil, Reactor Inspector, RI l
R. Wessman, Senior Reactor Operations Specialist l
l
,
.
+3
-
- - -. +
,
Attachment 1
.
-
BEAVER VALLEY POWER STATION UNIT 2 LICENSEE PERFORMANCE DATA
-
Assessment Period:
March 1,1980 to February 28, 1981
!
A.
riumber and Nature of Noncompliance Items 1.
Noncompliance Category Violations
Infractions
Deficiencies O
Deviations
2.
Areas of Noncompliance Qual'ity Assurance
.
,!
e e
e
.-
- - -
,-.
y
-
---,,.-e
.
.--"T'----
- ~~-~--?-"-P'
'-r'r'--
Y--
T'm=
"w-ew-r*--
yy-*
-
.
-
.
e BEAVER VALLEY POWER STATION UNIT 2
-
LICENSEE PERFORMANCE DATA Assessment Period: March 1,1980 to February 28, 1931 B.
Number and Nature of Licensee Event Reports During the assessment period six (6) construction deficiency reports (CDR's) were submitted by the licensee.
Two (2) COR's were the result of
'
construction /QA errors, one (1) CDR resulted from a vendor /QC error, two (2) resulted from a design / fabrication error and one resulted from a component failure during preoperational testing.
1.
Type of Events a.
Construction /QA Error
.
b.
Vendor /QC Error
c.
Design / Fabrication Error
d.
Vendor / Component
2.
Causally Linked Events None
- .
3.
Licensee Event Reports Reviewed (Report Nos.)
See Summary C.
Escalated Enforcement Actions Civil Penalties None Orders None
- IMmediate Action Letters None i
!
'
__
, _ _.. _ _ - - _. _...., _ _ -, _ - _ _
..
_ _., _..
._ _,.____-
.
.
,_
= - -
_ _
- -
_
-
.
-
..
?
i BEAVER VALLEY POWER STATION, UNIT 2
~
LICENSEE PERFORMANCE DATA
.
Assessment Period: March 1,1980 to February 28, 1981 0.
Management Conferences Held During past Twelve Months None Held E.
Licensee Activities Construction activity is continuing at a reduced level.
The licensee estimates construction progress to be 40% as of January 1,1981.
This is primarily structural activity. The reactor vessel is scheduled to be placed in 1982 as well as completion of the containment liner.
The
neutron shield tank has been sent to Babcock & Wilcox for repair of linear indications on the gib gussets and on the base gusset plates.
Repairs are scheduled for completion in August 1981.
F.
Insoection Activities
Nine inspections were conducted during the assessment period.
Eight of these f.nspections included specialists.
Areas covered included concrete placement, structural steel welding, pipe welding and radiography, el,ectrical and instrumentation installation procedures, equipment storage & repair to the neutron shield tank.
The facility received 430 inspection hours during the assessment period.
'
G.
Investications None i
I
'
l
.
i
.
- r, ee-i--,
t
-- -
-m.--,
.y:,
ww-9-
,
-..,-p9y
-=mi+-wev t-y
-
4---s9n--w t=*nMt-r-PT
'd
-
W*-V'-W
""
T-**
- M+w
--'
="-'t'-
-V
_,.
- _.
_
.-
ATTACHMENT 2
...-
l
'
.
BEAVER VALLEY. POWER STATION LICENSEE PERFORMANCE
,
i UNIT 2 CONSTRUCTION Above Below Functional Area Average Average Average 1.
Quality Assurance X
2.
Substructure and Foundations X
I 3.
Concrete X
4.
Liner (Containment and Others)
X 5.
Safety-Related Structures X
'
!
6.
Piping and Hangers (Reactor Coolant and Others)
X 7.
Safety-Related Components (Vessel, Internals; and HVAC)
X i
t.
8.
Electrical Eouicment X
-
9.
Electrical (Tray and Wire) -
X l
10.
Instrumentation X
11.
Fire Protection X
12.
Preservice Inscection X
13.
Recorting X
Environmental X
15. Training X
16. Management X
to W.
Q Uputy Regional Director
-
4/a/ri
' Datt
'
l,-...---._-._-
--
_
,_,
_ _ _ _ _ _ _,
__
_
_