IR 05000400/2024006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2024006
ML25066A163
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/11/2025
From: Matthew Fannon
NRC/RGN-II/DORS/PB2
To: Haaf T
Duke Energy Progress
References
IR 2024006
Download: ML25066A163 (1)


Text

March 11, 2025

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2024006

Dear Thomas Haaf:

The NRC has completed its end-of-cycle performance assessment of Shearon Harris Nuclear Power Plant, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC concluded that overall performance at your facility preserved public health and safety.

The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Shearon Harris Nuclear Power Plant during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,

Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2026. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. Please contact me at 404-997-4547 with any questions you have regarding this letter.

Sincerely, Matthew S. Fannon, Chief Projects Branch 2 Division of Operating Reactor Safety Docket No.:

50-400 License No.:

NPF-63 Enclosure:

Inspection Plan cc: Distribution via ListServ Signed by Fannon, Matthew on 03/11/25

ML25066A163 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DORS RII/DORS NAME A. Wilson M. Fannon DATE 03/10/25 03/11/25

Site Inspection Activity Plan Harris 03/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count CYBER SECURITY INSPECTION

1 4/21/2025 4/25/2025 IP 71130.10 000741 Cybersecurity EMERGENCY PREPAREDNESS EXERCISE INSPECTION

1 4/28/2025 5/2/2025 IP 71114.01 000716 Exercise Evaluation

4/28/2025 5/2/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

4/28/2025 5/2/2025 IP 71151 001397 Performance Indicator Verification MATERIAL CONTROL AND ACCOUNTING

SECURITY BASELINE INSPECTION

1 6/23/2025 6/26/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

6/23/2025 6/26/2025 IP 71130.07 000739 Security Training HARRIS INITIAL LICENSE EXAM

1 6/8/2025 6/14/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

7/13/2025 7/26/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

UNIT 1 POST-APPROVAL LICENSE RENEWAL PHASE 2

1 8/4/2025 8/8/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal

8/18/2025 8/22/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal FOCUSED ENGINEERING INSPECTION (CGD)

1 8/25/2025 8/29/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

9/22/2025 9/26/2025 IP 71111.21N.03 001808 Commercial Grade Dedication RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION

1 10/6/2025 10/10/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

10/6/2025 10/10/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

10/6/2025 10/10/2025 IP 71151 000746 Performance Indicator Verification UNIT 1 IN-SERVICE INSPECTION

HARRIS REQUAL INSPECTION

1 12/15/2025 12/19/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance FOCUSED ENGINEERING INSPECTION (AGE-RELATED)

SECURITY BASELINE INSPECTION

Enclosure

5/12/2025 5/16/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)

10/13/2025 10/17/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

3/23/2026 3/27/2026 IP 71111.21N.04 001832 Age-Related Degradation

4/6/2026 4/10/2026 IP 71111.21N.04 001832 Age-Related Degradation

Site Inspection Activity Plan

4/13/2026 4/16/2026 IP 71130.02 000734 Access Control

4/13/2026 4/16/2026 IP 71130.05 000737 Protective Strategy Evaluation

4/13/2026 4/16/2026 IP 71130.09 001656 Security Plan Changes

4/13/2026 4/16/2026 IP 71130.14 000743 Review of Power Reactor Target Sets

4/13/2026 4/16/2026 IP 71151 001338 Performance Indicator Verification EMERGENCY PREPAREDNESS PROGRAM INSPECTION

1 4/27/2026 5/1/2026 IP 71114.02 000717 Alert and Notification System Testing

4/27/2026 5/1/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

4/27/2026 5/1/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

4/27/2026 5/1/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness

4/27/2026 5/1/2026 IP 71151 001397 Performance Indicator Verification RP OCCUPATIONAL AND PUBLIC RAD SAFETY BASELINE INSPECTION

1 6/22/2026 6/26/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

6/22/2026 6/26/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

6/22/2026 6/26/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program

6/22/2026 6/26/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

6/22/2026 6/26/2026 IP 71151 000746 Performance Indicator Verification POST-APPROVAL LICENSE RENEWAL PHASE 3 (CONTINGENT)

1 7/13/2026 7/17/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal PROBLEM IDENTIFICATION AND RESOLUTION

1 8/17/2026 8/21/2026 IP 71152B 000747 Problem Identification and Resolution

8/31/2026 9/4/2026 IP 71152B 000747 Problem Identification and Resolution HARRIS INITIAL LICENSE EXAM

1 11/1/2026 11/7/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

12/6/2026 12/19/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

2