SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000400/2024420

Dear Thomas Haaf:

On December 5, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Power Plant, Unit 1 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket No. 05000400 License No. NPF-63

Enclosure:

As stated

Inspection Report

Docket Number:

05000400

License Number:

NPF-63

Report Number:

05000400/2024420

Enterprise Identifier:

I-2024-420-0009

Licensee:

Duke Energy Progress, LLC

Facility:

Shearon Harris Nuclear Power Plant, Unit 1

Location:

New Hill, NC

Inspection Dates:

November 04, 2024, to December 06, 2024

Inspectors:

C. Roundtree, Team Leader, NSIR

T. Barry, Sr. Physical Security Inspector, NSIR

C. Bustamante, Physical Security Inspector, NSIR

J. Wallo, Sr. Physical Security Inspector, R II

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

Summary

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting a security baseline inspection at Shearon Harris Nuclear Power

Plant, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight

Process is the NRCs program for overseeing the safe operation of commercial nuclear power

reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

Inspection Scopes

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for

Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and

records, observed activities, and interviewed personnel to assess licensee performance and

compliance with Commission rules and regulations, license conditions, site procedures, and

standards.

Safeguards

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1)

NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in

implementing the physical protection program to detect, assess, interdict, and

neutralize threats up to, and including, the design basis threat of radiological

sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

Report Attachments

Supplemental Information for the report is considered Safeguards Information and is

located separately within the NRCs Safeguards Information Local Area Network and

Electronic Safe database (SLES), under NS126176.

Inspection Results

No findings were identified.

Exit Meetings and Debriefs

The inspectors verified no proprietary information was retained or documented in this report.

On December 5, 2024, the inspectors presented the security baseline inspection results

to Thomas Haaf and other members of the licensee staff.

Documents Reviewed

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CAP # 02537168

12/02/2024

CAP # 02537472

12/04/2024

CAP # 02537482

12/04/2024

CAP # 02537565

12/04/2024

CAP # 02537566

12/04/2024

Corrective Action

Documents

CAP # 02537619

12/05/2024

Duke Energy Progress-Brunswick Physical Security Plan,

Security Training and Qualification Plan

Revision 16

Dated

04/10/2023

Protective Strategy Brief

Revision 20

Dated

09/12/2018

AD-SY-ALL-0560

Security Drill and Exercise Program

Revision 11

Date

11/01/2023

AD-SY-HNP-

0251

Contingency Response

Revision 01

Dated

10/18/2023

AD-SY-HNP-

0254

HNP Protective Strategy

Revision 02

Dated

03/28/2024

CSD-SY-HNP-

0130-02

HNP Formal Target Sets

Revision 01

Dated

10/03/2023

71130.03

Procedures

LP-SY-ALL 0559

Controller/Evaluator Training

ML25007A227

OFFICE

NSIR/DSO/SPEB

R-II/DRS/PSB

NSIR/DSO/SPEB/ETA NSIR/DSO/SPEB

/ETA

NAME

CBustamante

JWallo

CRoundtree

JClark

DATE

Jan 8, 2025

Jan 10, 2025

Jan 13, 2025