SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000400/2024420
Dear Thomas Haaf:
On December 5, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Power Plant, Unit 1 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket No. 05000400 License No. NPF-63
Enclosure:
As stated
Inspection Report
Docket Number:
05000400
License Number:
Report Number:
Enterprise Identifier:
I-2024-420-0009
Licensee:
Duke Energy Progress, LLC
Facility:
Shearon Harris Nuclear Power Plant, Unit 1
Location:
New Hill, NC
Inspection Dates:
November 04, 2024, to December 06, 2024
Inspectors:
C. Roundtree, Team Leader, NSIR
T. Barry, Sr. Physical Security Inspector, NSIR
C. Bustamante, Physical Security Inspector, NSIR
J. Wallo, Sr. Physical Security Inspector, R II
Approved By:
Jefferson K. Clark, Chief
Security Performance Evaluation Branch
Division of Security Operations
Summary
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting a security baseline inspection at Shearon Harris Nuclear Power
Plant, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight
Process is the NRCs program for overseeing the safe operation of commercial nuclear power
reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
Inspection Scopes
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for
Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and
records, observed activities, and interviewed personnel to assess licensee performance and
compliance with Commission rules and regulations, license conditions, site procedures, and
standards.
Safeguards
71130.03 - Contingency Response - Force-On-Force Testing
Contingency Response - Force-On-Force Testing (1 Sample)
(1)
NRC inspectors completed the Contingency Response - Force-on-Force (FOF)
Testing inspection procedure by evaluating the licensees performance in
implementing the physical protection program to detect, assess, interdict, and
neutralize threats up to, and including, the design basis threat of radiological
sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.
Report Attachments
Supplemental Information for the report is considered Safeguards Information and is
located separately within the NRCs Safeguards Information Local Area Network and
Electronic Safe database (SLES), under NS126176.
Inspection Results
No findings were identified.
Exit Meetings and Debriefs
The inspectors verified no proprietary information was retained or documented in this report.
On December 5, 2024, the inspectors presented the security baseline inspection results
to Thomas Haaf and other members of the licensee staff.
Documents Reviewed
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CAP # 02537168
12/02/2024
CAP # 02537472
12/04/2024
CAP # 02537482
12/04/2024
CAP # 02537565
12/04/2024
CAP # 02537566
12/04/2024
Corrective Action
Documents
CAP # 02537619
12/05/2024
Duke Energy Progress-Brunswick Physical Security Plan,
Security Training and Qualification Plan
Revision 16
Dated
04/10/2023
Protective Strategy Brief
Revision 20
Dated
09/12/2018
AD-SY-ALL-0560
Security Drill and Exercise Program
Revision 11
Date
11/01/2023
AD-SY-HNP-
0251
Contingency Response
Revision 01
Dated
10/18/2023
AD-SY-HNP-
0254
HNP Protective Strategy
Revision 02
Dated
03/28/2024
CSD-SY-HNP-
0130-02
HNP Formal Target Sets
Revision 01
Dated
10/03/2023
Procedures
LP-SY-ALL 0559
Controller/Evaluator Training
OFFICE
NSIR/DSO/SPEB
R-II/DRS/PSB
NSIR/DSO/SPEB/ETA NSIR/DSO/SPEB
/ETA
NAME
CBustamante
JWallo
CRoundtree
JClark
DATE
Jan 8, 2025
Jan 10, 2025
Jan 13, 2025
Jan 14, 2025