IR 05000397/1995006

From kanterella
Jump to navigation Jump to search
Insp Rept 50-397/95-06 Cancelled
ML17291B005
Person / Time
Site: Columbia 
Issue date: 08/31/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
50-397-95-06, 50-397-95-6, NUDOCS 9509050039
Download: ML17291B005 (6)


Text

~ <Pg ABACI

~C

+

yp UNITED STATES NUCLEAR REGULATORY COMMtSSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 760114064 Ns 3t I95 Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, MD 1023 Richland, Washington 99352 SUBJECT:

NRC INSPECTION REPORT 50-397/95-06 NRC Inspection Report 50-397/95-06 has been cancelled; therefore, no inspection report will be issued for this report number.

Sincerely, Docket:

50-397 License:

NPF-21 homas P.

Gwynn, Di 'ect r Division of Reactor ety CC:

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, MD 927M Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

Chief Counsel 3000 George Washington Way P.O, Box 968, HD 396 Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172

~

~

~

~

Olympia, Washington 98504-3172 9509050039 950831 PDR ADQCK 05000397

PDR y0 lQ

Washington Public Power Supply System Washington Public Power Supply System ATTN:

P.

R. Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Nail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190 Prosser, Washington 99350-0190 Winston E Strawn

. ATTN:

H. H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System E-Hail report to D. Sullivan (DJS)

E-Hail report to NRR Event Tracking System (IPAS)

~'bcc. to DHB (IE01)

DRS bcc distrib.

by RIV:

L. J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

H.

Hammond (PAO, WCFO)

DOCUMENT NAME:

0:itWNCAN506.LTR To receive copy of document, indicate In box: "C" ~ Copy witho t enclosures

"e" ~ Copy w'th en losures "N" ~ No copy RE'EB:DRS HFRunyan:c

o 95 AC:

E Col ins

95 D:DRP D:DRS JEDye TPGwyn

9 08/2

/95 OFFICIAL RECORD COPY D:DRS TPGwynn 08/3 /95

Washington Public Power Supply System-3-E-Hail report to D. Sullivan (DJS)

E-Hail report to NRR Event Tracking System (IPAS)

bcc to DHB (IE01)

DRS bcc distrib.

by RIV:

L. J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

H.

Hammond (PAO, WCFO)

DOCUMENT NAME:

0: iWNCAN506.LTR To receive copy of document, indicate in box: "C

~ Copy witho t enclosures

"E" ~ Copy w'th en losures "N

~ No copy RE:EB:DRS HFRunyan:c

9 95 AC:

E Col ins

95 D:DRP D:DRS JEDye TPGwyn

9

.

OFFICIAL RECORD COPY D:DRS TPGwynn 08/3 /95

0