IR 05000397/1995006
| ML17291B005 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/31/1995 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| 50-397-95-06, 50-397-95-6, NUDOCS 9509050039 | |
| Download: ML17291B005 (6) | |
Text
~ <Pg ABACI
~C
+
yp UNITED STATES NUCLEAR REGULATORY COMMtSSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 760114064 Ns 3t I95 Washington Public Power Supply System ATTN:
J.
V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.
Box 968, MD 1023 Richland, Washington 99352 SUBJECT:
NRC INSPECTION REPORT 50-397/95-06 NRC Inspection Report 50-397/95-06 has been cancelled; therefore, no inspection report will be issued for this report number.
Sincerely, Docket:
50-397 License:
NPF-21 homas P.
Gwynn, Di 'ect r Division of Reactor ety CC:
Washington Public Power Supply System ATTN:
J.
H. Swailes, WNP-2 Plant Manager P.O.
Box 968, MD 927M Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
Chief Counsel 3000 George Washington Way P.O, Box 968, HD 396 Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:
Frederick S. Adair, Chairman P.O.
Box 43172
~
~
~
~
Olympia, Washington 98504-3172 9509050039 950831 PDR ADQCK 05000397
PDR y0 lQ
Washington Public Power Supply System Washington Public Power Supply System ATTN:
P.
R. Bemis, Director Regulatory and Industry Affairs P.O.
Box 968 (Nail Drop PE20)
Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:
Chairman P.O.
Box 190 Prosser, Washington 99350-0190 Winston E Strawn
. ATTN:
H. H. Philips, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
Washington Public Power Supply System E-Hail report to D. Sullivan (DJS)
E-Hail report to NRR Event Tracking System (IPAS)
~'bcc. to DHB (IE01)
DRS bcc distrib.
by RIV:
L. J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Leah Tremper (OC/LFDCB, HS:
TWFN 9E10)
Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)
H.
Hammond (PAO, WCFO)
DOCUMENT NAME:
0:itWNCAN506.LTR To receive copy of document, indicate In box: "C" ~ Copy witho t enclosures
"e" ~ Copy w'th en losures "N" ~ No copy RE'EB:DRS HFRunyan:c
o 95 AC:
E Col ins
95 D:DRP D:DRS JEDye TPGwyn
9 08/2
/95 OFFICIAL RECORD COPY D:DRS TPGwynn 08/3 /95
Washington Public Power Supply System-3-E-Hail report to D. Sullivan (DJS)
E-Hail report to NRR Event Tracking System (IPAS)
bcc to DHB (IE01)
DRS bcc distrib.
by RIV:
L. J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)
H.
Hammond (PAO, WCFO)
DOCUMENT NAME:
0: iWNCAN506.LTR To receive copy of document, indicate in box: "C
~ Copy witho t enclosures
"E" ~ Copy w'th en losures "N
~ No copy RE:EB:DRS HFRunyan:c
9 95 AC:
E Col ins
95 D:DRP D:DRS JEDye TPGwyn
9
.
OFFICIAL RECORD COPY D:DRS TPGwynn 08/3 /95
0