IR 05000397/1995099

From kanterella
Jump to navigation Jump to search
Ack Receipt of Transmitting Results of NRC SALP Insp Rept 50-397/95-99
ML17291B225
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/09/1996
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9602140243
Download: ML17291B225 (4)


Text

d 'a'

~

UN I T E 0 STATE8 NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYANPLAZA DRIVE. SUITE 400 ARLINGTON. TEXAS 76011 8064 I-L." -S

~ 6 Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, MD 1023 Richland, Washington 99352 SUBJECT:

NRC SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP)

INSPECTION REPORT 50-397/95-99 Thank you For your letter of November 27, 1995, in response to our letter of September 27, 1995, transmitting the results of the NRC's Systematic Assessment of Licensee Performance for your WNP-2 facility and our meeting with you on October 24, 1995.

We have reviewed your letter and find it responsive to the concerns raised in our letter regarding performance in the Operations and Engineering areas.

We acknowledge your comments on the weaknesses identified in the radiation protection program that offset the otherwise good performance in the Plant Support area.

I Your letter further emphasizes the ongoing efforts of the Supply System to improve the performance of WNP-2 using the Performance Enhancement Strategy (PES).

We will continue to monitor the implementation of your PES periodically through the efforts of the WNP-2 Oversight Panel.

Sincerely, Q/Regional Administrator CC:

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, HD 927M Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

Chief Counsel 3000 George Washington Way P.O.

Box 968, HD 396 Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172 9602140243 960209 PDR ADOCK 05000397 PDR

Washington Public Power Supply System

'Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Hanager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R.

Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190 Prosser, Washington 99350-0190 Winston 8 Strawn ATTN:

M. H.

Phi lips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System FEB -9 l996

~Resident Inspector

+HIS System 0)

Branch'Ch'i'ef (ORP/TSS)

0)

M, Hammondg(PAO, WCFO)

J. Clifford~ NRR Records Center, INPO S.

J

~ Collins, DPA G.

F. Sanborn, EO Carol Gordon SRIs at all RIV sites O.

D. Chamberlain, OD:DNMS Assmt, NRR B. Murray, ORS/PSB pies)

C.

A. Hackney E-Hail report to D. Nelson (OJN)

-Hail report to NRR Event Tracking System (IPA:)

jbbmste.::0(IBRP(,IE40):X

.>~a b'cc.di strib-.'by RIV:

L. J. Callan DRS-PSB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCF Leah Tremper (OC/LFOCB, HS:

TWFN 9El W. Bateman, NRR The Chairman (HS:

16-G-15)

Commissioner Rogers (MS:.

16-G-15)

B. Henderson, PAO ORP J.

M. Taylor, EDO (HS:

17-G-21)

Associate Dir. for Projects, NRR Associate Dir. for Insp.,

and Tech.

SALP Program Manager, NRR/ILPB (2 co DOCUMENT NAME:

R:)I WN2ttWN599AK.RCB Tc receive copy ol document, indicate in boiui "C" m Copy without enclosures

" "

Copy with enclosures N" m No copy C:DRP/E HJWong;df*

2/ '96 D:DRP JEDyer 2/

/96 DRA SJC ins

/96 RA Callan

  • previous y concurre OFFICIAL RECORD COPY

Washington Public Power Supply System-3-FEB -9 1996 E-Hail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

bcc to DMB (IE40)

bcc distrib.

by RIV:

L. J. Callan DRS-PSB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah,Tremper (OC/LFDCB, HS:

TWFN 9E10)

W. Bateman, NRR The Chairman (HS:

16-G-15)

Commissioner Rogers (HS:

16-G-15)

B. Henderson, PAO DRP J.

H. Taylor, EDO (MS 17-G-21)

Associate Dir. for Projects, NRR Associate Dir. for Insp.,

and Tech.

Assmt, NRR SALP Program Manager, NRR/ILPB (2 copies)

Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)

M.

Hammond (PAO, WCFO)

J. Clifford, NRR Records Center, INPO S. J. Collins, DRA G.

F. Sanborn, EO Carol Gordon SRIs at all RIV sites D.

D. Chamberlain, DD:DNHS B. Hurray, DRS/PSB C. A. Hackney DOCUMENT NAME:

R:i WN2ttWN599AK.RCB To receive copy of document, indicate in bore "C" ~ Copy without enclosures

" " - Copy wit enclosures N" a No copy C:DRP/E HJWong;df*

2/ i /96 D:DRP JEDyer 2/

/96 DRA SJC ins

/96 RA Callan

  • prev>ous y concurre OFFICIAL RECORD COPY