IR 05000397/1995019

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/95-19.Advises That Ref Violation Changed to non-cited Violation
ML17291B035
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/21/1995
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9509260097
Download: ML17291B035 (7)


Text

PRIORj: j.V Z REGULATORVMHRfi@QRNEIPHklQOTION SYSTEM (RIDS)

ACCESSION NBR:9509260097 DOC.DATE: 95/09/21 NOTARIZED:

NO DOCKET ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 UTH.NAME AUTHOR AFFILIATION LLINS,S.J.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION PARRISH,J.V.

Washington Public Power Supply System SUBJECT:

Ack receipt of 950818 ltr informing NRC of steps taken to correct violations noted in insp rept 50-397/95-19.Advises that ref violation changed to non-cited violation.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRCH/HHFB OE DIR RGN4 FILE

i RNAL: LITCO BRYCE,J H

NRC PDR

1

1 NOAC COPIES RECIPIENT LTTR ENCL ID CODE/NAME

1 CLIFFORDgJ

AEOD/DEIB

AEOD C

ILE CENT R

NRR/DORS OEAB

NUDOCS-ABSTRACT

OGC/HDS3

COPIES LTTR ENCL

1

1

1

1

1

1

1

1 YOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!COih'TACTTHE DOCUikIEYTCONTROL DESK. ROOihI Pl-37 (EXT. 504-2083

) TO EL!WIIYATEYOUR i%AWE FROM

~

~

DISl'RII!!."I'IOY,LISTS FOR DOCI.:NIEYTS YOU DOY'1 iLED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

~P'8 REC0

~C CWp0

$

Q UNITEO STATES NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZAORIVE, SUITE 400 ARLINGTON,TEXAS 76011.8064 Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, HD 1023 Richland, Washington 99352 SUBJECT:

NRC INSPECTION REPORT 50-397/95-19 AND NOTICE OF VIOLATION Thank you for your letter of August 18, 1995, in response to our letter and Notice of Violation dated July 20, 1995.

We have reviewed your reply and find it responsive to the specifics in our Notice of Violation regarding your failure to maintain a Plant Operations Committee approved procedure containing the requirements for shift and relief turnovers.

In your reply, you requested that the NRC reconsider the severity level of the violation due to a lack of safety significance.

Your justification for this position was focused on the premise that the violation was an administrative oversight that was not related to actual performance shortcomings.

We agree that the specific issue concerning the administrative approval and physical location of the shift turnover guidance is of minimal safety importance.

Therefore, in accordance with the agency's enforcement policy, the referenced violation is changed to a non-cited violation.

However, the operational significance associated w'ith inadequate turnovers should not be minimized by the Supply System.

Given that the failure to communicate important information during shift and relief turnovers has been observed on past occasions and has contributed to safety significant operational violations, the NRC does not consider the overall implications of this issue to be without significance.

Additionally, the violation was NRC identified and, as was detailed in the inspection report, the turnover which was observed by NRC during the inspection, was not carried out in accordance with either the Supply System's management expectations or its expressed guidance.

Therefore, we will review the implementation of your specific corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Moreover, your overall actions to improve control room communications, of which shift and relief turnover is an important element, will be reviewed as a part of that inspection effort.

Sincerely, a

e

.

Co ins Deputy Regional Administrator esome0097 9Soma PDR ADQCK 05000397

PDR

,

Washington Public Power Supply System Docket:

50-397 License:

NPF-21 CC:

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Hanager P.O.

Box 968, HD 927H Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

Chief Counsel 3000 George Washington Way P.O.

Box 968, HD 396 Richland, Washington 99352-0968

,Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172'ashington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Hanager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R. Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190 Prosser, Washington 99350-0190 Winston

& Strawn ATTN:

H. H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System E-Hail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System (IPAS)

bcc to DMB (IE01)

DRS bcc distrib.

by RIV:

L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

DRS AI File (95-078)

Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

DOCUHENT NAHE: 0:)WN519AK.SLH

  • Previously concurred To receive copy of document, indicete in box: "C" ~ Copy with t enclosures E" ~ Copy with enclosur No copy RE:OB:DRS C:OB:DRS D:DRS D:DRP SLHcCrory:cl *

09/19/95 JLPellet*

09 19/95 TPGwynn JEDyer

/95 09/

/95 OFFICIAL RECORD COPY 09+.L /95

Washington Public Power Supply System E-Hail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System (IPAS)

bcc to DHB ( IE01)

DRS bcc distrib.

by RIV:

L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

DRS AI File (95-078)

Resident Inspector HIS System RIV Fil e Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

DOCUMENT NAME: 0:'ttWN519AK.SLH

  • Previously concurred To receive copy of document, indicate in box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosur No copy RE:OB:DRS SLHcCrory:cl *

19 95 C:OB:DRS JLPellet*

09 19/95 D:DRS D:DRP JEDyer TPGwynn

95 09/

/95 OFFICIAL RECORD COPY

L/95