~p,R Afar,
(4 P0 Cy
-~~i t
I
~,)
0O II I
I Eh
Op I
/4, IP
~O
+***~
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011.8064 SEP 5 !995 Washington Public Power Supply System ATTN:
J.
V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.
Box 968, MD 1023 Richland, Washington 99352 SUBJECT:
NRC INSPECTION REPORT 50-397/95-03 AND NOTICE OF VIOLATION Thank you for your letter of July 17, 1995, in response to our letter and Notice of Violation dated June 16.
1995.
We have reviewed your corrective actions taken in response to Example 1 of Violation A and Violation C and find them responsive to the concerns.
With regard to your response to Example 2 of Violation A, we have reviewed the additional information provided, discussed the information with members of your staff, and concluded that the referenced modification did not affect the fire hazards analysis.
Example 2 of Violation A is withdrawn.
With regard to your response to Violation B, we have reviewed the additional information provided and concluded that the existing pump design margins combined with the ASME.Section XI in-service tests provide reasonable
'ssurance of pump operability.
As a result, Violation B is withdrawn.
The NRC emphasizes, however, that it is not the main purpose of ASME Section XI in-service testing to verify operability limits.
Accordingly, the sole reliance on. this testing to verify operability limits may not be sufficient in all instances.
Should you have any questions on this matter, please contact myself or Thomas P.
Gwynn (817/860-8248) of my staff.
Sincerely, Docket:
50-397 License:
NPF-21 a
u
.
o Deputy Regional Administrator CC:
Washington Public Power Supply System ATTN:
J.
H. Swai les, WNP-2 Plant Manager
~
~
~
~ P.O.
Box 968, HD 927H Ri chl and, Washington 99352-0968 9509080ih9 950905 PDR ADQCK 05000397
~ ~
Washington Public Power Supply System-2-Washington Public Power Supply System ATTN:
Chief Counsel 3000 George Washington Way P.O.
Box 968'D 396 Richland.
Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:
Frederick S. Adair, Chairman P.O.
Box 43172 Olympi a
~ Washington 98504-3172 Washington Public Power Supply System ATTN:
D. A.
Swanky WNP-2 Licensing Manager P.O.
Box 968 (Mail Drop PE20)
Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
P.
R. Bemis, Director Regulatory and Industry Affairs P.O.
Box 968 (Mail Drop PE20)
Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:
Chairman P.O.
Box 190 Prosser.
Washington 99350-0190 Winston 8 Strawn ATTN:
M. H. Phi lips, Esq.
1400 L Street, N.W.
Washipgton.
D.C.
20005-3502
I ~
Washington Public Power Supply System-3-E-Mail report to D. Sullivan (DJS)
E-Mail report to NRR Event Tracking System (IPAS)
bcc to DMB (IEOl)
bcc distrib.
by RIV:
L. J. Callan DRSS-F IPB Branch Chief'DRP/E.
WCFO)
Senior Project Inspector (DRP/E, WCFO)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
DRS AI File (95-069)
Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)
M.
Hammond (PAO, WCFO)
DOCUMENT NAME:
R:% WN2NWN503AK.CJP To receive copy of document, indicate ln box: "C" ~ Copy without enclosures
"E" Copy with enclosures"
"
o copy RIV:ATL AC:EB D:DRS D:DRP D:DRS CJPaulk/lb 08/pl/95 oe/r /95
/
/95
/
/95 EECollin TPGwynn'
Dyer &
TPGwynn JC lins 0 /
/9
/5/
Washington Public Power Supply System E-Mail report to D. Sullivan (DJS)
E-Mail report to NRR Event Tracking System (IPAS)
bcc to DMB (IE01)
bcc distrib.
by RIV:
L. J.
Ca 1 1 an DRSS-F IPB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
'DRS AI file (95-069)
Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)
,
M.
Hammond (PAO, WCFO)
DOCUMENT NAME:
R:K WN2KWN503AI'.CJP To receNe copy of document, Indicate tn box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures"
"
o copy RIV:ATL AC:EB D:DRS D:DRP D:DRS CJPaulk/lb 08/pL/95 EECollin 08/l l95
/
/95 0 /
/9
/5/
/
/95 TPGwynn J Dyer 0 TPGwynn JC 1 ins