IR 05000382/2025010

From kanterella
Jump to navigation Jump to search
Commercial Grade Dedication Inspection Report 05000382/2025010
ML25336A268
Person / Time
Site: Waterford 
Issue date: 12/03/2025
From: Wes Cullum
NRC/RGN-IV/DORS/EB1
To: Sullivan J
Entergy Operations
References
IR 2025010
Preceding documents:
Download: ML25336A268 (0)


Text

December 03, 2025

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - COMMERCIAL GRADE DEDICATION INSPECTION REPORT 05000382/2025010

Dear Joseph Sullivan:

On September 24, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station, Unit 3 and discussed the results of this inspection with David Oertling and other members of your staff. The results of this inspection are documented in the enclosed report.

Due to the temporary cessation of government operations, which commenced on October 1, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at reduced staffing levels throughout the duration of the shutdown. However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300. On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations.

However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of inspection reports that could not be issued within 45 days after the end of the inspection because of the shutdown.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Wes L. Cullum, Chief Engineering Branch 1 Division of Operating Reactor Safety Signed by Cullum, Wes on 12/03/25 Docket No. 05000382 License No. NPF-38

Enclosure:

As stated

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2025010

Enterprise Identifier:

I-2025-010-0041

Licensee:

Entergy Operations, Inc.

Facility:

Waterford Steam Electric Station, Unit 3

Location:

Killona, LA

Inspection Dates:

September 08, 2025, to September 24, 2025

Inspectors:

D. Bryen, Reactor Inspector

R. Kumana, Senior Project Engineer

B. Nwafor, Reactor Inspector

Approved By:

Wes L. Cullum, Chief

Engineering Branch 1

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a commercial grade dedication inspection at Waterford Steam Electric Station, Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status CAPR 05000382/2024040-07 Waterford 95001 CAPR CR-WF3-2024-03099-00084 Develop and Incorporate Quality Requirements for Replacement Relays 71111.21N.03 Closed

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication

(1) Item Number 00022950222, Bulk Diesel Fuel, Commercial Grade Dedication
(2) Item Number 00011420222, VAR Meter, Commercial Grade Dedication
(3) Item Number 0005804562, Nuclear Instrument Module (NIM) Bin Assembly, Safety Related Procurement
(4) Item Number 00321979822, Flexible Hose, Commercial Grade Dedication
(5) Item Number 14110020832, Counter Thrust Bearing, Safety Related Procurement
(6) Item Number 139-A654012, Control Relay, Commercial Grade Dedication
(7) Item Number 00321039641, Ball Valve, Safety Related Procurement
(8) Item Number 932040051, Rotary Relay, Safety Related Procurement
(9) Item Number 111-C03964, Molded Case Circuit Breaker, Commercial Grade Dedication

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 24, 2025, the inspectors presented the design basis assurance inspection (programs) inspection results to David Oertling and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ECC 92-025

Calculation Change Sheet

ECE 90-006

Emergency Diesel Generator Loading and Fuel Oil

Consumption

SA1047

Stress Analysis of Reactor Building Feedwater Piping -

Outside Containment

Calculations

SQ-MN-25

Valve Anchor Darling 20"

Corrective Action

Documents

Condition Report

(CR-WF3-)

2019-08482, 2019-08482, 2019-08903, 2021-02100,

22-07017, 2023-13571, 2024-01460, 2024-02362,

24-02363, 2024-02785, 2024-03099, 2025-00174,

25-01000, 2025-01977, 2025-02145, 2025-02448

Corrective Action

Documents

Resulting from

Inspection

Condition Report

(CR-WF3-)

25-04407, 2025-04261, 2025-04279, 2025-04252,

25-04261, 2025-04328, 2025-04323, 2025-04407,

25-04213, 2025-04279, 2025-04426, 2025-04455,

25-04553, 2025-04555

5817-10206

2FW-V823A & 2FW-V824B Actuator Maintenance

Enhancement

5817-523 SH.2

Inch Feedwater Isolation Valve with 2FW-V823A &

2FW-V824B with A/DV Hydraulic Actuator

B430-23B.3R0,

B430-23B.2R1

Instrument Plate for Main Feedwater Isolation Valves

ESSE-FW602

Feedwater Isolation (FW184A) Accumulator Pressure

Switch Tubing

Drawings

SS-400-1-6STH

Male Connector Heavy Duty SAE

03/14/2008

EC-0000011723

Emergency Diesel Generator Limited Operating

Frequency

EC-0000094637

Storage and Use of Low Concentration Biodiesel Blends

in EDGs

WF3-EC-

0000083491

MFIV (FW-184A) Nitrogen Accumulator Leak - Change to

Flex Tubing to Reduce Vibration at the Nitrogen Pre-

Charge Fitting

09/22/2020

71111.21N.03

Engineering

Changes

WF3-EC-

0000084913

FW-184A Flex Tube - Planned FCR

05/24/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Procurement

Engineering

Evaluations (PE-

WF3-)

00108054, 00205295, 00205449, 00205578, 00206120,

216385, 00217241, 00536211, 00549153, 00566283,

00566287

Quality Control

Inspection (QC-

WF3-)

00127596, 00151847, 00156703

Engineering

Evaluations

WF3-490224-001

ESFAS MDR Relay Evaluation

QUAL-E-017

Qualification of Potter Brumfield MDR Series Relays

Specifications

MS-01-107, MS-01-140, MS-01-180

Miscellaneous

WT-HQN-2024-

258

Entergy Commercial Grade Item Survey Report of Saybolt

5/23/2025

CE-002-030

Maintaining Diesel Fuel Oil

EM-MP-101

Supply Chain Process

EM-MP-111

Inventory Control

EN-CY-122

Diesel Fuel Oil Program

EN-DC-306

Acceptance of Commercial-Grade Items/Services in

Safety-Related Applications

010

EN-DC-308

Safety and Quality Classification of Replacement Parts

EN-DC-313

Procurement Engineering Process

23

EN-DC-313-02

Procurement Engineering - Technical Evaluation of

Replacement Parts

008

EN-LI-108-01

CFR 21 Evaluations and Reporting

EN-MP-112

Shelf Life Program

011

EN-MP-117

Standardized Materials and Item Purchasing Process

EN-MP-120

Material Receipt

EN-MP-125

Control of Material

Procedures

EN-OE-100

Operating Experience Program

Purchase Orders

(PO-WF3-)

10356552, 10620937, 10664937

Shipping Records

Receipts

5818653, 6622543, 6732836, 6837967, 6939438,

10557929

Work Orders

WO- 00547982, 00575629, 00584408, 52901470, 52965525,

54125083, 54158891, 54163201, 54163202

6