Notification of Age-Related Degradation Inspection 05000382/2025010 and Request for Information
ML26034C180
Person / Time
Site: Waterford 
Issue date: 02/04/2026
From: Wes Cullum
NRC/RGN-IV/DORS/EB1
To: Sullivan J
Entergy Operations
References
IR 2025010
Download: ML26034C180 (0)


See also: IR 05000382/2025010

Text

February 04, 2026

Joseph Sullivan, Site Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF

AGE-RELATED DEGRADATION INSPECTION (05000382/2025010) AND

REQUEST FOR INFORMATION

Dear Joseph Sullivan:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct the IP 71111.21N.04, Age-Related Degradation baseline inspection at

Waterford Steam Electric Station, Unit 3, beginning on May 4, 2026. The inspection team will be

led by Dustin Bryen from the NRC Region IV Office. The team will be composed of three

personnel from the NRC Region IV Office. The inspection will be conducted in accordance with

IP 71111.21N.04.

The inspection will include an onsite information gathering visit by the team lead and two weeks

of onsite inspection by the team. The schedule for the inspection is as follows:

Onsite Information Gathering Visit: March 23 - 26, 2026

Offsite Preparation Week: April 27 - May 1, 2026

Onsite Inspection Weeks: May 4 - 7, 2026, and May 18 - 21, 2026

The purpose of the information gathering visit is to become familiar with the station

maintenance, surveillance, testing, inspection, and condition monitoring programs, become

familiar with plant layout, support identification of structures, systems, and components (SSCs)

that will be reviewed during the inspection, and, as necessary, obtain plant specific site access

training and badging for unescorted site access. An initial list of documents that the team will

review during the information gathering visit are listed in enclosure 1.

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space size and location; specific documents requested to be made

available to the team in their office spaces; arrangements for reactor site access (including

radiation protection training, security, safety, and fitness for duty requirements); and the

availability of knowledgeable plant staff and licensing organization personnel to serve as points

of contact during the inspection.

J. Sullivan

2

For SSCs that the inspection will review, an initial list of the documents the team will review

during the conduct of the inspection are listed in enclosure 2. (Enclosure 3 lists the team

members and their contact information.) The team leader will contact you with identified SSCs.

Also, personnel should be available at the site during the inspection who are knowledgeable

regarding maintenance, surveillance, testing, inspection, and condition monitoring programs.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC rules and practices, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC public document

room or from the publicly available records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Dustin Bryen, the team leader, in the Region IV Office at 817-200-1078.

Sincerely,

Wes L. Cullum, Acting Chief

Engineering Branch 1

Division of Operating Reactor Safety

Docket No. 05000382

License No. NPF-38

Enclosures:

1.

Documents Requested Prior to

Information Gathering Visit

2.

Documents Requested Prior to

Inspection Preparation Week

3.

Inspection Team Contact Information

cc w/ encl: GovDelivery Subscriber

Signed by Cullum, Wes

on 02/04/26

ML26034C180

SUNSI Review

By: DKB

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RI:DORS/EB1

BC:DORS/EB1

NAME

DBryen

WCullum

SIGNATURE

/RA/

/RA/

DATE

02/04/26

02/04/26

Enclosure 1

Enclosure 1

Documents Requested Prior to Information Gathering Visit

The documents and information requested below should generally be made available to the

inspection team for the team's use both onsite and offsite during the information gathering visit.

Electronic format is the preferred media. If electronic media is made available via an internet

based remote document management system, then the remote document access must allow

inspectors to download, save, and print the documents in the NRC's regional office. Electronic

media on compact disc or paper records (hardcopy) are acceptable. At the end of the

inspection, the documents in the team's possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all the

listed documents. In addition, your plant-specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below.

Documents requested by March 16, 2026:

1) A list of 50.65 (a)(1) SSCs from the past 5 years

2) A list of maintenance rule functional failures from the past 5 years

3) The two most recent evaluations of maintenance effectiveness required per Title 10 CFR

50.65(a)(3)

4) Maintenance rule scoping and performance criteria document

5) List of preventative maintenance deferrals and preventative maintenance change requests in

the last 5 years

6) Equipment reliability characterization and preventative maintenance program procedures

7) A list of Title 10 CFR Part 21 Reports that were determined to be applicable to the site from

the past 5 years

8) List of corrective action documents associated with component failures, applicable corrective

action program trend codes, or keyword search of aging, age-related, wear, accelerated

wear, corrosion, abnormal wear, accelerated degradation, and abnormal degradation

from the past 5 years. Please include a short description of the issue in the system generated

listing.

9) A list of top 100 most risk-significant structures and components according to the site-specific

probabilistic risk assessment (PRA). If possible, designate the component as active or passive

in the risk ranking.

10) The most recent system health status for each plant system and the associated Plant Health

Committee (PHC) package if presented to the PHC and any applicable PHC procedure

documents.

E1-2

11) Aging management programs and basis documents. Please also include any plant-specific

or industry operating experience reviews that have been used to update aging management

activities.

12) Any self-assessments or quality assurance assessments of the aging management

programs performed since January 1, 2021

13) Copy of the updated final safety analysis report, technical specifications, and technical

requirements manual, including applicable bases documents

14) List of systems (system numbers/designators and corresponding names)

Enclosure 2

Enclosure 2

Documents Requested Prior to Inspection Preparation Week

For the samples identified by the team lead, the documents and information requested below

should generally be made available to the inspection team for the team's use both onsite and

offsite during the inspection. Electronic format is the preferred media. If electronic media is

made available via an internet based remote document management system, then the remote

document access must allow inspectors to download, save, and print the documents in the

NRC's regional office. Electronic media on compact disc or paper records (hardcopy) are

acceptable. At the end of the inspection, the documents in the team's possession will not be

retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all the

listed documents. In addition, your plant-specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below for

each sample.

Documents requested by April 27, 2026:

1) List of corrective action documents associated with each selected SSC for the last 5 years

2) Maintenance, surveillance, testing, inspection, and condition monitoring testing requirements,

acceptance criteria, and periodicities for the selected SSC samples

3) The bases documents associated with maintenance, surveillance, testing, inspection, and

condition monitoring testing requirements, acceptance criteria, and periodicities

4) The last two years of maintenance, surveillance, testing, inspection, and condition monitoring

testing results for the selected SSC samples. For periodicities greater than two years, provide

the last two test results.

5) Vendor manuals and self-imposed vendor recommendations

6) If available,

(a) Equipment reliability category/characterization (e.g., non-critical, run-to-maintenance,

etc.)

(b) Preventative maintenance templates for the maintenance strategy

(c) System design basis documents and the specific Updated Final Safety Analysis

Report section that describes the function

(d) PI&Ds and electrical one-line drawings

(e) Control circuit drawings

(f) Design/procurement specifications

(g) List of applicable modifications for the component

Enclosure 3

Enclosure 3

Inspection Team Contact Information

Fabian Thomas

Reactor Inspector

817-200-1126

Fabian.Thomas@nrc.gov

Dustin Bryen

Reactor Inspector

817-200-1078

Dustin.Bryen@nrc.gov

Josh Talavera

Reactor Inspector

817-200-1435

Joshua.Talavera@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Wes Cullum

1600 East Lamar Blvd.

Arlington, TX 76011-4511