IR 05000382/2025403

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000382/2025403
ML25050A106
Person / Time
Site: Waterford 
Issue date: 02/19/2025
From: Jesse Rollins
NRC/RGN-IV/DRSS/PSB
To: Sullivan J
Entergy Operations
References
IR 2025403
Download: ML25050A106 (1)


Text

February 19, 2025

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - SECURITY BASELINE INSPECTION REPORT 05000382/2025403

Dear Joseph Sullivan:

On February 06, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station, Unit 3 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jesse M. Rollins, Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000382 License No. NPF-38

Enclosure:

As stated

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2025403

Enterprise Identifier:

I-2025-403-0000

Licensee:

Entergy Operations, Inc.

Facility:

Waterford Steam Electric Station, Unit 3

Location:

Killona, LA

Inspection Dates:

February 03, 2025 to February 06, 2025

Inspectors:

R. Lanfear, Physical Security Specialist

Approved By:

Jesse M. Rollins, Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Waterford Steam Electric Station,

Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000382/382/2024-S001-00 LER 2024-S01-00 for Waterford, Unit 3, Follow-Up Report for a Security One-Hour Report on July 25, 2024; and LER 2024-S02-00, Follow-up Report for a Security One-Hour Report on July 31, 2024 71153 Closed LER 05000382/2024-S003-

LER 2024-S03-00 for Waterford, Unit 3, Follow-Up Report for a Security On-hour Report on September 26, 2024 71153 Closed

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements Tier II: All Requirements Tier III: All Requirements

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) January 01, 2023 through December 31, 2024 71153 - Follow Up of Events and Notices of Enforcement Discretion Follow Up of Events and Notices of Enforcement Discretion===
(1) The inspectors evaluated the following licensee event reports which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:

Licensee Event Report 50-382/2024-S01-00, Undisclosed PDI on July 25, 2024 The inspectors determined that the cause of the condition described in the LER was not reasonably within the licensees ability to foresee and correct and therefore was not reasonably preventable. No performance deficiency nor violation of NRC requirements was identified.

(2) Licensee Event Report 50-382/2024-S02-00, Undisclosed PDI on July 31, 2024.

The inspectors determined that the cause of the condition described in the LER was not reasonably within the licensees ability to foresee and correct and therefore was not reasonably preventable. No performance deficiency nor violation of NRC requirements was identified.

(3) Licensee Event Report 50-382/2024-S03-00, Undisclosed PDI on November 11, 2024.

The inspectors determined that the cause of the condition described in the LER was not reasonably within the licensees ability to foresee and correct and therefore was not reasonably preventable. No performance deficiency nor violation of NRC requirements was identified.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 6, 2025, the inspectors presented the security baseline inspection results to Joseph Sullivan and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR-WF3-2024-

294, CR-WF3-

24-04279, CR-

WF3-2024-

278, CR-WF3-

24-04277, CR-

WF3-2024-

04302, CR-WF3-

24-04321, CR-

WF3-2024-

04303, CR-WF3-

24-04526, CR-

WF3-2024-

04535, CR-WF3-

24-04624, CR-

WF3-2024-

283, CR-WF3-

24-05952, CR-

WF3-2024-06012

Corrective Action

Documents

Resulting from

Inspection

CR-WF3-2025-

00388, CR-WF3-

25-00401, CR-

WF3-2025-

00425, CR-WF3-

25-00445

EN-NS-101-06

Terminating, Denial and Appeal of Unescorted Access

Authorization/Unescorted Access

EN-NS-224

SOCA Access Controls

EN-NS-231

Protected Area Search

EN-NS-236

Warehouse Material Search

EN-NS-237

Lock and Key

71130.02

Procedures

PS-016-103

Vital Area Access During Periods of a Credible Threat (Two-

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Person Rule)

71151

Miscellaneous

Performance

Indicator Data

January 1, 2023 thru December 31, 2024

Employee

personnel

Records

Personal History Questionnaires, PADS Synopsis Reports,

Clinical Interview Letter of Explanation

W3F1-2024-0043

Security Follow up Reports 50-382/2024-S01-00 and 50-

2/2024-S02-00

09/23/2024

71153

Miscellaneous

W3F1-2024-0051

Security Follow up Reports 50-382/2024-S01-00 and 50-

2/2024-S02-00

11/21/2024