IR 05000348/1982011
| ML20053B182 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/05/1982 |
| From: | Crowley B, Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20053B175 | List: |
| References | |
| 50-348-82-11, 50-364-82-10, NUDOCS 8205280149 | |
| Download: ML20053B182 (8) | |
Text
/
%,
UNITED STATES
NUCLEAR REGULATORY COMMISSION o
$
E REGION 11
e 101 MARIETTA ST., N.W., SUITE 3100 g
ATLANTA, GEORGIA 30303
.....
Report Nos. 50-348/82-11, 50-364/82-10 Licensee: Alabama Power Company P. O. Box 2641 Birmingham, AL 35291 Facility Name:
Fa rley Docket Nos. 50-348, 50-364 License Nos. NPF-2, NPF-8 Inspection at Farley site near Dothan, Alabama
.
Inspector:
.
[I b
,
B. R.
pwle -
__
Date Si ned h
$
hol Approved by:
A. R. Herdt, Section Chief D te igned Engineering Inspection Branch Division of Engineering and Technical Programs SUMMARY Inspection on April 13-16, 1982 Areas Inspected This routine, unannounced inspection involved 27 inspector-hours on sita in the areas of inservice testing program for pumps and valves (Units I and 2), inser-vice inspection (Unit 1), welding and NDE (Units 1 and 2) and previous inspection findings (Units 1 and 2).
Results No violations or deviations were identified.
8205280N9
,
-
.
REPORT DETAILS
-
1.
Persons Contacted Licensee Employees W. G. Hairston, III, Plant Manager
- J. D. Woodard, Assistant Plant Manager
- R. G. Berryhill, Performance and Planning Superintendent
- W. B. Shipman, Maintenance Superintendent
- R. M. Coleman, QC Supervisor K. Burr, Systems Performance Supervisor H. D. Erbskorn, Section Supervisor, Mechanical Maintenance
- G. S. Waymire, Generation Plant Engineer
- C, G. Walenga, Safety Audit and Engineer Review Engineer P. T. Webb, Generating Plant Engineer G. G. Dykes, Generating Plant Engineer J. E. Hagie, Maintenance Foreman
,
Other licensee employees contacted included security force members and office personnel.
Other Organizations R. D. Justice, Nuclear Services Manager, DAVCON Corporation
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on April 16, 1982, with those persons indicated in paragraph 1 above. The inspector described the areas inspected and discussed in detail the inspection findings listed below.
(0 pen) Inspector Followup Item 34C/82-11-01 and 364/82-10-01: " Revision to Welding Maintenance Program," paragraph 10.c.
(Open) Inspector Followup Item 348/82-11-02 and 364/82-10-02: " Revision to DAVCON PT Procedure," paragraph 11.b.
3.
Licensee Action on Previous Inspection Findings
i (Closed) Violation 348/81-25-01: " Failure to Follow ASME Section XI NDE l
Requirements." Corrective action for this item was reviewed during the inspection documented by report number 50-348/82-03.
At that time,
,
!
procedure FNP-0-AP-57 still needed revision to include spot checks of inspector technique.
This change has been made in revision three to tha procedure.
,
l
[
>
-
,
p_ w
'
.
..
,
'
-
.
/,..
.
s
'
L%
~
.
y
_
.-
(Open) Unresolved Item 364/80-20-01: " Reflect or Designs in UT Calibration Blocks." This' item pertains to the use of calibration Alocks with side drilled hdies for UT of pipe welds as requirFd by the'1974 editioni S75 addenda of_ASME Sec-tion XI versus use pf blotks with notches as required by the 1977 edition, Sf8 addenda of Sectioif XI.
The ' PSI was performcd using notches.
The inspector reviewed a' draft of an FSAR revision which details
'
the use of notches for calibratien. 'T1e licensee also ag'eed to include the r
use of calibration notches for pipe ' welds in the' PSI report, which is currently undergoing revismion of the finsl report to resolve minor errors, typos and omissions.
The use of notches will be identified in the Unit 1 and Unit 2 ISI' programs at the next revis?on to the programs.
This item
-
remains open.'-
s
-
4.
Unresolved Items
'
'
Unresolved items were not identif red during this inspect. ion.
5.
Inspector Fo.llowup Items
-
(Closed) Item 364/80-43-01:
" Documentation-of Resolu' tion of RV PSI.UT Indications." Westinghouse has issued'tne final report. Errors, typos and omissicos identified by APC0 are currently being resolved. The inspector reviewed documentation of discosition of RV indications located _in Tabs I
'
and F of the report and has no further questions on this item.
_
_
_
6.
Inservice Testing Program (IST)(Units 1 and 2)
,
The inspector reviewed the inservice testing program for pumps and valves as
'
described below. The applicable code is the ASME Boiler and Pressure Vessel Code,Section XI, 1974 Edition with Addenda through the Summer of 1975 as required by 10 CFR 50.55a(g) and Units 1 and?2 Technical Specifications
" Surveillance Requirements," 4.0.5.
The following documents detail the ce,quirements of tha IST program:
a.
(1) Programs
FNP-2-M-019, revision 1, "Ft!P Unit 2_ Inservice Testing Program for ASME Class 1, 2 and 3 Pumps and Valves"
'
'
l FNP-1-M-013, revision 3, " Inservice Testing Program For Class 1,
_
2, and 3 Pump and Valves" - Unit 1
_
These documents define the programs submitted to the NRC.
(2) Plans FNP-2-M-008, revision 0, TCN OA, " Inservice Plan for Class 1, 2, i.
and 3 Pump and Valve Testing for Farley Nuclear Plant Unit No. 2"
_ _
._
-
- - - -.
_
.- _. _.
r~.
,
.
'
-
,
..
.
/,
- -
,
.
,
'3
.
.
,;l
-
FNP-1-M-002, revision 2, TCN 2A, " Inservice Plan for Class 1, 2, and; 3 Pump and Valve Testing for Farley Nuclear Plant -
Unit No. 1" These are site documents used to implement the programs.
//
'
'
(3) f(aster List i
" Master List of Surveillance Requirements Inservice Inspection Plan Requirements Per SPEC 4.0.5 Class I, II and III" Revision 2
.o-
'I
" Master List of Survelliance Requiraments - Unit 1",
Revision 1, TCN 4A
'
s These documents schedule a surveillances and list the required t
procedure for the surveillance,
~'
f'
(4), Survei11a';ce_ Schedules
,;
-
, / " Unit 2 Surveillar.he Schedules A and B"
,,
j'
" Unit 1. Surveillance Schedules A and B" f'
_Thes'_ dScuments 3chedule surveillances, specify the procedure to be used and are used, to verify the completion of the surveillance
.
and rescheodle the otxt surveillance.
(5) Administra(i;g
.
FNP-0-AP-5, revision 5,
" Surveillance Program Administrative
>
Control" This procedure controls implementation of the IST program.
.
'
b.
The inspector rev(ewed the " March 82 - Original Surveillance Schadule B" and :ne " Current Surveillance Schedule A" for the following pumps and valvgs and compared the schedules with documents of oaragraphs (1), (2) and (3) above:
Unit 1
,
Service Water Pump Q1P16P00A-A Containment Spray Pump Q1E13P001A-A RHR LHSI Valve 01E11 - V001A Containment Cooling Valve Q1E12-V001A Unit 2 Charging Pump Q2E21P002A-A Component Cooling Water Pump Q2P17001A-B Pressurizer Safety Valve Q2B13-V031A Boron Injection Tank. Discharge Valve.Q2E21-V004A
<
,,
, - -
p
,-
,..,,.:
,--.
,
-..
-
__
.
.
Within the areas inspected, no violations or deviations were identified.
7.
Inservice Inspection - Review of Procedures (Unit 1)
The inspector reviewed the ISI procedures indicate below to determine whether the procedures were consistent with regulatory requirements and licensee commitments.
The applicable code for the ISI is the ASME Boiler and Pressure Vessel Code,Section XI, 1974 edition with addenda through the summer of 1975.
NDE procedures for the areas of examination listed below were examined to determine whether the procedures were consistent with licensee Technical Specification commitments and specified the examination category, method of examination, and the extent of examination:
(1) Category B-J: Pressure Retaining Welds in Piping (2) Cagegory B-G-2: Pressure Retaining Bolting Smaller Than 2" (3) Category C-A: Pressure Retaining Welds in Pressure Vessels (4) Category C-C:
Integrally Welded Support Attachments to Vessels This review was relative to Period 2, Outage 1,1981 inspections.
Within the areas inspected, no violations or deviations were identified.
8.
Inservice Inspection - Data Review and Evaluation (Unit 1)
The inspector reviewed the ISI NDE records described below for the current (Period 2, Outage 1, 1981) outage. See paragraph 7 above fr r the applicable code.
Records for the reactor vessel closure head welds, pressurizer welds, main steam pipe welds, and valve bolting were reviewed to ascertain whether the records contain or provide reference to:
a.
Examination results and data sheets b.
Examination equipment data c.
Calibration data sheets d.
Examination evaluation data e.
Records of extent of examination f.
Records on deviation from program and procedures g.
Records on disposition of findings h.
Identification of NDE materials Within the areas inspected, no violations or deviations were identified.
9.
Spent Fuel Storage Racks - Observation of Work and Work Activities (Units 1 and 2)
The applicable specification for high density spent fuel racks is Southern Company Services specificatio" (S-1116-23, " Spent Fuel Storage Racks."
- - - - -
-.
.-
.. - -
.-
~ _ _ _
_.-
.
e
'
.
Racks have been ordered for Units 1 and 2.
Installation of racks is scheduled to begin in June, 1982 for Unit 2.
Unit 1 racks are scheduled to be shipped beginning in November, 1982.
The inspector questioned the licensee relative to receipt inspection, storage, and installation proce-dures. These procedures are in preparation and were expected to be issued prior to their need.
No violations or deviations were identified in the areas inspected.
10. Welding - Maintenance (Units 1 & 2)
The inspector examined the licensee's welding practices as indicated below relative to maintenance.velding to determine whether these activities were in conformance with regulatory requirements and applicable industry codes.
The codes involved in this welding are various depending on the component being welded. The applicable control documents are as follows:
Specification SS-1109-2, revision 31, " Installation of Shop Fabricated Piping and Hangers and Furnishing of Field Fabricated Piping and Hangers and Installation of Field Fabricated Piping and Hangers for Nuclear Service"
" Weld Specification APC0 Nuclear," revision 0 FNP-0-AP-12, revision 2.
" Cont,.1 of Special P roc e',s e s During Operation" a.
WPS's 1.01N and 8.22N including supporting procedure qualification records were reviewed in the areas of:
(1) Welding variables as required by ASME Section IX (2) Material characteristics as required by ASME Section IX (3) Mechanical testing of qualification assemblies as required by ASME Section IX b.
Welder qualification records for two welders were reviewed to determine conformance with ASME Section IX and licensee established requirements.
c.
During the above review, the inspector identified the following problems:
(1) Neither of the WPS's clearly covered nonessential variable QW410.5, method of interpass cleaning as required by ASME Section IX.
(2) WPS 1.01N, which covers P1 rnaterials 3/16" - 41" in thickness was s
not qualified for impact tested materials. This restriction was not included in the WPS or other control document,
,
..
(3) The procedure qualification record (8024) for the thicker portion of WPS 1.01N, a SMA process procedure, was for a 2h" thick combi-nation GTA/SMA process test assemblys The record did not identify what portion of the weld was GTA and what portion was SMA. With-out this information, it is impossible to determine the thickness of SMA process qualified.
(4) Procedure FNP-0-AP-12 referenced the APC0 " Welding Manual" for welding.
A document by this title was not available.
Site personnel stated that this document was the same as the "APC0 Nuclear Welding Specification."
(5) The "APC0 Nuclear Welding Specification" referenced "APC0 Welder Qualification Specification" for weldcr qualification.
This document is actually part of the " Construction Welding Manual" and not part of Operations Welding Manual.
At the time these problems were identified, the licensee was in the process of complete revision of the sit'e welding program. Many of the problems noted above had been identified by the licensee. The purpose of the revision to the program was to update and remove errors and inconsistencies such as noted above.
In addition, the licensee stated that the small number of repair or modifications of any significance re juired for safety related equipment had been accomplished under the Construction Welding Program. Therefore, the welding progran will be reviewed again after the new revision is issued.
This item is identified as inspector followup item numbers 348/82-11-01 and 364/82-10-01: " Revision to Welding Maintenance Program."
Within the areas inspected, no violations or deviations were identified.
11.
Nondestructive Examination (Units 1 & 2)
The inspector examined the licensee's nondestructive examination (NDE)
,
practices as indicated below relative to maintenance welding to determine whether the activities were in conformance with regulatory requirements and applicable i ndustry codes.
The codes involved in this NDE are various depending on the component being welded.
NDE is performed on a contract basis by DAVCON Corporation.
a.
The inspector reviewed the personnel qualification records for two Level II examiners.
b.
The inspector reviewed DAVCON liquid penetrant (PT) procedure NDE-7.3, revision 1A, " Liquid Penetrant Visible Dye Solvent Removable" to determine whether the procedure had been reviewed and approved consistent with licensee established procedures.
In addition, the procedure was reviewed for technical adequacy in the areas of:
y m
..
(1) Method consistent with ASME code (2)
Specification of brand names of penetrant materials (3) Specification of limits for sulfur and total halogens for materials (4) Pre-examination surface preparation (5) Minimum drying time following surface cleaning (6) Penetrant application and penetration time (7) Temperature requirements (8)
Solvent removal (9) Method of surface drying (10) Type of developer and method of application (11)
Examination technique (12) Technique for evaluation (13) Acceptance standards During review of this procedure, the inspector noted that the PT procedure did not specify the brand names of materials.
However, a licensee administrative procedure does limit tne materials to a particular brand.
In addition, the procedure does not specifically state a temperature range. The ASME Code does not specifically state that the temperature range be specified in the procedure, but does specify that the procedure be requalified if used outside the range of 60 F-125 F.
The licensee and NDE contractor agreed that the brand names of penetrant materials and the temperature range should be added to the procedure for clarity.
This will be identified as inspector followup item numbers 348/82-11-02 and 364/82-10-02:
" Revision to DAVCON PT Procedure."
c.
The inspector reviewed DAVCON magnetic particle (MT) procedure NDE-7.4, revision 1, " Magnetic Particle Dry Powder Continuous" to determine whether the procedure had been reviewed and approved consistent with licensee established procedures.
In addition, the procedure was reviewed for technical adequacy in the areas of:
(1) Examination method (2) Contrast of dry powder particle color with background and surface temperature (3) Examination overlap and directions (4)
Pole or prod spacing (5) Current or lif ting power (yoke)
(6) Acceptance Criteria Within the areas inspected, no violations or deviations were identified.