Text
&hW
...
'
MAY - 61982
Alabama Power Company
ATTN:
Mr. R. P. Mcdonald
Vice President-Nuclear Generation
P. 0. Box 2641
Birmingham, AL 35291
Gentlemen:
Subject:
Report Nos. 50-348/82-11 and 50-364/82-10
This refers to the routine safety inspection conducted by Mr. B. R. Crowley
of this office on April 13-16, 1982, of activities authorized by NRC License
Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of our
findings held with Mr. J. A. Woodard, Assistant Plant Manager, at the conclu-
sion of the inspection.
Areas examined during the inspection and cur findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations cr deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be' placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements-of
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
,
H. C. Dance, Chief
Reactor Projects Branch 2
Division of Project and
1
'
Resident Programs
l
Enclosure:
See Page 2
!
s20528 # %
not,
u
,
.
.-
,
Alabama Power Company
2
MAY - 61992
Enclosure:
Inspection Report Nos. 50-348/82-11
and 50-364/82-10
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, General Manager-Nuclear Generation
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Safety Audit
and Engineering Review
W. G. Ware, Supervisor-Safety Audit
and Engineering Review
W. G. Hairston, III, Plant Manager
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of Alabama
l
l
RIl
RII
RII
RII
h
(O
f)V
BRCrowley:ht
ARH rdt
JRogge
HCDance
4/)3/82
g/ /82
)4/'p/82
4/ /82