IE Insp Repts 50-348/81-05 & 50-364/81-07 on 810304-12.No Noncompliance Noted.Major Areas Inspected:Initial Unit 2 Fuel Loading & Tour of Unit 1 Auxiliary Bldg & Control Room
ML20003H484
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/25/1981
From: Burnett P, Fielder R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20003H483 List:
References
50-348-81-05, 50-348-81-5, 50-364-81-07, 50-364-81-7, NUDOCS 8105060101
Download: ML20003H484 (5)


Text

{{#Wiki_filter:, %

!a ua UNITED STATES ~g',, NUCLEAR REGULATORY COMMISSION l'

5 $ REGION 11

101 MARIETTA ST N.W., SUITE 3100 o ATLANTA, GEORGIA 30303 ..... O Report Nos. 50-348/81-5 and 50-364/81-7 Licensee: Alabama Power Company 600 North 18th Street Birmingham, AL 35202 Facility Name: Farley Docket Nos. 50-348 and 50-364 License No. NPF-2 and NPF-8 Inspection at Farley site near Dothan, AL Inspector: [[ n J/a-J - 2. f-8 / R. L. Fiedler Date Signed Approved by: s/mM d 2 f-" #7 P. T.'Burnett,7cting Section Chief Date Signed Engineering Inspection Branch Engineering and Technical Inspection Division SUMMARY Inspected on March 4 through March 12, 1981-Areas Inspected This routine, announced inspection involved 61 inspector-hours onsite in the areas of initial fuel loading of Unit 2 and a tour of the Unit 1 auxiliary building and control room.

Results Of the 2 areas inspected, no violations or deviations were identified.

. 8105060101

_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ .

W . REPORT DETAILS 1.

Persons Contacted Licensee Employees W. G. Hairston, III, Plant Manager

  • J. D. Woodard, Assistant Plant Manager
  • D. N. Morey, Operations Superintendent
  • K. W. McCracken, Technical Superintendent
  • J. W. Xahle, SAER Engineer
  • H. M. McClellan, Technical Supervisor
  • R. D. Rogers, Technical Supervisor R. H. Marlow, Reactor Engineer Other licensee employeas contacted included numerous technicians, operators, and office personnel.

Other Organizations

  • A. Van Baeleix, Westinghouse EBES NRC Resident Inspector W. H. Bradford, Senior Resident Inspector

" Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on March 12, 1981 with those persons indicated in paragraph I above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Unit 2 Initial Fuel Loading The licensee commenced Unit 2 initial fuel loading on March 8,1981 and completed the initial fuel loading on March 11, 1981.

The inspector observed portions of the preparations for, and actual fuel loading during different shifts to verify the following: , a.

That technical specifications requirements and license conditions were me. k .

b.

That nuclear instrumentation was properly calibrated and operating with measurable count rate.

c.

That fuel loading activities were conducted in accordance with an approved procedure.

d.

That direct communications were established between the control room and fuel handling locations during fuel movement.

e.

That fuel handling activities were under the direct supervision of a licensed senior reactor operator.

f.

That inverse multiplication plots were being maintained in accordance with procedural requirements.

g.

That the boron concentration was being verified by proper sampling and analysis at the required frequency.

h.

That refueling status boards were being maintained.

1.

That personnel access to the fuel handling areas was being controlled.

The fuel loading procedure was reviewed to verify the following: a.

That a " master" copy for the procedure was assembled.

b.

That changes to the procedure were made in conformance with admin-istrative procedures and had the proper approval.

c.

That difficulties encountered were recorded and that adequate correc-tive action was taken.

d.

That entries were permanent and legible and that intialed entries were taceable.

The control room log was reviewed for indications of problems or deviations from the fuel loading procedure.

. Within the areas inspected there were no violations or deviations identi-fied.

6.

Tour of Unit 1 Auxiliary Building and Control Room Conducted a tour of accessible areas to determine by observation that plant conditions and activities were in accordance with applicable requirements.

Within the areas inspected there were no violations or deviations identi-fied.

. }}