IR 05000348/1981023
| ML20032C931 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/03/1981 |
| From: | Hall B, Mcguire D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20032C930 | List: |
| References | |
| 50-348-81-23, 50-364-81-26, EPA-520-1-75-001, EPA-520-1-75-1, NUDOCS 8111130206 | |
| Download: ML20032C931 (1) | |
Text
-
"'TTL TRANSMITTED liEREVIITH
.
, jf**%
CL....S 2.7Cgggyy INFORf/ATION
NUCLEAR REGULATORY COMMISSION
~
o
$
E REGION 11
o, 101 MARlETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303
.....
Report Nos. 50-348/81-23 and 50-364/81-26 Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 Licensee: Alabama Power Company 600 North 18th Street Birmingham, AL 35202 Facility Name:
Farley Nuclear Plant Inspection at: Alabama Power Company Corporate office and Flintridge Building Inspection Conducted: October 21-23, 1981 Type of Inspection: Announced Physical Security - Farley Nuclear Plant Screening Program Y
J4$2 )
h/
]6 Signed Inspecto j
/
B. L. Hall, gfca~l Security Inspector at Approved by:
_)S
'
/
D. R. McGuire, Chief, Physical Security Section
_j ' Date Signed Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:
Included review of the general requirements for personnel (screening program).
The inspection involved 16 inspector hours on site by one NRC inspector.
Results: The licensee was found to be in compliance with NRC requirements within the one area examined during the inspection.
s-12 8l I<I9
-
Copy /d of //
Cepics
Pages This Decument is not to be reproduced without specific
,
approval of IE:II
,
8111130206 011104
-
hDRADOCK 0500034s RDL TRANSMITTED HEREVIITH PDR 2.750f) SAFEGUARDS INFORi/ATION