Forwards IE Insp Repts 50-348/81-05 & 50-364/81-07 on 810304-12.No Noncompliance Noted
ML20003H482
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/30/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20003H483 List:
References
NUDOCS 8105060098
Download: ML20003H482 (2)


See also: IR 05000348/1981005

Text

1

Id '8 4

L

t

/

%

UNITED STATES

y"

NUCLEAR REGULATORY COMMISSION

,,,

g

REGION 11

$~

.. cf

101 MARIETTA ST., N.W., SUITE 3100

o

ATLANTA, GEORGIA 3o3o3

Q

v

7

ff '( ly-i

MAR 3 0151

7

'G '

s

5 M-

,,

Alabama Power Company

gjy

LJ $

ATTN:

R. P. Mcdonald

'

Vice President-Nuclear Generation

-

'l.id 0 4 '

- [ w#o sce*

"

P. O. Box 2641

c

Birmingham, AL 35291

c

Gentlemen:

D

Subject: Report Nos.h8/81-5r an M 64/8 h

This refers to the routine safety inspection conducted by R. L. Fiedler of this

office on March 4-12, 1981, of activities authorized by NRC License Nos. NPF-2

and NPF-8 for the Farley facility and to the discussion of our findings held with

J. D. Woodard at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observatio.as by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

E.c.

R. C. ' ewis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosure: (See Page 2)

8105060098

~

-

1

r-

3

.

30m

Alabama Power Company

2

Enclosure:

Inspection Report Nos. 50-348/81-5

.

and 50-364/81-7

' ,,

cc w/ encl:

'). O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

0. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

R. E. Hollands, Jr. , QA Supervisor