UNITED STATES
y"
NUCLEAR REGULATORY COMMISSION
,,,
g
REGION 11
$~
.. cf
101 MARIETTA ST., N.W., SUITE 3100
o
ATLANTA, GEORGIA 3o3o3
Q
v
7
ff '( ly-i
MAR 3 0151
7
'G '
s
5 M-
,,
Alabama Power Company
gjy
LJ $
ATTN:
R. P. Mcdonald
'
Vice President-Nuclear Generation
-
'l.id 0 4 '
- [ w#o sce*
"
P. O. Box 2641
c
Birmingham, AL 35291
c
Gentlemen:
D
Subject: Report Nos.h8/81-5r an M 64/8 h
This refers to the routine safety inspection conducted by R. L. Fiedler of this
office on March 4-12, 1981, of activities authorized by NRC License Nos. NPF-2
and NPF-8 for the Farley facility and to the discussion of our findings held with
J. D. Woodard at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observatio.as by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC's Public Document Room.
If this report
contains any information that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20 days to this office
to withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document.
If we do not hear from you within the specified period, the report
will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
E.c.
R. C. ' ewis, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosure: (See Page 2)
8105060098
~
-
1
r-
3
.
30m
Alabama Power Company
2
Enclosure:
Inspection Report Nos. 50-348/81-5
.
and 50-364/81-7
' ,,
cc w/ encl:
'). O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, Manager-Nuclear Generation
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Operations
Quality Assurance
W. G. Hairston, III, Plant Manager
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
R. E. Hollands, Jr. , QA Supervisor