IR 05000348/1981008
| ML20004E876 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/05/1981 |
| From: | Bryant J, Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20004E874 | List: |
| References | |
| 50-348-81-08, 50-348-81-8, 50-364-81-11, NUDOCS 8106150606 | |
| Download: ML20004E876 (3) | |
Text
r
~>
1 <
.
%
UNITED STATES
~t,
-
NUCLEAR REGULATORY COMMISSION
$j E
REdlON ll
e.
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 g
.....
O Report Nos. 50-348/81-08 and 50-364/81-11 Licensee: Alabama Power Company 600 North 18th Street
.
Birmingham, AL 35202 Facility Name: Farley
-
Docket Nos. 50-348 and 50-364
-
'
License Nos. NPF-2 and NPF-8 Inspection at F riey Nuclear Plant near Ashford, Alabama Inspector.
A, f/r/.ff Approv
C. Bryag " ' ~'
Date Signed SUMMARY
.
Inspection on April 14 - 17, 1981 Areas Inspected
_
_
This routine, announced inspection involved 24 inspector-hours on site in the areas of operator requalification training and training t' 'the TMI Task Action o
l Plan commitments.
Results
_
_
Of the two areas inspected, no violations or deviations were identified in either area.
..
.
.
8106350/o0@
.
.
DETAILS 1.
Persons Contacted Licensee Employees
- W. G. Hairston, Plant Manager
- W. C. Carr, Supervisor of SAER
- Lee S. Williams,' Training Superintendent
- L. L. Bailey, QA Engineer
-
- J. W. Kale, SAER Engineer
Other licensee employees contacted included 6 operators and 5 office personnel.
NRC Resident Inspector
-
- W. H. Bradford
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on April 17, with those persons indicated in paragraph 1 above.
3.
Licensee Action on Previous Inspection Findings Not inspected.
_
_
4.
Unresolved Items
,
'
'
Unresolved items were not identified during this inspection.
5.
Requalification Training The inspector attended two of the licensee's operator requalification lecture series and verified that lesson plan objectives were met and that training was in accordance with the approved operator requalification program schedule and objectives. The inspector reviewed training records to verify that all of the on site licensed personnel were current with the requalification requirements and that the course tests had been satisfactorily completed.
The inspector verified by direct questioning of six licensed personnel that training had been conducted and that course objectives had been met.
The inspector found the licensee's training program to be beneficial for the
_.
personnel and.the. regulatory. requirements.
.
-
....
,
.
6.
TMI Action Items The inspector verified that licensee commitments were being met in having a functioning program for feedback of operating experience to the plant staff, that training had been conducted for all operations personnel in all
~
start-up tests to be conducted, and that the operator training program included the principles of heat transfer and fluid mechanics. The inspector found these items to be complete.
.
.
.