IR 05000346/1980030
| ML19341B260 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/21/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML19341B261 | List: |
| References | |
| NUDOCS 8101300551 | |
| Download: ML19341B260 (1) | |
Text
8 o
UNITED STATES g v.7, c
/x ' #y)-
s
,f 8
'g NUCLEAR REGULATORY COMMISSION
"*
,
,4 ji t p g y\\y REGION 111 g
nj kq 799 ROOSEVELT ROAD
[j-5j
,\\ ;)
,
g g
..,
d GLEN ELLYN, ILLINOIS 60137 d,, y,
'
%,
,o
,,gFj31r**[
>
gl7f January 21, 1981 J.
u n g r: w.
l ;;
,,
(&/,,
'
N67 Docket No. 50-346 y
Toledo Edison Company ATTN:
Mr. Richard P. Crouse Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:
Thank you for your letter dated January 9, 1981, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Report No. 50-346/80-30 forwarded by our letter dated December 19, 1980. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Since
,,
. F. Heishman, Chief Reactor Operations and Nuclear Support Branch cc:
Mr. T. D. Murray, Station Superintendent cc w/1tr dtd 1/9/81:
Central Files Reproduction Unit NRC 20b AE0D Resident Inspector,' RIII PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Helen W. Evans, State of Ohio 810230$$g