8005190ldl
.
$
.
U.S. NUCELAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
.
Report No. 50-346/80-03 Docket No. 50-346 License No. NPF-3 Licensee: Toledo Edison Company Edison Plaza 300 Madison Avenue
,
Toledo, OH 43652 Facility Name:
Davis-Besse Nuclear Power Station Unit No. 1 Inspection At: Davis-Besse Site, Port Clinton, OH Inspection Conducted: February 14-15 and March 13, 1980 kk Yd Inspector:
K. D. Ward V fp
~r Y
Approved By:
D. H. Danielson, Chief d
to Engineering Support Section 2
'
Inspection Summary Inspection on February 14-15 and March 13, 1980 (Report No. 50-346/80-03)
Areas Inspected: Spent Fuel Rack QA/QC programs and implementing welding and nondestructive examinations (hTE) procedures and record review; IE Bulletin 79-13 and IE Bulletin 79-17 activities. This inspection involved a total of 20 inspection-hours on site by one NRC inspector.
Results: No items of noncompliance or deviations were identifie.
O DETAILS Persons Contacted
The Toledo Edison Company (TECo)
- T. Murray, Station Superintendent
- C Draft, 0 erations QA Manager
- D. Huffman, Adv. Coor.
C. Greer, QA Supervisor, Operations D. Rhodes, QC Supervisor J. Schultz, QC Specialist
J. Baughman, QC Specialist W. Beien, Asst. QA Representative The inspector also contacted and interviewed other licensee and contractor employees.
- Denotes those present at the final exit interview March 13, 1980.
'
Licensee Action on IE Bulletins
)
References:
Letter dated July 13, 1979 to Mr. J. G. Keppler from Mr. J. S. Grant (Response to IE Bulletin 79-13 for Unit 1)
Letter dated August 24, 1979 to Mr. J. G. Keppler from Mr. R. P. Crouse (Response to IE Bulletin 79-17 for Unit 1)
Letter dated November 28, 1979 to Mr. J. G. Keppler from Mr. R. P. Crouse
{
(Respcase to IE Bulletin -17, Revision 1 for Unit 1)
Letter dated January 15, 1980 to Mr. J. G. Keppler from Mr. R. P. Crouse (A followup to the November 28, 1979 response on IE Bulletin 79-17, Revision 1 for Unit 1)
The NRC forwarded IE Bulletin 79-13 titled, " Cracking in Feedwater System Piping" and IE Bulletin 79-17 titled, " Pipe Cracks in Stagnant Borated Water Systems", for specific action to be taken.
1.
In the response to IE Bulletin 79-13, the inspector reviewed radio-graphs of the seven pipe to nozzle and elbow welds out to the first support on the auxiliary feedwater system line on steam generatot j
1-1.
The interpretation could not be completed on several radio-i graphs, primarily because of the density being under minimum re-quirements on the area of interest and the density of the radio-graphs through the lightest area of interest varied by more than
.
-2-
.-.
--
.
.
.
.
minus 15 percent from the density through the penetrameter. The licensee informed the inspector that the welds would be re-radio-graphed in accordance with ASME Section XI, 1974 Edition, Summer 1975 Addenda.
B&W is to perform the radiography in accordance with B&W procedure Radiographic Examination of Welds and Base Materials, 151-300, Revision 11, February 7, 1980.
The main feedwater nozzle connections are bolted on the B&W Unit and the auxiliary feedwater injection system is not used; there-fore, the feedwater level within the steam generator can be main-tained essentially constant with no intermittent cold auxiliary feedwater injection. Since the auxiliary feedwater injection system is not used, no radiography is required including the aforementioned pipe to nozzle elbow welds, reference IE Bulletin No. 79-13, Revision 2, paragraph 2.b.
Visual inspection of all feedwater system piping supports and snubbers in containment verifying operability and conformance to design is still to be performed.
IE Bulletin No. 75-13 may be completed in the next outage April 1980. The TECo " Visual In-spection of Snubbers, ST5044.01" is to be used. This is an unre-solved item.
(346/80-03-01).
2.
In response to IE Bulletin 79-17, the inspector reviewed the following:
a.
B&W NDE Procedures Ultrasonic Examination of Similar Metal Weld Seams and
.
Attachment ISI-101, Revision 11, January 30, 1976 Dye Penetrant Examination of Welds, ISI-220, Revision 2,
.
January 14, 1975 Visual Examination of Welds and Surface Conditions ISI-350,
.
Revision 3, October 13, 1975 Ultrasonic Examination for the Detection of Intergranular
.
Stress Corrosion Cracking in Stainless Steel Piping, ISI-129, Revision 3, January 1980.
b.
TECo NDE Procedures and Qualifications IE Bulletin 79-17, Visual Examination of Stagnant Welds,
.
79-17-2, Revision 0, November 29, 1979 Qualification and Certification - NDE, QCI 3023, Revision 2,
.
November 9, 1979 TECo NDE Personnel Certification - J. Singer, Level II, Visual
.
-3-
.
.
-
.
c.
The inspector also reviewed several NDE reports:
IE Bulletin 79-17 is to be completed in the next outage..
This is an unresolved item.
(346/80-03-02).
.
Functional or Program Areas Inspected 1.
Spent Fuel Storage Modification A letter was sent December 1977, to Mr. E. G. Case, Acting Director, NRC, Washington, D.C. requesting to modify the spent fuel storage facilities from 260 assembly capacity to 735. The letter stated that a modification was necessary before the first refueling (which is anticipated to be April 10, 1980) in order to replace the racks with no spent fuel in the pool and to maintain the ability to dis-charge spent fuel while maintaining full core (177 fuel assemblies)
off-load capability.
August 1,1979, Mr. R. W. Reid, Chief, Operating Reactors Branch No.
4, Division of Operating Reactors, authorized an increase in spent fuel outage capability from 260 to a maximum of 735 fuel assemblies in the spent fuel pool through the use of high capacity spent fuel racks.
2.
Metal Products Corp. (MPC) fabricated the high density spent fuel racks in accordance with TECo Specification C63 and appears to satisfy PO No. Q29045C, dated December 19, 1979, to Nuclear Energy Services (NES) from TECo and the NES QA Program for Design and Fabri.ation of Spent Fuel Storage Racks No. 81A0502, Revision 2, September 11, 1978.
3.
The inspector determined that applicable welding procedures and material were used and the appearance of the weld surface was acceptable. The following Metal Products documents were reviewed:
QA Manual No. 17PC-QA-1000 B-5, Copy 10.
a.
b.
Process Precedure Specification for GTAW. QC-PPS-219-2, June 28, 1978.
Process Procedure Specification for Repair of Defective or c.
Unsound Welds, QC-PPS-211, March 25, 1976.
d.
Filler Metal Control, QC-S01-113.2, June 7, 1977.
Process Procedure Specification for Liquid Penetrant Testing e.
of Welded Components, QC-PPS-203-3, August 23, 1977.
f.
Cleaning of Nuclear Racks, QC-PPS-218-4, September 28, 1977.
-4-
'
g.
Sand Blasting of Stainless Steel Materials and Assemblies, QC-PPS-212, December 12, 1973.
h.
Handling,PackingandShippingofNuclearFuelStorageJtacks, ENG-PPS-234, November 28, 1979.
No items of noncompliance or deviations were identified.
4.
The inspector reviewed material test and QC inspection reports for receiving, handlicg, packaging and storage. Also the following NES documents:
Document Control Procedure, 80A9003, Revision 4, July 16, 1979.
a.
b Design Calculation Notebook Procedure No. 80A9004, Revision 3, November 1977.
c.
Design Review Procedure, 80A9006, Revision 4, August 20, 1979.
d.
Procurement Control Procedure, 80A9007, Revision 5, August 7, 1979.
Nonconformance Report Processing Procedure, 80A9008, Revision 1, e.
January 15, 1979.
f.
Project Close-Out File Procedure, 80A9009, Revision 0, February 1976.
g.
Computer Code Documentation Control Procedure, 80A9010, Revision 1, September 26, 1978.
h.
Quality Assurance Audit Procedure, 80A9022, Revision 3, July 16, 1979.
i.
Specification for Qualification of Quality Assurance Program Audit Personnel, 80A9026, Revision 0, January 1977.
j.
Design Control Procedure, 80A9029, Revision 1, November 1977.
k.
Preparation of Quality Assurance Program Plans, 80A9031, Revision 0, October 1977.
1.
Qualification of Inspectors, 80A9032, Revision 3, September 19, 1979.
Preparation of Inspection Plans and Reports, 80A9034, Revision m.
1, May 15, 1978.
Inspection and Test Plan 80A1432, Revision 0, September 11, 1978.
n.
l-5-
..
-- _ ~ -
-. - --... -.. - -. -.
-
- = --
--- - - - - - -
- --- -- '
.
,
o.
Specification for the Fabrication and Inspection of the High Density Fuel Storage Racks, 80A1416, Revision 2, September 11, 1978.
p.
Removal of Existing Low Density Racks, 80A1433, Revision 2, July 1979.
r q.
Installation of the High Density Fuel Storage Rack, 80A1434, Revision 3, March 1979.
Inspection and Verification for the Installation, 80A1437, r.
Revision 1, October 1979.
f Visual Examination and Dimensional Inspection of Welds, 80A1438, s.
Revision 1, September 1979.
t.
Liquid Penetrant Examination, 80A1439, Revision 1, September 1979.
Welding Procedure Specification GTAW, Stainless to Stainless, u.
80A3228, Revision 0, October 1979.
Repair of Defective on Unusual Welds, 80A3229, Revision 0, v.
October 1979.
Houskeeping for the Removal and Installation, 80A3230, Revision w.
0, October 1979.
Field Change Procedure, 80A3231, Revision 1, October 1979.
x.
y.
Cleanliness Control for the Installation, 80A3232, Revision 1, October 1979.
Nuclear Design Analysis Report 81A0503, Revision 1, March 10, z.
1978.
Structural Analysis Design Report, 81A0504, Revision 1, March 10, aa.
1978.
bb. Thermal-Hydraulic Design Analysis Report, 81A0505, Revision 1, March 10, 1978.
Licensing Submittal Material, 81A0506, Revision 1, March 10, cc.
1978.
No items of noncompliance or deviations were identified.
!
,
5.
The inspector reviewed TECo receipt inspection reports and the follow-ing-audits:
-6-
'
.
.
.
NES, audits of Metal Products Corp. (MPC) for verification of:
a.
Implementation of inspection and test procedures.
.
.
Implementation of packing and shipping procedures.
.
Maintenance of QA records.
.
Fabrication nonconformance reporting procedures.
.
MPC QA implementation, including Welding and NDE qualifi-
.
cations and procedures.
,
b.
TECo, audit of NES activities regarding the implementation of contractual requirements; primary emphasis placed on the area of QA Program Plans and Inspection.
TECo, audit of NES to determine compliance with TECo approved c.
NES procedure of the installation of the High Density Fuel Storage Racks for D-B Unit No.l.
d.
TECo, audit of NES activities regarding the fabrication of high density spent fuel storage racks and their progress in procedures and reviews for the installation.
No items of noncompliance or deviations were identified.
Exit Interview:
,
The inspector met with site representatives at the conclusion of the inspection. The inspector summarized the scope and findings of the inspection noted in this report.
.
-7-