o F '
.
O 800s"58 '7" 9
.
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
.
REGION III
(,
.
--
Report No. 50-346/80-08 Docket No. 50-346 License No. NPF-3 Safeguards Group IV Licensee:
Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name:
Davis-Besse Nuclear Power Station, Unit 1 Inspection At:
Da vi s-Bes se Si te, Oa k Ha rbor. OH Inspection Conducted:
March 26-28,1980 Date of Last Material Control and Accounting Inspection:
October 25-28, 1977 Type of Inspection:
Unannounced Material Control and Accountability Inspectors: -
Nd V
hdWW A. G. Finley[
/
Datb Auditor 0.0$JNw tMP 16 lVO g/ P. Patterson
~
Dats
'
themist i
61aIN lV. /YO Approved By:
_JV A. H i n d, C h i e f f
Date '
Ac ?
^
.
Safeguards Branch Inspection Summary:
Inspection on March 26-28, 1980 (Report No.
50-346/80-08)
l Areas Inspected:
Facility organization and operation measurements l
and controls, inventory and inventory vertfications, thipping and receiving, storage and internal controls, records and reports and management of material control system.
The ins inspection-hours onsite by two NRC inspector (s)pection involved 36 and was begun during i
the regular hours.
Results:
The licensee was found to be in compliance with NRC re-quirements In the 7 areas examined during the inspections except for the following one item.
Failure to perform an independent
,
l fuel management audit for calendar year 1978.
(Deficiency)
l (Details 2.790(d) Information)
S-r3 # 0- W l
Ccpy e3f _
cop 1,3
_
_ 4;c.
- i.I:. 900'.:CI!T IS NOT TO 15 IML1'TED WITHOUT S."ECITIO