Responds to NRC Re Violations Noted in IE Insp Rept 50-346/80-30.Corrective Actions:Mod Added Requiring Brush Recorder Chart Speed to Be Checked Prior to Control Rod Drop Test
ML19341B263
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/09/1981
From: Crouse R
TOLEDO EDISON CO.
To: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19341B261 List:
References
1-182, NUDOCS 8101300554
Download: ML19341B263 (3)


Text

.

O TOLEDO EDISON Docket No. 50-346 Ricnamo P Cnoat License No. NPF-3 El.$"*"

mees sm Serial No. 1-182 Jcnuary 9, 1981 Mr. R. F. Heishman, Chief Reactor Operations and Nuclear Support Branch U. S. Nuclear Regulatory Conmission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Heishman:

Toledo Edison acknowledges receipt of your December 19, 1980 letter and enclosures, Appendiy A and report 80-30, referencing the viola' tion of Criterion XII of 10CFR Part 50, Appendix B.

This violation is listed as a " Severity Level VI Violation (Supplement I.F.)" in Appendix A.

Following an examination of the item of concern, Toledo Edison herein offers information regarding the item of violation.

Violation:

Criterion XII of 10CFR Part 50. Appendix B, states in part that " Measures shall be established to assure that instru-ments used in activities affecting quality are properly calibrated at specified periods to maintain accuracy within necessary limits."

Contrary to the above, calibration procedures were not provided to assure accuracy of the chart speed of the brush recorders used in Cycle 2 control rod drop test, ST 5013.02.3.

Response

(1) The chart speeds of the brush recorders used to perform ST 5013.02.3 for Cycle 2 control rod drop test were checked on November 14, 1980, and the results were forwarded to the inspectors.

The chart speeds were 2% slower than assumed.

All control rod drop times were still within Technical Specification limits.

bJAN 1 & %MS THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 3102 s on !g csaj

Docket 1o. 50-346 Page Two Serial No. 1-182 January 9, 1981

Response

(2) ST 5013.02 has been modified to require that the brush recorder chart speed be checked prior to the performance of the control rod drop test.

Since the recorder utilizes a synchronous A.C. motor and gear drive train there are no manufacturer chart speed adjustments required or possible.

(3) The Station is in full compliance as of this date.

Yours very truly, ff

==-

RPC/TDM/BJW/prk Attachment t

l J

9 q

.4,.

v.

yr,

..w-s e

n

-v.,

+ -.

7 t

ATOMIC ENERGY ACT OF 1954 SECTION 182 SUBMITTAL IN RESPONSE FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT 1 FACILITY OPERATING LICENSE NO. NPF-3 This letter is submitted in conformance with Atomic Energy Act of 1954, Section 182 relating to Mr. R. F. Heishman's letter of December 19, 1980 (Log No. 1-454).

This deals with chart speed verification of strip chart recorders used in conducting control rod drop time test.

ff

=^

Vice President, Nuclear Sworn to and subscribed before me this ninth day of January, 1981.

rh A

/

'Notar/ PuSlic UNC A L.

CC".~~' t '

NMa y pact.e _ g:;.

,5 3.,w M/ Ocimm ewon Dp.,e; e, s, in;;y