Text
..-
.
i b
a a
.
.
p* 8800g, UNITED STATES
] y.,
- ,
NUCLEAR REGULATORY COMMISSION 1:. Pg
o REGloN lli VIa j
795 aoOsEvCLT ROAD
g cLEN E1. LYN, ILUNO15 60137
- * " *
MAR 171977'
Docket No. 50-346
.
Toledo Edison Company ATTN:
Mr. Lowell E. Roe Vice President Facilities Development Edison Plaza 300 Madison Avenue Toledo, OH 43652 e
Gentlemen:
-
This refers to the inspection conducted by Messrs. R. Martin, T. Tambling, F. Maura, and R. Knop of this office on Februsry 8-11, 18-20, 23-24, and March 2-3, 1977, of activities at Davis-Besse Unit 1, Construction site authorized by NRC Construction Permit No. CPPR-80 and to the discussion of our findings with you and members of your staff at the conclusion of the inspection.
O l
The enclosed copy of our inspection report identifies areas V)
examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during the course of this inspection.
Certain other cetivities, set forth under Other Significant Items in the Summary of Findings section of the enclosed inspection report, appear Lc he deviatier.s from commitments which you have made in previous correspondence with the l
Commission. Please advise us in writing within twenty days of the corrective action you have taken or plan to take, showing the estimated date of completion with regard to these deviations.
.
Moreover, as identified in the enclosed inspection report, you are also requested to provide this office with the schedule you
-
will follow in implementing a Management Control system to assure the appropriate, periodic recalibration of instruments used to m
i O
.
s o 02 oo0 807
'
-
-
- -.
-
- --- -
~..
,
.
..
^
,.
f
'
,
,
.
.
7-N i
Toledo Edison Company-2-MAR 171977
- U/
<
l determine compliance with Technical Specification requirements (including thoce covered by Section XI of the ASME Code).
This
'
refers to those instruments whose calibration requirements were
,
I not specifically delineated in the Technical Specifications.
l Furthermore, it is our understandin;; that your program for the
i storage and protect 1on of operations phasc quality records will *
I be as stated in item 2.e, of the March 2, 1977 management inter-view portion of the report.
In accordance with Section 2.790 of the URC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this notice, the enclosed inspection report: and your response to this notice will be placed in the liRC's Public
'
Document Room, except as follows.
If this report contains information that'you or your contractors believe to be propriocary, you must apply in w-iting to this office, within twenty days of your receipt of this notice, to withhold such information from pubido disclosure. The application must include a full statement of the reasons for which the infor-mation is considered proprietary, and should be prepared so that proprietary information identified in the application g
is contained in an onclosure to the application.
'
i
-
kj'
Wo vill gladly discuss any questions you have concerning this j
inspection.
Sincerely,
.
. Gaston Fiorelli, Chief P4 actor Operations and Nuc1 car Support Branch Enclosure:
IE Inapection
.
-
Rpt No. 050--34b/77- 06
.
cc v/ encl:
Central Files Reproduction Unic NRC 20b PDR
U. Young Park, Power Siting Commission l-
-
RII RIII
.,,,e,*
- -h-
-
RIII, -
RIII RIII P
i{ (
<
/
.
Martin /ds
_ aura Tambling _.
Knop
,
Fiorelli
.u=Nau s *
(
. 3/14/77
.... *
f NRC FORM 318 (9-76) ITRCM 0240 W un s. oovtRNMENT PRINTING OFFICEa 8978 = cas.eu
_ _;