ML19319C217

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-346/77-06.Corrective Actions:Preventive Maint Program to Be Developed to Ensure Periodic Recalibr of Instruments Used to Determine Tech Spec Compliance
ML19319C217
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/17/1977
From: Roe L
TOLEDO EDISON CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19319C215 List:
References
NUDOCS 8002060784
Download: ML19319C217 (1)


Text

!

.. s 6

(*m

)

TOLEDO 1

EDISON Docket No. 50-346 LOwEu. E. ROE mm Serial No. 278 mo-l (Mel 259-5242 f

May 17, 1977 J

Mr. Gaston Fiorelli, Chie'f Reactor Operations Branch, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road i

Glen Ellyn, Illinois 60137

Dear Mr. Fiorelli:

In response to your letter of transmittal, dated March 17, 1977, of ~

NRC-0IE. Inspection Report 77-06 Toledo Edison herein offers the follow-ing:

Item:

To provide a schedule we will follow in implementing a Manage-ment Control System to assure the appropriate, periodic re-n' I

calibration of instruments used to determine compliance with Technical Specification requirements (including those covered by Section XI of the ASME Code). This refers to those instruments whose calibration requirements were not specifically deliner.ted in the Technical Specifications.

Response: A preventative maintenance program will be developed and im-pienented within nine months of the issuance of the Operating License to insure the appropriate periodic recalibration of instruments used to determine compliance with Technical Spec-ifications but whose calibration requirements were not spec-ifically delineated in the Technical Specifications.

Yours very truly, 4