IR 05000346/1972003

From kanterella
Jump to navigation Jump to search
Inquiry Rept 50-346/72-03: on 721006,piping Spools for Facility Found to Contain Tack Welds Made by Unqualified Welders
ML19326A374
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/11/1972
From: Erb C, Vetter W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19326A340 List:
References
50-346-72-03, 50-346-72-3, NUDOCS 8002030180
Download: ML19326A374 (1)


Text

..

.

.

,

Y

O in (v)

U. S. ATOMIC ENERGY COMMISSION DIRECTORATE OF REGULATORY GPERATIONS

REGION III

RO Inquiry Report No. 050-346/72-03 Q (CDR)

Subj ect: Toledo Edison Company Toledo, Ohio License No. CPPR-80 Davis-Besse Class I Piping Spools Incorporating Tack Welds Made by Unqualified Welders in Violation of Section III ASME Code Prepared by:

CarlM. Erb [/).'

/8 " // ~ 78!.

(Date)

Reviewed by:

W. E. Vetter, Chief [M '

/4 -//- 72.

Reactor Construction Branch (Date)

A.

Date and Manner AEC was Informed:

,

By Mr. L. E. Roe, at 2 p.m. on October 6, 1972, during a telephone call to the inspector.

B.

Description of Particular Event or Circumstance:

Some 500 piping spools for the Davis-Besse facility were deter-mined to contain tack welds which were made by welders not qualified to ASME Section III. These Class I piping spools, requiring inspection Levels 1, 2, and 3, are both stainless and carbon steel and are of various sizes. Thae spools were fabricated by Grinnel in Kernersville, North Carolina, and the discrepancy was discovered by Bechtel resident inspectors.

C.

Action by Licensee:

The licensee has discussed this matter with Bechtel and, directly, with Grinnel and informed the inspector that steps will be taken to assure that Grinnel obtains a favorable ruling from ASME or takes other action, as necessary, to

. maintain a valid "NPT" stamp on the subject spools.

t J

.. -

s o oz oaown

,

.