J MAR 131973 1
]
y V. E. Yetter, Chief, Reactor Construction Branch, RO:III 9
- M o.
TOLEDO EDISON COMPANY (DAVIS-BESSE) - DOCKET NO. 50-346 IMPROPER TACE WELDS FOR CLASS 1 PIPING The licensee submitted a final report of the subject, dated February 12, 1973, in accordance with 10 CPR 50.55(e). The report was prapared by Grinnell Corporation and was dated January 19, 1973. BO's evaluation of this report is con-
-d.
rainad in the enclosed memo from Potapovo to Henderson dated
,j March 8, 1973. It appears that the nondestructive testing of the affected welds provides reasonable assurance that g
the welds are sound and acceptable.
RO proposes to audit Grinnell Corporation in the near future to verify that procedures have been implemented to prevent recurrence of this code nonconformance.
'i
\\L Original siga d by 1.B. Hendersca i
J. B. Henderson, Chief h
Construction Branch j
Directorate of Regulatory Operations
Enclosure:
As stated
}
cc:w/ encl.
J F.E.Krossi, BO l
D.F.Eauth, ED 4
[ p,4 j
a.a.En aen, no 3
J.G.Emppler, RD l
B.R. Crier, RO III f1
{
Ioeal PDR' FDR I,
j DR Central Files
?,,
s 8002030(S]
i' bec:w/ enc 1.
CDR-52 file f
i
(
A 17 dl
(.
RNg//
ij a,,ics,
f DENhitesell/
P
!4 x-7451 mib JBHe.dgrson j
sunnum >
am>.3].14/73 3/. M3 I