EDISON GdNN J. SWPSON vice President. Power January h, 1973 Mr. Frank E. Kruesi Director of Regulatory Operations U.S. Atomic Energy Commission Washingt.on, D.C.
205h5 Docket No. 50-3h6
Dear Mr. Kruesi:
You are hereby notified of a situation which could be considered re-portable in accordance with 10 CFR Part 50.55(e)(1)(1), " Conditions of Construction Per=its".
This situation relates to the veld records for the Davis-Besse Nuclear Power Station steam generators.
(N A recent audit of veld records conducted by Babcock & Wilcox's (nuclear
('s) steam supply system supplier, B & W) QC organization at their Barberton Works has shown that filler wire qualification test reports are incom-plete for several heats of weld filler materials used in steam generator fabrication. B & W is currently reviewing records to define the extent of the incomplete documentation.
We vill submit a written report on the documentation situation within 30 days.
Yours very truly, a > > 5:s W
.,/ -
,,_.7,,,
/
GJS:cd cc Mr. Boyce H. Grier, Regional Director Region III J