Summarizes Deficient Piping Spool Fabrication by Unqualified Welders.Insp & Surveillance of Grinnel Corp Performed by Bechtel.Grinnel Instituted Procedures Ensuring Qualified Personnel & Strict Adherence to Procedures
ML19326A349
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/12/1973
From: Sampson G
TOLEDO EDISON CO.
To: Kruesi F
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19326A340 List:
References
NUDOCS 8002030166
Download: ML19326A349 (2)


Text

.

q V ,

~ ~

- ,,w.e . % b n'

-( \

s Q./ '

t_.... m Toteco 4 _ C-er a h, t.,naus GWNN J. SAMPSON v.ca President, Power February 12, 1973 Docket No. 50-3k6 Kr. Frank Kruesi, Director Directorate of Regulatory Operations U.S. Atc=ic Energy Cc__ission Washington, D.C. 20545

Dear Mr. Kruesi:

Our letter of January 18, 1973, notified you of a situation where a significant nu=ber of piping spools for AS:E Section III piping systems for the Davis-3 esse Euclear Pcver Station had been fabricated at the Kernersville Plant of ITI-Grinnell containing tack velds perfor=ed by velders not previcusly qualified. Sis-letter contains a su==ary of fg the activities contributing to this deficiency, the resolution of the

(

\

deficiency, and corrective actions taken to prevent recurrence.

\_Y ASPE Section III piping for the Davir-Besse Kuclear Power Station is being- fabricated by ICI-Grinnell Corporation at the Kernersville Plant in Ucrth Carclina. Sechtel Corporation, acting as agent for Toledo

. Edison, is perfor=ing routine shop inspection and surveillance of activities at the Kernersville Flant involving this pipe fabrication.

During routine shop inspection and surveillance activities, it was found that sc=e tack velding during fabrication fit-up vas being per-forced by fitters not qualified for velding in accordance with Secticn IX cf the AS:E Code. An in-depth audit following this discovery revealed that 118 spool pieces cf ASE Secticn III, Class 2, and 240 pieces of Class 3 piping were involved. In additien, two spool pieces of ASE Section III, Class '1, piping were tack welded by a velder qualified only in the 1G position withcut positive verificatien that all tack velding was actually perfor:ed in the 1G position. Of these spoel pieces, 72 ASE Class 2 pieces and 97 Class 3 pieces had been shipped to the job site.

Since all velds in AS:2 Class 1 and Class 2 pipe require radiography, these pieces vere accepted on the basis of saticfactory radiographic examination of each veld invcived. Secticn IX cf the ASE Code per=its qualification of velders by radicEraphic examination of a single butt veld. The AS'E Class 3 pipe does net require radiographic examination p) i

\/

of velds, and, in crder to qualif-y this pipe, Grinnell was. required to radiograph a =initu: cf four velds which included tacks made by each fitter involved. In addition, each fitter was qualified in accordance with the nechanical testing precedures contained in Section IX of the #

d,'

ASIC Code.

80020301% TCLECO. OH;O 43652 Pj#"(#

THE TOLECO ED! SON CCMPANY ED;3ON PLAZA 300 MADISON AVENUE COPY SENT REGION II Lh'. %)

Mr. Frank Kruesi i

[] ' Page 2  !

1 i ) February 12,-1973 '

The Authorized Code Inspector of the ASME has been aware of thi.s situation and has signed the ASFE partial data reports for these pieces involved, confirming that these pipe spools =eet the requirements of ASME Section III.

Extensive procedures have been instituted by Grinnell at the Kernersville Plant to ensure that no velding is done by unqualified personnel e.nd that all procedures are strictly adhered to. Bechtel Shop Inspectors are main-i taining close inspection and surveillance on shop procedures and shop work and Toledo Edison is conducting independent audits of the Eernersville Plant operations.

A report IIo.1300 has been prepared by ITT-Grinnell concerning the subject situation a=plifying the abote information. One copy of this report is enclosed.

Yours very truly,-

, 9,/,f * /1. ,- ,

b //// ' 0'NhSG

/ -

,/ &

s GJS:cd Enclosure CC Mr._Boyce H. Grier v/1 v