IR 05000346/1972004
| ML19319B987 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/31/1972 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sampson G TOLEDO EDISON CO. |
| Shared Package | |
| ML19319B986 | List: |
| References | |
| NUDOCS 8001290716 | |
| Download: ML19319B987 (3) | |
Text
gist c,
,
-
RO Files
'
UNITED STATES j.r ATOMIC ENERGY COMMISSION
.
- e, y
DIRECTORATE O REGU ORY OPERATIONS Ud 4 5
(j 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 6o137
,
weg (312) ass-2660 August 31, 1972 Toledo Edison Company
'
.
Docket No. 50-346 ATTN:
Mr. Glenn J. Sampson Vice President, Power 420 Madison Avenue Toledo, Ohio 43601 Gentlemen:
This refers to the inspection conducted by Mr. T. E. Vandel of this
~
office on August 22 and 23,1972, at the P-X Engineering Company, Incorporated plant, located in Woburn, Massachusetts, relative 'to construction activities at the Davis-Besse site authorized by AEC Construction Permit No. CPPR-80 and to the discussion of our findings,gt the conclusion of the inspection with Mr. E. M. Wilcox of your staff.
The area examined during the inspection was the conduct of an audit by Mr. Wilcox relative to Class I structural support components.
.
[V T
Within this area, the inspection consisted of an examination of the audit procedures and techniques used, observations by the inspector, and an interview with your representative at the conclusion of the inspection.
During this inspection, it was found that certain of your activities appear to be in noncompliance with 10 CFR Part 50, Appendix B.
The item and reference to the pertinent requirement is listed in the enclosure to this letter.
Please provide us within 30 days, in writing, with your comments concerning this item, any steps which have been or will be taken to correcc it, any steps that have been or will be taken to prevent recurrence, and the date all corrective action or preventive measures were or will be completed.
Your reply should emphasize, in particular, any appropriate changes that have been or will be made to improve the effectiveness of your quality
,
>
assurance program to prevent recurrence.
With regard to questions raised during this inspection, we understand that you intend to require P-X Engineering to take corrective action relative to: (1) weld rod storage, (2) procedure approval practices, and (3) lack of welder qualification records.
c.
N
'
d
.
g 0o1290 7/
~
'
-
-
_
._
-
.
Toledo Edison Company-2-August 31, 1972
.
Should you have questions concerning this inspection, we will be glad to discuss them with you.
Sincerely yours,
~
.
.
Boyce H. Grier Regional Director
'
.
Enclosure:
Description of !!oacompliance Item i
I cc:
L. E. Roe, Project
,
!
Engineer N. L. I!adsuorth, General Superiatendent J. D. *Lenardson, Quality Accurance Eastacar i
bec: J. B. Henderson, R0 H. D. Thornburg, RO R. H. Engelken, RO
'
G. W. Reinmuth, RO P. A. Morris, RO A. Giambusso, L DR Central Files RO Files PDR Local PDR NSIC DTIE
!
3
.
.,. ---. - -
,
,
_,, -.
.
---
- - - -. - -,, - - _.
,,
, - -. _ -
-. -,
. - _..
. -. - - - -
..
-
.
_
$
ENCLOSURE
.
Docke t No. 50-346 Certain activities under your construction permit appear to be in noncompliance with 10 CFR Part 50, Appendix B, as indicated below.
-
Appendix B, Criterion XVIII, requires, in part, that, "A l
comprehensive system of planned and periodic audits shall be carried ou*t to verify compliance with all aspects of the quality ass:irance program and to determine the effectiveness of the program."
Contrary to the above, the audit performed by your representa-tive at the P-X Engineering Company plant on August 22 - 23, 1972, was conducted without reference to a complete record of quality requirements.
Specifically, the audit was performed without prior knowledge or full consideration of a number of changes and revisions to the applicable purchase specifica-tions.
..
\\
%
.
.