IR 05000341/1989008
| ML20247Q094 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/01/1989 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sylvia B DETROIT EDISON CO. |
| Shared Package | |
| ML20247Q104 | List: |
| References | |
| NUDOCS 8906060329 | |
| Download: ML20247Q094 (2) | |
Text
-
.
,
_
_ _ _ _ _ _
-
_
c,
' g x eCL
-
- 1.
(
p V
JUN 1 igsg
.
E'
Docket No. 50-341 I
The Detroit Edison Company ATTN:
B. Ralph-Sylvia,
' Senior Vice President Nuclear Operations 6400 North Dixie-Highway Newport,.MI: 48166
. Gentlemen:
This. refers:to the routine safety inspection conducted by Messrs. W. G. Rogers, P. 'Pelke, K. Ridgway and S. Stasek. of this office on February 18 through April'10, and May 17-19, 1989,. of activities at Fermi 2 authorized by Facility
' Operating License No.:NPF-43 and to. the discussion of our findingsLwith
. Mr. W. Orser. at the' conclusion of the inspection.
.The enclosed copy of.our inspection report identif.ies areas-examined during
'the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and
. interviews with personnel.
During this inspection, certain of your activities appeared to be in violation of. NRC requirements, as described in the enclosed Notice of Violation. With respect to items 1 and 2 the inspection determined that actions have been taken to correct the identified violations and to prevent recurrence.
Our understanding of your corrective actions-is described in Paragraphs 2, 3 and 8 of.the enclosed inspection report.
Consequently., no reply to this violation is~ required and we have no further questions regarding this matter at this time.
Regarding the remaining item, a written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be-placed in the NRC Public Document Room.
'!
Tf 0\\
/
!
l 8906060329 890601
PDR ADOCK 05000341
\\
Q.
'
__
_ _ _ _ _ _ _ _ _ _ _ _ _ _ = _ _ _ _ _
_____ _
_ _ _ _
_
_ _
___
j
,.
..
- - - -
'
.
c i
s
,
,
.
The Detroit Edison Company
JUN 1 1989 We will gladly discuss any questions you have concerning this inspection.
Sincerely, Richard C. Knop, Chief Reactor Projects Branch 3-Enclosures:
1.
Notice of Vio'
- on 2.
Inspection'Re' "t No. 50-341/
308 cc w/ enclosures:
Patricia Anthony, Licensing P. A. Marquardt, Corporate Legal Department DCD/DCB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Harry H. Voight, Esq.
Michigan Department of Public Health Monroe County Office of Civil Preparedness
,
o C
b/t(
G et "
^
ke/mnj.
K p ing
,g
- - - _ -