IR 05000341/1989008

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-341/89-08 on 890218-0410 & 0517-19 & Notice of Violation
ML20247Q094
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/01/1989
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20247Q104 List:
References
NUDOCS 8906060329
Download: ML20247Q094 (2)


Text

-

.

,

_

_ _ _ _ _ _

-

_

c,

' g x eCL

-

  • 1.

(

p V

JUN 1 igsg

.

E'

Docket No. 50-341 I

The Detroit Edison Company ATTN:

B. Ralph-Sylvia,

' Senior Vice President Nuclear Operations 6400 North Dixie-Highway Newport,.MI: 48166

. Gentlemen:

This. refers:to the routine safety inspection conducted by Messrs. W. G. Rogers, P. 'Pelke, K. Ridgway and S. Stasek. of this office on February 18 through April'10, and May 17-19, 1989,. of activities at Fermi 2 authorized by Facility

' Operating License No.:NPF-43 and to. the discussion of our findingsLwith

. Mr. W. Orser. at the' conclusion of the inspection.

.The enclosed copy of.our inspection report identif.ies areas-examined during

'the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and

. interviews with personnel.

During this inspection, certain of your activities appeared to be in violation of. NRC requirements, as described in the enclosed Notice of Violation. With respect to items 1 and 2 the inspection determined that actions have been taken to correct the identified violations and to prevent recurrence.

Our understanding of your corrective actions-is described in Paragraphs 2, 3 and 8 of.the enclosed inspection report.

Consequently., no reply to this violation is~ required and we have no further questions regarding this matter at this time.

Regarding the remaining item, a written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be-placed in the NRC Public Document Room.

'!

Tf 0\\

/

!

l 8906060329 890601

PDR ADOCK 05000341

\\

Q.

PDC

'

__

_ _ _ _ _ _ _ _ _ _ _ _ _ _ = _ _ _ _ _

_____ _

_ _ _ _

_

_ _

___

j

,.

..

- - - -

'

.

c i

s

,

,

.

The Detroit Edison Company

JUN 1 1989 We will gladly discuss any questions you have concerning this inspection.

Sincerely, Richard C. Knop, Chief Reactor Projects Branch 3-Enclosures:

1.

Notice of Vio'

on 2.

Inspection'Re' "t No. 50-341/

308 cc w/ enclosures:

Patricia Anthony, Licensing P. A. Marquardt, Corporate Legal Department DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Harry H. Voight, Esq.

Michigan Department of Public Health Monroe County Office of Civil Preparedness

,

o C

b/t(

G et "

^

ke/mnj.

K p ing

,g

- - - _ -