Text
.
.
,
.
-.
...
.-
..
,
3%
[>R 40
UNITED STATES
.
'o NUCLEAR REGULATORY COMMisslON
["
'n t.l REGION 11
lt j
~
ATLANTA, GEORGI A 30323 101 MARIETTA STREET N.W.
,..
,
'
- *..... *
MAY :2[81937
"
.
,
.
Report Nos.: 50-338/87-14 and 50-339/87-14
Licensee: Virginia Electric and Power Company Richmond, VA 23261
Docket Nos: 50-338 and 50-339 License Nos.: NPF-4 and NPF-7
'
Facility Name: North Anna Power Station
.
Inspection Conducted: M 11-15, 1987 Inspector:
$
[C?7 i
B. K. Revsin'
\\
Date Signed
//7 Approved by:
we
'l C. M. Hoky, Se$1on Chief.
Date Signed j
Division of Radiation Safety and Safeguards i
SUMMARY Scope:
Ihis routine, unannounced inspection involved onsite inspection in the area of radiation protection and included:
organization and management; external exposure control and assessment; control of radioactive materials; contamination, surveys and monitoring; solid waste; transportation of radioactive materials; refueling outage activities, allegation followup and followup on previous enforcement issues and inspector followup items.
Results:
One violation - failure to maintain radiation exposure records in accordance with instructions contained on Form NRC-5.
!
c i
h l
P G
!
,
. _,. -, - - -
.
- -. -, -.,
...-.-. - --, -
.. -
- -. - -
=. - -..
'
.
REPORT DETAILS 1.
Persons Contacted Licensee Employees
- E. W. Harrell, Station Manager
- E. R. Smith, Assistant Station Manager
- A. H. Stafford, Superintendent, Health Physics
- D. T. Johnson, Supervisor, Quality Assurance
- G. Hareness, Licensing Coordinator
- W. I. Bartlett, Senior Staff Health Physicist H. L. Hay, Quality Assurance T. Peters, Assistant Health Physics (HP) Supervisor E. Dryer, Senior Staff HP D. Ross, Senior Staff HP Other licensee employees contacted included eight technicians, two security force members, and one office personnel.
Other Organizations Radiation Protection Services, Numanco, Inc.
Nuclear Regulatory Comission
- J. L. Caldwell, Senior Resident Inspector
- Attended ex1t interview 2.
Exit Interview The inspection scope and findings were summarized on May 15, 1987, with those persons indicated in Paragraph 1 above.
One violation, failure to maintain exposure records in accordance with instructions contained on Form NRC-5 (Paragraph 5.e), was discussed in detail.
The licensee acknowledged the inspection findings and stated that they would confer with NRC management prior to determining whether an exception to the violation would be taken.
The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspection.
3.
Licensee Action on Previous Enforcement Matters (92701, 92702)
(Closed) Violation (50-338, 339/86-27-01) Failure to establish calibration procedures for Alpha Scintillation Counter No. 737.
The inspector reviewed the licensee's response dated January 19, 1947, and verified that the corrective actions specified in the response had been implemente.
(Closed) Unresolved Item (50-338, 339/86-07-02) Density thickness for whole body dose assessment.
The licensee was informed that this matter had been escalated to the status of a violation (Paragraph 5.e) and that the unresolved item was now considered closed.
4.
Organization and Management Controls (83722)
The licensee is required by Technical Specification (TS) 6.2 to implement the plant organization as shown in Figure 6.2-1.
The responsibility, authorities, and other management controls were further outlined in Chapters 12 and 13 of the Final Safety Analysis Report (FSAR).
The inspector reviewed the licensee's staffing level and lines of authority as they relate to radiation protection and transportation of radioactive materials, and verified that the licensee had not made organizational changes which would adversely affect the ability of the licensee to implement critical elements of its radiation protection program.
The licensee stated that Health Physics (HP) was authorized 92 positions, 89 of which were filled.
The three vacant positions were senior level, i.e., Supervisor for Technical Services, and Assistant HP Supervisor (Radioactive Materials Shipping), and a Shift Supervisor.
Personnel had been shifted to these positions as acting interim supervisors, and a search was underway for permanent replacements.
For the ongoing Unit 1 outage,107 junior and senior HP technicians were onsite.
It was anticipated that eight additional technicians would be added to bring the total to 115. Also, 64 decontamination personnel were onsite for the outage.
The inspector discussed with the HP Superintendent the type, methods, and degree of interaction with the contract personnel.
The licensee stated that while most jobs were covered by contractor personnel oversight was i
exercised by the inhouse HP group through the HP rovers in containment and by tours of work areas by HP shift supervisors.
j No violations or deviations were identified.
5.
External Occupational Exposure Control and Personnel Dosimetry (83524)
a.
requires the licensee to determine an individual's accumulated occupational dose to the whole body on a Form NRC-4 or its equivalent record prior to permitting an individual to exceed the limits specified by 10 CFR 20.101(a).
The inspector i
reviewed selected occupational exposure histories for individuals who exceeded the 10 CFR 20.101(a) values and determined that exposure histories were being completed and maintained as required.
b.
10 CFR 20.202 requires each licensee to supply appropriate personnel monitoring equipment to specific individuals and require the use of
'
.
such equipment.
During tours of the plant the inspector observed workers wearing appropriate personnel monitoring devices.
c.
Technical Specification 6.11 requires the licensee to have written radiation protection procedures, including the use of radiation work permits (RWPs).
The inspector reviewed selected RWPs that had been written and executed for the Unit I refueling outage.
They were:
RWP No. 87-1482, Remove and Store Primary Manways for Steam Generators (S/G) "A," "B" and "C."
RWP No. 87-1503, Remove and Store Diaphragms, Install Nozzle Covers, and Install Ventilation on S/G
"A."
RWP No. 87-1504, Remove and Store Diaphragms, Install Nozzle Covers and install Ventilation on S/G "C."
RWP No. 87-1522, Remove and Store Diaphragms, Install Nozzle Covers and Install Ventilation on S/G "B."
The inspector verified that adequate radiological controls had been specified in terms of radiological surveys, dosimetry, protective clothing and respiratory protective equipment.
d.
10 CFR 20.203 specifies the posting, labeling and control requirements for radiation areas, high radiation areas, airborne radioactivity areas and radioactive material.
Additional requirements for control of high radiation areas are contained in Technical Specification 6.12.
During tours of the plant, the inspector reviewed the licensee's posting and control at radiation areas, high radiation areas, airborne radioactivity areas, contamination areas, radioactive material areas and the labeling of radioactive material.
The inspector verified that locked hign radiation areas in the Auxiliary Building and Unit I containment were maintained locked as required.
e.
10 CFR 20.401(a) requires that each licensee maintain records showing the radiation exposures of all individuals for whom personnel monitoring is required and that such records be kept on Form NRC-5 in accordance with the instructions contained in that form.
Form NRC-5, Item 5, requires that unless the lenses of the eyes are protected with eye shields having a tissue equivalent density thickness of at least 700 mg/cm, dose recorded as whole body dose r
should include the dose delivered through a tissue equivalent absorber having a density thickness of 300 mg/cm2, During two previous inspections (Report Nos. 50-338, 339/86-07 and 50-338, 339/86-2/), the density thickness at which whole body dose was assessed when the lenses of the eyes were not shielded with
-
.
700 mg/cm2 of material was addressed.
At the North Anna plant, personnel are not required to routinely wear eye shields, and in no case, do any available eye shields provide the required density thickness of 700 mg/cm2 Due to the physical make-up of the licensee's thermoluminescent dosimeter (TLD) badge, direct measurement of whole body dose delivered through an absorber equivalent to a density thickness of 300 mg/cm2 was not possible, and therefore whole body dose was assessed through a tissue equivalent absorber of 1000 mg/cm2 Consequently, whole body dose delivered between density thicknesses of 300 and 1000 mg/cm2 was not assessed by the licensee for whole body exposure pruposes.
10 determine the adequacy of their dosimetry system to assess whole body dose between 300 and 1000 mg/cm2, (Unresolved Item No. 50-338, 339/86-07-02), the licensee undertook studies to characterize the radiation field capable of producing doses between the above density thicknesses.
Even though studies performed by the licensee indicated that the difference between whole body dose measured at 300 or 1000 mg/cmd was small, approximately one percent of the beta radiation dose was missed by measurements through 1000 mg/cm2 of absorber rather than 300 mg/cm2, the licensee reviewed their dosimetry records since the installation of the dosimetry system approximately 10 years ago. The licensee concluded that, based on the data thus accumulated concerning the beta field at the plant, no individual was likely to have exceeded any regulatory limit. The licensee stated that further studies were planned to more tully characterize the beta field to which workers are exposed.
Failure to assess whole body dose through a tissue equivalent absorber ot 300 mg/cm2 or to shield the lenses of the eyes with material having a desity thickness of at least 700 mg/cm2 was identified as an apparent violation of 10 CFR 20.401(a) (50-338, 339/87-14-01).
f.
10 CFR 20.101(a) states that no licensee shall possess, use, or transfer licensed material in such a manner as to cause any individual in a restricted area to receive in any period of one calendar quarter from radioactive material and other sources of radiation a total occupational dose in excess of 75 rems for the skin of the whole body or 18.75 rems for the extremities.
The inspector was informed that during the ongoing Unit 1 refueling outage four instances of microscopic, " hot" particles had been found on personnel.
Three of the particles were identitied as pure cobalt-60 while the fourth particle contained a variety of fission l
products.
The licensee postulated that this latter particle was ceramic in nature with fission products imbedded within i.
.
Dose calculations performed by the licensee for these cases were reviewed by the inspector and were found to be 2.214,.0.874 and 1.671 rem to the skin of the whole body for the cobalt-60 particles.
For the mixed fission product particle, a dose of 0.477 rem to the extremities was assigned.
The licensee stated that training on detection and isolation of these " hot" particles had been performed.
Numerous other instances of personnel contamination had been identified by the licensee.
In these cases, the contamination was uniformly distributed over a larger area when found on the worker's skin. Many of the contamination events were due to activity found on shoes and clothing.
From January I to May 10, 1987, 347 personnel contamination events had been documented.
During 1986, 122/
personnel contaminations had occurred, and as a consequence, for 1987, a goal of no more than two per day (730 per year) had been established.
The licensee stated that realization of that goal seemed unlikely since the plant was only four weeks into the Unit I
refueling outage which would be followed by a Unit 2 refueling outage.
Nevertheless, the licensee stated that every effort was being undertaken to minimize the number of these events.
6.
Internal Exposure Control and Assessment (83725)
a.
10 CFR 20.103 establishes the limits for exposure of individuals to concentrations of radioactive materials in air in restricted areas.
This section also requires that suitable measurements of concentrations of radioactive materials in air be performed to detect and evaluate the airborne radioactivity in restricted areas.
The inspector reviewed the results of air samples taken in support of steam generator work covered by the RWPs described in Paragraph S.c air samples had been evaluated for alpha, beta and gamma activity.
Observation of the Maximum Permissible Concentration (MPC) hour assignments for selected individuals performing S/G activities revealed that all exposures were well under the 40 MPC hour control measure, b.
TS 6.11 states that procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.
HP Procedure 8.0.50, Section 4.4.7 states that during each month, at least 10 routine air samples inside the Radiation Control Area (RCA)
shall be counted for long-lived gross alpha radioactivity.
The inspector reviewed the results of Quality Assurance (QA) Audit No. N-87-04, Health Physics Dose Control and Administration, March 1987.
Une finding of this audit concerned air sampling, failure to analyze routine air samples for long-lived gross alpha radioactivity.
During discussions with licensee representatives the
.
,
-
,
--
.
,
- - -. -.. - -
-. - -.
-r-
.
inspector learned that during the last fuel cycle for Unit 1, leakages from two fuel bundles had been confirmed by fuel sipping.
The licensee stated that new procedures for alpha air sampling had recently been implemented and that awareness of new procedural requirements by the HP staff was sometimes incomplete.
The licensee was informed that failure to assess long-lived gross alpha activity of air samples would normally be considered a violation of the requirements of TS 6.11.
However, the NRC Enforcement Policy delineated in 10 CFR 2, Appendix C,1986, states that a Notice of violation will generally not be issued for violations identified by the licensee provided that the licensee identification meets the criteria specified by 10 CFR 2.
The inspector stated that this violation met the required criteria and ~
consequently would be considered licensee identified. The licensee's corrective action wilI be reviewed during future inspections (50-338, 339/87-14-02).
c.
10 CFR 20.103(b) requires the licensee to use process or other engineering controls, to the extent practicable, to limit concentrations of radioactive material in air to levels below that specified in 10 CFR Part 20, Appendix B, Table I, Column 1 or limit concentrations, when averaged over the number of hours in any week during which individuals are in the area, to less than 25 percent of the specified concentrations.
The use of process controls and engineering controls to limit airborne radioactivity concentrations in the plant was discussed with licensee representatives and the use of sucn equipment was observed during tours of the plant.
No violations or deviations were identified.
7.
Control of Radioactive Materials and Contamination, burveys and Monitoring (83526)
a.
10 CFR 201(b), 20.401 and 20.403 require the licensee to perform surveys and to maintain records of such surveys as necessary to show compliance with regulatory limits.
The Final Safety Analysis Report (FSAR) of Units 1 and 2, Chapter 12, outlines survey methods and instrumentation while each Unit's TS 6.11 requires adherence to written procedures for all operations involving personnel radiation exposure.
During plant tours, the inspector examined radiation levels and contamination survey results posted at the entrance to the RCA. The inspector also reviewed tne results of selected surveys taken in support of the steam generator work in Unit 1.
Selected RWPs controlling general, as well as specific radiological activities were also reviewed.
The inspector observed the use of survey instruments by plant staff and examined calibration stickers on radiation
.. _
,
- _. _ _ _ _ _ - - -
,,.
.;
'
s-
'
,.
,
,
4
,
'
'
<
,
b r
>
q H,dection instruments 3in use by licensee personnel.
Instrument use appeared to be adequate and all instrunents examhd hou Leen calibrated.
.
b.
10 CFR 20.203(f) states that, except as provided by 20.203(f)(3),
each container of licensed material shall bear a durable, clearly visible label identifying the radioactive contents and shall bear the radiation caution symbol and the words " Caution" or " Danger, Radioactive Material," and shall provide sufficient information to permit individuals using or handling the containers, or working in the vicinity thereof, to take ' precautions to avoid or minimize exposures.
Durir.g tours of the plant and the adjoining protected area, the inspector checked containers of radioactive material for proper
, labeling.
No violations or deviations were identified.
8.
Transportation (86721)
,
10 CFR 71.5 requires that each licensee who transports licensed material eutside !% ;or.ff w Of hi algt ar other place of use, or who deliver::
htcased Wet.arial f.o a c&lrtiUI for transport, shall comply with the applicable requirements of the regulations app (ropriate to the mode ofD0T) in 49 C transport of the Department of Transportation through 189.
The inspector reviewed selected records of radicaci.ive waste shipments and non-exempt radioactive materials shipments performed during 1987 and verified that the requirements of 49 CFR Parts 170 through 189 had been met for those shipments.
No violations or deviations were identified.
9.
Solid Waste (84722)
10 CFR 20.311 requires that the licensee maintain a tracking system iur radioactive waste shipments to verify that shipments have been received without undue delay by the intended recipient. The inspector reviewed the tracking log maintained by the licensee ar.d select.ea copies of returned receipt acknowledgements in the shipping files for shipments performed in 1987.
10 CFR 61.56 specifies the waste characteristics and stability requirements for low level radioactive waste.
Through discussions with licensee representatives and review of selected records, the inspector determined that waste stability, when required, was achieved by use of pproved containers or by solidification. Solidification was performed by a vendor and included formation and testing of a demonstration product prior to each batch processin _.
._
.-
-
-
.
10 CFR 20.311 requires a licensee who transfers radioactive waste to a land disposal facility to prepare all wastes so that it is classified according to 10 CFR 61.56.
10 CFR 61.55(a)(8) states that the concentration of a radionuclide may be determined by indirect methods such as the use of scaling factors which relate the inferred concentration of one radionuclide to another that is measured if there is reasonable assurance that the indirect methods can be correlated with actual measurements.
lhe inspector verified that concentrations of selected radionuclides which were inferred by use of scaling factors could be correlated with actual measurements, i.e., within a factor of 10.
No violations or deviations were identified.
10. Plant Statistics a.
Radioactive Waste Shipments The inspector reviewed the radioactive waste shipment log and determined that during 1986, 41 shipments were made constituting 1G,041 cubic feet containing 607 curies.
As of May 14, 1987, seven shipments had been made consisting of 2,565 cubic feet containing seven curies.
Tne licensee stated that no backlog of waste was
,
a.41ntaliied cnstle, partially due to lack of storage facilities.
'
b.
Centaminated Areas
!
In determining square footage t the plant maintained under contamination controls, the licensee included all areas excepting Units 1 and 2 containment.
At the beginning of January 1987, 14,965 square feet were maintained as contaminated.
This had decreased to 13,7/3 square feet at the end of March 1987, but with refueling outage activities, contaminated areas - had increased to 20,29/ square feet, or approximately 17 percent of the plant area.
c.
Collective Dose During 1986, 722 man-ren (361 per unit) were expended during performance of work at the site.
For 1987, a goal of 1,123 (562 per unit) man-rem had been established.
The licensee stated that they were optimistic about achieving)that goal.As of April 30, 1987 (two weeks into the refueling outage 141 man-rem had been expended.
No violations or deviations were identified.
L--
-
.
11. Allegation Followup (99014)
RII-87-1-0064 The alleger stated that he was hired through NUMANC0 which placed him on the job at the North Anna facility. He stated that he was working as a HP technician for the outage in Unit 1 and that he was terminated from his employment at North Anna on May 5, 1987, as a result of being found asleep on the job. The alleger stated that at the time of termination he was the responsible HP for a Westinghouse crew performing eddy current testing on the S/G.
The alleger stated that his primary concern was that HP technicians were being overworked and that they were working an average of 18 to 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> per day.
He stated that he had been asleep for approximately 10 minutes when a Shift Supervisor found him.
He stated that no one intended to take any action against him for sleeping because they realized the stress the HP technicians were working under. He stated when the Plant Manager found out he had been asleep on the job, the Plant Manger insisted that he be terminated in accordance with policy.
Discussion In discussions with the licensee it was stated that working hours at the site were controlled by Administrative Procedure 20.3, Hours of Work, September 5, 1985, Section 4.1.b specifies that HP technicians are covered by the procedure and Section 5.1.b stated that individuals will not be permitted to work more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any seven day period.
Section 6.1 specified that an exception to overtime limitations may be granted on a temporary basis.
The inspector reviewed with licensee representatives the circumstances associated with the above incident.
Radiological Problem Report No.87-116 stated that at approximately 0715 hours0.00828 days <br />0.199 hours <br />0.00118 weeks <br />2.720575e-4 months <br /> on May 5, 1987, a North Anna HP technician lying in a fully horizontal position with his eyes closed at the block area between A and B cubicle on the 261 foot elevation in containment.
The Shift Supervisor asked the contractor to leave containment and requested that his access to the RCA be suspended pending an investigation.
lhe HP Operations Supervisor reviewed the circumstances and recommended an indefinite suspension for the contract HP for being inattentive while on duty.
Evaluation of the incident by the HP Superintendent resulted in the conclusion that the behavior exhibited by the contract HP was unacceptable for continued support of North Anna Power Station.
NUMANC0 was informed that the individual's access to the plant would be permanently restricted. The HP Superintendent explained that any action taken by NUMANCO concerning this individual's employment status was under the purview of NUMANC0 only and that the only control Virginia Power Company exercised in the matter was that of plant access which in this case was revoked in accordance with plant policy as promulgated in a memoranda from the Station Manager to all employees on April 20, 1987. The memorandum stated that "any VEPC0 or contractor employee found asleep on duty shall be imediately placed on indefinite suspension and will be subject to termination for the first offense."
.
.
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
..
,
The HP Superintendent explained that during outage, normal working hours for HP contract technicians was 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> per seven days including shift turnover time.
The licensee had not been able to secure as many contract HP technicians for the start of outage as budgeted and consequently had applied for an exemption to the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> per seven days as permitted by Administrative Procedure 20.3.
On April 20, 1987, the Station Manager approved a request from the HP Superintendent to permit contract HP technicians to work 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> per day, seven days a week for the first week of outage. On May 1, 1987, an extension was signed by the Station Manager to permit repetition of the 84 hour9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> work week for a second week.
Subsequent to this work hours returned to a normal 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> per seven days.
The inspector reviewed time sheets for selected contract HP technicians (including the alleger) and verified that in general 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts were being worked by these individuals.
Shift turnover sometines extended the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift from 15 minutes to an hour. This practice was permitted by Administrative Procedure 20.3.
The inspector also determined that on May 4, 1987, the day prior to the sleeping event, the alleger had worked a 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> shift.
The HP Superintendent stated that the licensee's HP technicians were aware that relief from the work schedule was available upon request.
However, he was less confident that the contract technicians were as knowledgeable.
The licensee also stated that they were prohibited from working an individual more than 16 hcurs in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, or more that 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period.
Finding The allegation was not substantiated in that a review of time sheets did not indicate that HP technicians were routinely working 18 to 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> per day. Virginia Power Company did restrict the alleger's access to the site in accordance with published Station policy.
12.
Inspector Followup Items (92701)
(Closed) Inspector Followup Item (50-338, 339/86-27-02) Corrective actions in response to Audit No. N-86-14 findings regarding the Process Control Program (PCP).
The inspector verified that corrective actions had been implemented as specified on Quality Assurance (QA) Audit Finding and Followup Forms, ADM-18.0, August 28, 1986, dated January 6, 1987, February 4,1987, February 27, 1987, and April 1,1987.
.
-
-
-.