U, S. NUCLEAP. REGULATORY COMMISSION OFFICE OF IFSPECTION AND ENFORCEMENT
'
REGION I
Report No.
50-333/79-12 Docket No.
50-333 License No.
DPR-59 Priority Category C
--
Licensee:
Power Authority of the State of New York P.O. Box 41 Lycoming, New York 13093 Facility Name:
James A. FitzPatrick Nuclear Power Plant Inspection At:
Scriba, New York Inspection Conducted:
August 27-30, 1979 9//7)79 Inspectors:
[.
'
R. A." McBrearty, Reactor Inspector
" Mate
-
date date Approved by:
/. $.
kW f S. E. Tripp! Chief, Engineering Support
/
dhte Section No. 1, RC&ES Branch Inspection Summary:
Inspection on August 27-30, 1979 (Report No. 50-333/79-12)
Areas Inspected:
Routine, unannounced inspection of inservice inspection data and licensee documentation associated with Licensee Event Report number 79-018/
03 L-0.
The inspection involved 24 inspector-hours onsite by one NRC regional based inspector.
Results:
Of the two areas inspected, no items of noncompliance were identified.
1464 289
.
Region I Form 167
'
(August 1979)
7912030 O.
.
.
.
.
DETAILS
-
1.
Persons Contacted Power Authority of the State of New York
- R. Baker, Maintenance Superintendent T. Butler, QC Inspector
- V. Childs, Assistant to Resident Manager
- M. C. Cosgrove, Site QA Engineer W. Fernandez, Assistant Maintenance Superintendent
- D.
Frangu, QA Engineer NDE Level III
- J. D. Leonard, Sr., Resident Manager
- R. Pasternak, Superintendent of Power A. V. Sorrentino, ISI Engineer, Nuclear Operations Crouse Nuclear Energy Services, Inc.
R. Reffitt, Assistant Superintendent
- Denotes those present at the exit interview.
2.
Inservice Inspection (ISI) Data Review and Evaluation a.
Scope of ISI Datt The examinations conducted during the 1978 refueling outage represent the completion of the first forty month inspection period of the first ten year interval. The examinations were governed by the ASME Boiler and Pressure Vessel Code,Section XI,1970 Edition and the facility Technical Specification.
Subsequent ISI activities will be ruled by ASME_ Code _ editions as required by 10 CFR 50.55a(g-).
The inspector reviewed data provided in the inservice inspection final report for the 1978 refueling outage submitted by Ebasco Ser-vices, Inc. to the licensee.
The inspector's review was done in order to ascertain that the data were complete and in compliance with the Technical Specification and the applicable ASME Code requirements.
No items of noncompliance were identified.
b.
NDE Data Review The inspector selected for review records associated with the follow-ing items:
1464 290
.
,
Recirculation System Inlet Nozzle N-2C, 12" diameter nozzle to
-
vessel weld Main Steam Outlet Nozzle N-3A, 24" diameter nozzle to vessel
-
.
Control Rod Drive (CRO) Return line Safe end N9-SE, dissimilar
-
metal weld Weld No. 3-03-950, CRD return line 3" diameter pipe to pipe weld
-
Weld No. 3-03-950C, CR0 return line 3" diameter pipe to ell
-
-
Weld No. 3-03-959, CRD return line 3" diameter pipe to valve weld
'
Weld No. 10-14-475, Core Spray System 10" diamter ell to ell
-
-
Weld No. 10-14-494, Core Spray System 10" diameter pipe to ell weld
-
Weld No. 24-29-543, Main Steam line 24" diameter pipe to valve weld Weld No. 24-29-606, Main Steam line 24" diameter pipe to pipe
-
weld Weld No. 6-12-1418, Reactor Water Cleanup (RWCU) System pipe
-
to valve dissimilar metal weld Main Steam Line Support No. H2924
-
The records for the above listed items were examined to ascertain compliance with applicable ASME Code requirements in the following areas:
-
Examination results and data sheets
-
Examination equipment data Calibration data sheets
-
Examination evaluation data
-
Extent of examination
-
1464 291 Disposition of findings
-
.
Reexamination after repair
-
Identification of NDE material such as penetrant, penetrant
-
' remover, couplant, etc.
Method, extent and technique of examination comply with licens-
-
ee's ISI program
-
Examination data are within the acceptance criteria as outlined in.the applicable code
-
-
Initial and final instrument calibration within acceptable limits
'
Examination data and recordable indications are properly
-
recorded
-
Evaluation of examination data performed by a Level II or Level III examiner The records associated with RWCU weld number 6-12-1418 and Main Steam Support H29247 document rejectable conditions which were revealed by liquid penetrant examination of the items.
Deficiency and Corrective Action Report (DCAR) number 010-78 and 012-78 res-pectively were issued by the licensee.
The inspector found that the reviewed data were complete and in compliance with the applicable requirements of Section XI of the ASME Code.
The inspector found also that the corrective action required by each DCAR was carried out and results of the reexamina-tion in each instance were documented.
No items of noncompliance were identified.
3.
Through Wall Pipe Crack Repair On March 21, 1979, the licensee informed an onsite NRC Region I inspector of a pipe crack in a 4 inch carbon steel pipe.
Licensee Event Report No.
79-018/03L-0 subsequently was submitted to NRC:I on April 17, 1979.
An attachment to the report describes a crack in the heat affected zone of the 4 inch condensate transfer line at the point where the line is welded to the RHR line.
The locati n of the break is outside of primary contain-ment and outside of both containment isolation valves associated with the RHR line.
The plant was in the Cold Shutdown Condition at the time of the discovery by plant personnel.
The following licensee records associated with repair and inspection of the line were reviewed by the inspector:
1464 292
.
Work Tracking Form dated 4/24/79
-
Maintenance Procedure No. MPT-14
-
-
Quality Control Inspection Report No. F79-94
,
Work' Request No. 970
-
-
Welding Procedure Specification No. WPS GTA-SMA-1.1-101
-
-
Procedure Qualification Record for above welding procedure Mipetic Particle Examination Report dated 4/20/79 for weld no.
-
r.143A s
-
Liquid Penetrant Examination Report dated 4/20/79 for weld no.
FW143A Radiographic Inspection Report No. 1 dated 4/24/79 for weld no.
-
FW143A Liquid Penetrant Examination Report dated 5/4/79 for weld no. S.W.B
-
Liquid Penetrant Examination Report dated 5/3/79 for weld no. S.W.C
-
-
Nondestructive Examination (NDE) Procedure No. NDEP 9.3, Revision 0,
" General Requirements for Radiographic Examination"
-
NDE Procedure No. NDEP 9.1-1, Revision 0, " Liquid Penetrant Examina-tion Procedure Visible Dye, Solvent Removable Method" NDE Procedure No. NDEP 9.2-2, Revision 0, " Magnetic Particle Examina-
-
tion Procedure, Yoke Type, Continuous, Dry Method"
-
Quality Control Receiving Inspection Report dated 4/19/79 Weld History Record for weld no. S.W.B and S.W.C
-
Weld Filler Metal Draw Slip for issue of material used in weld
-
no. S.W.8 and S.W.C
-
Welder qualification Records for the welder associated with the fabrication of weld no. F.W. 143A The inspector found that the welding was done by welders qualified in accordance with the applicable requirements of the ASME Code,Section IX, using a properly qualified welding procedure.
The records indicated that QC check points were observed and signed off by the QC inspector.
Required nondestructive examinations were done in accordance with approved procedures by NDE, Level I and Level II individuals.
1464 293
.
No items of noncomoliance were identified.
4.
Exit Interview The inspector met with licensee representatives (denoted in Paragraph 1)
at the conclusion of the inspection on August 30, 1979.
The inspector summarized the purpose and scope of the inspection and the findings.
.