IR 05000333/1979015

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-333/79-15 on 790911-13.No Noncompliance Noted.Major Areas Inspected:Organization & Operation, Measurement & Controls & Shipping & Receiving.Details Withheld (Ref 10CFR2.790)
ML19260C232
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/23/1979
From: Bissett P, Joyner J, Shaub E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19260C229 List:
References
50-333-79-15, NUDOCS 7912260095
Download: ML19260C232 (1)


Text

.

.

,

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

.

REGION I

.

Report No.

50-333/79-15 Docket No.50-33S License No.

DPR-59 Safeguards Group

Licensee:

Power Authority of the State of New York P.O. Box 41 Lycoming, New York 13093 Facility Name:

James A. FitzPatrick Nuclear Power Plant Inspection At:

Oswego, New York Inspection Conducted:

September 11-13, 1979 Date of Last Material Control and Accounting Inspection:

September 1, 1976 Type of Inspection:

Unannounced Material Controi & Accountir.q 44f

/8//3' 79 Inspectors:

,

' 11. B ' sett, Auditor

/ date

.

/s/tr/79

,t

_

E. T. Shaub, Safeguards Technician date date Approved by:

he, d

/d-23-79 pH~. Joy er,/ Chief, Nuclear Material Control date Sup Sedtion, Safeguards Branch Inspection Summary:

'

Areas Insoected:

Facility Organization and Operation. Measurement and Controls, Shipping and Receiving, Storage and Internal Contrc1, Inventory, and Records and Reports.

The inspection involved 45 inspector-hours onsite by two NRC inspectors and was begun during the regular hours.

Results:

The licensee was found to be in compliance with NRC requirements in all areas examined during the inspection.

1616 098.

Region I Form 166 7912260 m

(August 1979)