IR 05000323/1985006
| ML16341D248 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/30/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| References | |
| NUDOCS 8505060175 | |
| Download: ML16341D248 (2) | |
Text
gpss 30 1985 Docket No. 50-323 Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 Attention:
J.
D. Shiffer, Vice President Nuclear Power Generation, Iicensing Gentlemen:
Thank you for your letter dated April 4, 1985, informing us of the steps you have taken to correct the items which we brought to your attention in our letter dated March 5, 1985.
Your corrective actions will be verified during a
future inspection.
Your cooperation with us is appreciated.
Sincerely, ps/
D. F. Kirsch, Acting Director Division of Reactor Safety and Projects cc:
Dick Vollmer, NRR P.
A. Crane, PG&E S.
D. Skidmore, PG&E R.
C. Thornberry, (Diablo Canyon)
C.
M. Seward, (Diablo Canyon)
R. Weinberg, (Diablo Canyon)
State of CA (Johnson)
bcc:
RSB/Document Control Desk (RIDS)
Hr. J. Hartin Resident Inspector RV (jg RDodds:dh 4/>9 /85 DKirsch 4/pP /85 8505060175 850430 PDR ADOCK 05000323i'
PDR j
pg~ /
l I
'k 4,
I I
1