IR 05000275/1985022

From kanterella
Jump to navigation Jump to search
Insp Repts 50-275/85-22 & 50-323/85-15 on 850408-12 & 22-26. No Violation or Deviation Noted.Major Areas Inspected: Implementation of Fire Protection Program
ML17083B602
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/15/1985
From: Dodds R, Qualls P, Thomas Young
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML17083B601 List:
References
50-275-85-22, 50-323-85-15, NUDOCS 8506060583
Download: ML17083B602 (16)


Text

U. S.

NUCLEAR REGULATORY COt'MISSION

REGION V

Report Nos.

Docket Nos.

Licensee:

Facility Name:

50-275/85-22, 50-323/85-15 50-275 and 50-323 Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 Diablo Canyon Units 1 and

Inspection at:

San Luis Obispo County, California Inspection conducted:

April 8-12 and 22-26, 1985

7('.

squalls, Reactor Inspector

/><<~jI'l yyg~-

Date Signed Approved By:

. You g, Jr., Chief, Engineering Section R. Dodds, Chief, Reactor Projects Section

r /I'z Date Signed D

e S gned Summary:

Ins ection on A ril 8-12 and 22-26 1985 (Re ort 50-275/85-22 8 50-323/85-15)

Areas Ins ected:

Unannounced inspection by a regional inspector of the implementation of the Diablo Canyon nuclear plant fire protection program.

The inspection involved 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br /> onsite by one NRC inspector.

Results:

Of the areas examined no violations or deviations were identified.

8506060583 850515 PDR ADQCK 05000275

PDR

l

DETAILS 1.

Persons Contacted

"'J. Gisclon,

"'R. Fisher, NPO

"R. Kohout, Station Emergency Services Supervisor C. Johnson, Station Fire Marshall J. McClintock, Station Fire Protection Engineer B. Panero, PGGE Corporate Fire Protection Engineer N. Liew, Power Production Engineer J.

Sexton, Operations Supervisor J.

Hansen, PGSE Quality Assurance/Quality Control M. Michaels, Units 1 and 2 Construction Piping Lead Engineer M. Tenzca, Construction FPE T. Pierce, PGSE Quality Assurance/Quality Control P. Lucas, Bechtel Fire Watch Specialist

"-R. Thornberry, PGSE Plant Manager

"Indicates those individuals attending the exit interview on April 26, 1985.

In addition to the individuals noted above, the inspector interviewed other members of the licensee's and contractor's staff.

2.

Documents Reviewed a.

Surveillance Procedure M-70 Inspection of Fire Barrier Penetrations b.

Emergency Procedures R-6 Rev.

M-6 Rev.

M-10 Rev.

Radiological Fire Non Radiological Fire Fire Protection of Safe Shutdown Equipment c.

Operating Procedure AP-8 Control Room Inaccessibility d.

Administrative Procedures B-13 Rev.

Qualification and Training Requirements of Personnel Specifically Concerned with Fire Loss Prevention B-51 Rev.

Industrial Safety - First Aid and Fire Protection Training C-10 Rev.

Housekeeping

- General C-10S1 Rev.'1 SISIP Review of Housekeeping

C-113 Rev.

Fire System Impairment A-13 Rev.

Plant Organization for Fire Loss Prevention C-13 Rev.

Fire Loss Prevention C-13S1 Rev.

11 Diablo Canyon Melding and Open Flame Permit System C-13S2 Rev.

'1 Storage and Handling of Combustible Materials e.

Design Criteria Memo No. M-10, Rev.

f.

Design Criteria Memo No. H-5, Rev.

g.

PG&E QA Manual Policy Section II Supplement

h.

Pullman SPEC No. 8711, ESD-265, Quality Assurance Requirements for the Fire Protection System.

i.

PG&E Letter to Bechtel dated December 13, 1984 j.

NRC Memorandum Johnston to Novak, dated February 12, 1985 k.

Diablo Canyon SSER

l.

QA Audit No.

83068P dated July 29, 1983 m.'A Audit No.

84238P dated September 14, 1984 n.

Diablo Canyon Fire Protection Review to

CFR 50 Appendix R for Unit 2 dated December 6,

1984 o.

PG&E 'Letter No. DCL-85-092 dated March 5, 1985 p.

PG&E Drawing No. 501001 Rev.

q.

PG&E Drawing No. 501004 Rev.

DCO-EP-17091 s.

PG&E Letter No. DCL-85-159

3.

Licensee Action on Previous Findin s a.

(Closed)

(50-275/85-05-02'0-323/85-06-01)

Weldin Permit Listin The licensee is now listing current welding permits in his computer.

The listing is available on a

CRT when desired by the control room operators.

This item is closed.

b.

(Closed)

(50-275/85-05-03)

Anti-C Stora e

The location, loading and storage method of anti-contamination clothing in lockers in the plant has been evaluated, modified where necessary and approved by the Station Fire Marshall in accordance with DCNPP procedures.

This item is closed.

c.

(Closed)

(50-275/85-05-04.

50-323/85-06-02)

Housekee in The housekeeping procedures for DCNPP Units 1 and 2 appear to meet the requirements of Branch Technical Position CMEB 9.5.1 Section C.2.

Housekeeping in the computer rooms and in the plants was adequate.

This item is closed.

d.

(Closed)

(50-275/85-05-05)

SSPS Room Ceilin Tile The licensee is now controlling access to the SSPS computer room with a key controlled by the Shift Manager.

This action appears adequate to prevent uncontrolled opening of the ceiling tile trap door.

This item is closed.

e.

(Closed)

(50-323/85-06-03)

Penetration Seals The licensee had completed this walkdown inspection of all penetration= seals and had identified over 1300 deficiencies.

These deficiencies were in the process of being corrected prior to fuel load.

The inspector noted only one deficiency during an extensive penetration inspection.

The deficiency had already, been identified by the licensee and was scheduled for correction.

This item is closed.

No violations or deviations were identified.

4.

Administrative Controls The inspector reViewed the Diablo Canyon plant procedures which implement the licensee's fire protection program.

The procedures were reviewed to ensure compliance to the Branch Technical Position, BTP CMEB 9.5.1 Appendix A.

Of the areas examined, no discrepancies were noted.

No violations or deviations were identified.

5.

Fire Bri ade and Shift Mannin The inspector reviewed the fire brigade composition and training status.

No deficiencies were note '4

\\

The inspector also met with licensee management personnel and discussed the

CFR 50 Appendix R Section III.L.4 requirements to be able to man the fire brigade and shutdown the plant concurrently.

This item is an integral part of an Appendix R team inspection and although not a

followup item, it will be examined by NRC systems experts in detail at that time.

No violations or deviations were identified.

Fire Protection Pro ram Administration The inspector reviewed the qualifications and experience of the personnel designated for implementation of the Unit 2 fire protection program.

The personnel in the organization appear to meet the qualifications specified in BTP C51EB 9.5.1 Section C.l.a.

No violations or deviations were identified.

liaintenance Ins ection and Tests The inspector reviewed several surveillance procedures to ensure that the proper fire protection equipment was listed on the procedures and that the inspection frequency met the Technical Specification inspection frequency.

Of the areas inspected no deficiencies were noted.

The inspector examined surveillance procedure M-70, Inspection of Fire Barrier Penetrations, in detail.

The procedure appeared to meet the applicable NFPA Code and Technical Specification requirements.

During the plant walkthrough the inspector examined various items of fire protection equipment.

All equipment appeared to be well maintained and in a fully operable condition.

Fire extinguisher inspection tags were current.

Of the areas examined no discrepancies were noted.

No violations or deviations were identified.

Review of Licensee A Audit Findin s The two most recent published equality Assurance annual audits were examined.

In addition, the inspector discussed with licensee personnel the most recent audit which has not had sufficient time for final issuing.

The audit findings in all cases examined appeared to have been prompted and adequately addressed.

Of the areas examined no discrepancies were noted.

No violations or deviations were identifie Emer enc Li htin The licensee had committed to have completed his walkdown and verification of the adequacy of the emergency lighting required for safe shutdown in Unit 2 prior to fuel loading.

The walkdown and any necessary modifications have been satisfactorily completed.

No violations or deviations were identified.

10.

Reactor Coolant Pum Lube Oil Collection S stem The reactor coolant pump lube oil collection system appears to meet the licensee commitments in the December 1984, Appendix R submittal and exemption requests.

No method was apparent to verify that the tank is maintained empty during operation.

The licensee committed to modify a procedure to ensure that, prior to "closing out" the containment that the tanks are drained.

This will be examined at a later inspection (50-323/85-15-01)

(Open).

No violations or deviations were identified.

11.

Fire Dam er Testin The licensee had committed to complete fire damper modification and testing prior to loading fuel in Unit 2.

The modification and testing are complete.

No violations or deviations were identified.

12.

Verification of "As-Builts" The inspector examined selected segments of the Unit 2 sprinkler, standpipe and cardox systems, to ensure that the plant drawings reflected the "As-Built" conditions of the plant.

Of the areas examined no discrepancies were noted.

No violations or deviations were identified.

13.

(}ualit Assurance The inspector examined licensee's program for quality assurance for the systems that have been accepted by the plant from construction and the construction quality assurance program.

Both programs appeared to meet the program. requirements specified in BTP 9.5.1 Appendix A.

Of the areas examined no discrepancies were identified.

No violations or deviations were identified.

The inspector conducted an in-depth tour of Unit 2, with the following result gk(

a.

Fire Doors The inspector observed a large number of fire doors which were not operable.

The plant already had the proper Technical Specification compensatory measures in place for the inoperable doors.

Licensee personnel are evaluating the fire door problem to determine a method to reduce the number of inoperable doors.

This item will be examined at a later inspection (50-323/85-15-02)

(Open).

b.

Hot Work The inspector examined several areas in Unit 2 where welding or grinding was being performed.

In all cases the proper permit was signed and posted with a fire watch stationed.

c.

Fire Protection E ui ment Fire hoses, extinguishers, brigade turn out equipment and cardox systems inside of the units were examined.

The equipment appeared to be in good condition and well maintained.

No storage problems were identified.

In Unit 1 and most of Unit 2 housekeeping appeared adequate.

No improper cleaning materials or solvent or untreated wood scaffolding was observed.

No violations or deviations were observed.

15.

Follow-u of Licensee A

endix R Deviation Commitments for Unit 2 On December 6,

1984, the licensee submitted to NRR for review a document titled "Diablo Canyon Fire Protection Review to

CFR 50 Appendix R for Unit 2."

In this submittal, the licensee described a number of fire areas and requested that these areas have some specific exemption from sections of Appendix R,of

CFR 50.

The inspector examined the areas listed below to ensure that the descriptions were adequate and that any commitments made in the submittal were completed.

a

~

b.

c

~

d.

e.f.

g h.l.

RHR pump and heat exchanger rooms charging pump rooms auxiliary pump areas auxiliary seawater pump rooms shower, locker and access control area hot shutdown pa'nel and non vital switchgear room diesel generator rooms and corridor component cooling water heat exchanger area penetration area

In addition, the inspector verified that the fire doors that are not labeled meet one of the criteria listed for acceptance in SSER 23 for Unit 1.

No violations or deviations were identified.

16.

Exit Interview An exit meeting was held with members of the plant staff on April 26, 1985.

The items listed in this report were discussed at that'ime.