April 16, 2020
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000275/2020001 AND 05000323/2020001
Dear Mr. Welsch:
On March 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2. On April 9, 2020, the NRC inspectors discussed the results of this inspection with Ms. Paula Gerfen, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Diablo Canyon Power Plant.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Diablo Canyon Power Plant. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects
Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000275 and 05000323
License Numbers:
Report Numbers:
05000275/2020001 and 05000323/2020001
Enterprise Identifier: I-2020-001-0009
Licensee:
Pacific Gas & Electric Company
Facility:
Diablo Canyon Power Plant, Units 1 and 2
Location:
Avila Beach, California
Inspection Dates:
January 1, 2020 to March 31, 2020
Inspectors:
M. Chambers, Physical Security Inspector
M. Doyle, Operations Engineer
N. Hernandez, Operations Engineer
R. Kopriva, Senior Reactor Inspector
L. Merker, Acting Senior Resident Inspector
C. Newport, Senior Resident Inspector
J. Reynoso, Resident Inspector
W. Smith, Health Physicist
F. Thomas, Reactor Inspector
Approved By:
Jeffrey E. Josey, Chief
Reactor Projects Branch A
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
Failure to Follow Procedure Results in Inoperable Containment Spray Systems Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000275,05000323/2020001-01 Open/Closed
[H.5] - Work Management 71153 The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,
Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for failure to follow the requirements of procedure OP L-6, "Cold Shutdown/Refueling." Specifically, while preparing for a reactor plant mode transition, the licensee inadvertently rendered both trains of containment spray inoperable in Mode 4, a mode of operation with both containment spray trains required to be operable.
Additional Tracking Items
Type Issue Number Title Report Section Status LER 05000323/2019-001-00 LER 2019-001-00 for Diablo Canyon Power Plant, Unit 2,
Containment Spray Inoperable in Mode 4.
71153 Closed
PLANT STATUS
Unit 1 operated at or near rated thermal power for the entire inspection period.
Unit 2 began the inspection period at full power. On February 13, 2020, Unit 2 was taken off line by controlled shutdown due to an equipment failure resulting in an unplanned technical specification entry. Unit 2 returned to full power on February 17, 2020, and remained at or near rated thermal power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. From January 1 - March 19, 2020, the inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week and during that time conducted plant status activities as described in IMC 2515, Appendix D; and observed risk significant activities when warranted. In addition, resident and regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In the cases where it was determined the objectives and requirements could not be performed remotely, management elected to postpone and reschedule the inspection to a later date.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather due to high winds on January 7, 2020.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1, turbine-driven auxiliary feedwater pump 1-1 on January 16, 2020
- (2) Units 1 and 2, control room ventilation system on January 17, 2020
- (3) Units 1 and 2, reactor trip breakers and motor generator set on February 3, 2020
- (4) Unit 2, auxiliary feedwater and condensate system on February 4, 2020
- (5) Units 1 and 2, auxiliary saltwater trains A and B on February 5, 2020
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Units 1 and 2, turbine building 85-foot elevation on January 15, 2020
- (2) Units 1 and 2, 12 kV electrical switchgear rooms on February 3, 2020
- (3) Units 1 and 2, auxiliary building rod control rooms 115-foot elevation on February 3, 2020
- (4) Unit 2, auxiliary building battery rooms 115-foot elevation on February 12, 2020
- (5) Unit 1, auxiliary building battery rooms 115-foot elevation on March 12, 2020
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Units 1 and 2, auxiliary feedwater pump rooms on February 13, 2020
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
The inspectors observed and evaluated licensed operator performance in the Control Room during the following activities:
- (1) Unit 2, auxiliary feedwater pump 2-1 operation and main generator voltage regulator inconsistent function on February 11, 2020 Unit 2, return to power following unplanned technical specification required shutdown for control rod out of alignment on February 15, 2020 Units 1 and 2, high risk land management prescribed burn on February 29, 2020
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator requalification classroom training on the auxiliary feedwater system on February 6, 2020.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Unit 2, main feedwater regulating valve FCV-510 on January 4, 2020
- (2) Units 1 and 2, control room and auxiliary building ventilation system on March 10, 2020
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 2, vital battery charger 2-1 cleaning and maintenance on January 13, 2020
- (2) Unit 1, emergency diesel generator 1-1 emergent lube oil heat exchanger oil repairs on January 23-24, 2020
- (3) Unit 1, auxiliary feedwater valve LCV-110 plant computer analog output card troubleshooting on February 19, 2020
- (4) Units 1 and 2, wildfire risk management activities on February 29, 2020
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 1, emergency diesel generator 1-1 heat exchanger lube oil leak on January 7, 2019
- (2) Unit 2, steam generator 2-1 feedwater regulating valve FCV-510 flow oscillations on January 15, 2020
- (3) Unit 2, nitrogen leak inside containment on January 26, 2020
- (4) Unit 1, condensate storage tank loose resin on February 6, 2020
- (5) Unit 1, plant computer system analog output circuit card safety-related classification on February 13, 2020
- (6) Unit 2, emergency diesel generator 2-3 turbo air start pipe through wall leak on March 12, 2020
71111.17T - Evaluations of Changes, Tests, and Experiments Sample Selection (IP Section 02.01)
The inspectors reviewed the following evaluations, screenings, and/or applicability determinations for Title 10 of the Code of Federal Regulations (10 CFR) 50.59 from May 9-12, 2020:
- (1) Licensing Basis Impact Evaluation (LBIE) Screen S-2017-004, Auxiliary Salt Water ASW2-2 Vault Room Conduit Replacement
- (2) LBIE Screen S-2017-016, Partial Revision Calculation MP-6051
- (3) LBIE Screen S-2017-024, Replace Pressurizer Struts with Snubber - Unit 2
- (4) LBIE Screen S-2019-134, Task No. 134 Heating, Ventilation and Air Conditioning HVAC-83-14
- (5) LBIE Screen S-2018-103, Task No. 103 Unit 2, Emergency Diesel Generator Governor Control Upgrade
- (6) LBIE Screen S-2018-041, Task No. 41 DA Notification 50941685 Control Room Envelope (CRE) Floor Drain
- (7) LBIE Screen S-2017-107, Pipe Support Repair
- (8) LBIE Evaluation E-2018-002, Unit 1, Emergency Core Cooling System Valve Stem Mounted Limit Switch Interlocks
- (9) LBIE Evaluation E-2017-005, Unit 1, Hydrogen Recombiner Electrical Penetration Protection
- (10) LBIE Screen S-2017-011, Unit 2, Vital Battery and Battery Charger Unfused Non-Class 1E Ammeter Circuits modification
- (11) LBIE Screen S-2017-015, DCP 1*25408, Unit 1 Nuclear Instrumentation System (NIS) Sensitivity Kits
- (12) LBIE Screen S-2017-072, Temporary Modification Plant service Air Dryers (PAD) 03 04 Temporary Power
- (13) LBIE Screen S-2018-032, Task No. 32 Temporary Modification 60108251 Unit 2 480 Volt Bus G Indication
- (14) LBIE Screen S-2018-081, 91010-8219-AR_PK05-25u1r19e07-03-19, Pressurizer Relief Tank normal operating level is being lowered from 84 percent to a range of 60 percent-84 percent
- (15) LBIE Screen S-2019-014, Task No. 14 LBIE DA 50823711 Engineered Safety Feature Delays
- (16) LBIE Evaluation E-2017-019, UFSAR 3.2 for Class Breaks
- (17) LBIE Evaluation E-2018-009, 480 Volt Switchgear Room Tornado Impacts
- (18) LBIE Evaluation E-2018-010, DDP 1000025448, High Energy Line Break Analysis on 4 kV Switch Gear
- (19) LBIE Evaluation E-2019-003, FSAR Engineered Safeguard Feature Non-LOOP Delays
- (20) LBIE Evaluation 2017-004, DCN 2*1689, Unit 2 Hydrogen Recombiner Electrical Penetration Protection
- (21) LBIE Evaluation 2017-023, Gas Decay Tank Rupture
- (22) LBIE Evaluation 2017-026, Liquid Holdup Tank Rupture
- (23) LBIE Evaluation 2018-001, Unit 2 Emergency Core Cooling System Valve Stem Mounted Limit Switch Interlocks, DCN-2000001823
- (24) LBIE Screen OP _O -22u3r07e03-27-17, Motor operated valves (MOVs) that may need local manual operation with motor contactors during emergency situations.
- (25) LBIE Screen, OP B-3AIVu 1 r02e04-29-1 7, Venting pressure between the Safety Injection (SI) Pump discharge check valves and the Reactor Coolant System (RCS)loop injection check valves.
- (26) LBIE Screen S-2017-030, Fisher regulators M98H is being evaluated to replace 98H regulators for PCV-410/411 in the Diesel Fuel Oil System.
- (27) LBIE Screen STP P-AFW-A 1 1 u 1 r1 2-OTSC-06-25 - 1 7-S8B2, turbine-driven auxiliary feedwater (AFW) pump test procedure that performs the comprehensive flow surveillance be revised to allow a widened pump testing speed band.
- (28) LBIE Screen S-2017-108, Modification installs a structural weld overlay (SWOL) on the existing weld containing the flaw at weld WIB-245.
- (29) LBIE Screen S-2017-008, Unit 1 ICW Head Tank Nitrogen Cover Gas as permanent plant equipment and provides a more permanent tank lid hold-down device.
- (30) LBIE Screen S-2017-129, The proposed activity will remove the interlocks associated with the stem-mounted Namco external limit switches.
- (31) LBIE Screen 90120-1090-0P D-1 Vu 1 r25e05-23-18, Deleted closing of the FW-1 21 Auxiliary Feedwater Pump suction valve when aligned to the Condensate Storage Tank.
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Unit 2, pressurizer relief tank operating procedure modifications on January 6, 2020
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
- (1) Unit 2, Eagle 21 rack 4 board replacement on January 9, 2020
- (2) Unit 1, control room air conditioner compressor CP-36 and condenser overhaul on January 21, 2020
- (3) Unit 1, emergency diesel generator 1-1 heat exchanger repair on January 23, 2020
- (4) Unit 1, condensate storage tank cleaning and inspection on February 4, 2020
- (5) Units 1 and 2, control room ventilation backdraft damper BD-67 repairs on March 9, 2020
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
- (1) Unit 2, vital battery charger 2-31 test per procedure STP M-12B on January 9, 2020
- (2) Unit 2, main generator reactive power capability test per procedure TP TO-19005 on January 14, 2020
- (3) Unit 1, emergency diesel generator 1-1 monthly surveillance test per procedure STP M-9A1 on January 21, 2020
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) Unit 2, component cooling water fill check valve MU-2-971 in-service test per procedure STP V-18S on March 5, 2020
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated an emergency preparedness drill on March 3,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
- (1) Unit 1 (01/01/2019-12/31/2019)
- (2) Unit 2 (01/01/2019-12/31/2019)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (2 Samples)
- (1) Unit 1 (01/01/2019-12/31/2019)
- (2) Unit 2 (01/01/2019-12/31/2019)
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)
- (1) Unit 1 (01/01/2019-12/31/2019)
- (2) Unit 2 (01/01/2019-12/31/2019)
71152 - Problem Identification and Resolution
Semiannual Trend Review (IP Section 02.02) (1 Sample)
- (1) The inspectors reviewed the licensees corrective action program for trends that might be indicative of a more significant safety issue. The inspectors review was focused on fire damper issues during the period from January 1, 2019, to March 11, 2020.
Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Corrective actions associated with steam header pressure control and main steam safety valve RV-58 lifting while rolling main turbine generator on December 17, 2019
- (2) Corrective actions associated with Units 1 and 2, auxiliary building ventilation system damper and supply fan failures on February 26, 2020
71153 - Follow-up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)
The inspectors evaluated the following licensee event reports (LERs):
- (1) LER 05000323/2019-001-00, Unit 2, Containment Spray Inoperable in Mode 4 (ADAMS Accession No. ML20029E862). The circumstances surrounding this LER and an associated non-cited violation are documented in the Inspection Results section of this report.
Personnel Performance (IP Section 03.03) (1 Sample)
- (1) The inspectors evaluated the licensee's performance during a Unit 2, controlled shutdown required by technical specifications due to control rod misalignment on February 13,
OTHER ACTIVITIES
- TEMPORARY INSTRUCTION, INFREQUENT, AND ABNORMAL Evaluation of Diablo Canyon Power Plant Safety Condition in Light of Financial Conditions Because Pacific Gas & Electric Corporation, and its subsidiary, Pacific Gas & Electric Company (the licensee) was under bankruptcy protection/reorganization during the inspection period, NRC Region IV conducted special reviews of processes at Diablo Canyon Power Plant. Using the flexibilities in the baseline inspection program, the inspectors evaluated several aspects of the licensees operations to determine whether the financial condition of the licensee impacted plant safety. The factors reviewed during this period included:
- (1) impact on staffing,
- (2) corrective maintenance backlog,
- (3) changes to the planned maintenance schedule,
- (4) corrective action program implementation, and
- (5) any reduction in outage scope, including risk-significant modifications. Considering the licensees financial difficulties, the inspectors verified that licensee personnel continued to identify problems at an appropriate threshold and enter these problems into the corrective action program for resolution. The inspectors also verified that the licensee continued to develop and implement corrective actions commensurate with the significance of the problems identified.
The special review of processes at Diablo Canyon Power Plant included continuous reviews by the resident inspectors, as well as the specialist-led baseline inspections completed during the inspection period which are documented in this report. During this period, the inspectors did not identify any indications that the licensees financial circumstances were adversely affecting plant performance and safety.
INSPECTION RESULTS
Failure to Follow Procedure Results in Inoperable Containment Spray Systems Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity
Green NCV 05000323/2020001-01 Open
[H.5] - Work Management 71153 The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for failure to follow the requirements of procedure OP L-6, "Cold Shutdown/Refueling." Specifically, while preparing for a reactor plant mode transition, the licensee inadvertently rendered both trains of containment spray inoperable in Mode 4, a mode of operation with both containment spray trains required to be operable.
Description:
On November 30, 2019, at the start of Unit 2, Refueling Outage 21, the licensee began to transition the unit from Mode 4 to Mode 5 in accordance with OP L-6, Cold Shutdown/Refueling. While preparing for this transition, personnel from operations issued instructions to disable the containment spray pumps while the plant was still in Mode 4, a task that is required by OP L-6 only after the plant reaches Mode 5. This rendered both trains of containment spray inoperable as Technical Specification (TS) 3.6.6, "Containment Spray and Cooling Systems," requires two containment spray trains to be operable while in Modes 1, 2, 3, and 4. Approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> later, operations personnel identified that the two containment spray trains were inoperable while still in Mode 4. Operations personnel subsequently entered the applicable TS limiting condition for operation (LCO) 3.0.3 which states, in part, that when an LCO is not met, action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit in Mode 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />. Operations personnel restored power to the containment spray pumps, returned both trains of containment spray to operable status within the 37-hour requirement to place the unit in Mode 5, and exited the applicable TS LCOs.
Corrective Actions: Operations personnel returned both trains of containment spray to operable status and entered the issue into the corrective action program.
Corrective Action References: Notification 51057622
Performance Assessment:
Performance Deficiency: The inspectors determined that the licensee's failure to follow OP L-6, "Cold Shutdown/Refueling," by rendering both trains of containment spray inoperable while in a Mode of operation with containment spray required to be operable, was a performance deficiency.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Human Performance attribute of the Barrier Integrity cornerstone and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. Specifically, the licensee rendered both trains of containment spray inoperable while in Mode 4, a mode of operation in which both containment spray trains are required to be operable.
Significance: The inspectors assessed the significance of the finding using Appendix G, Shutdown Safety SDP. The inspectors determined the finding to be of very low safety significance (Green) because the finding did not degrade the ability to close or isolate the containment; the physical integrity of reactor containment; or involve an actual reduction in function of hydrogen control for a BWR Mark III containment, a PWR ice condenser containment, or an AP1000 containment.
Cross-Cutting Aspect: H.5 - Work Management: The organization implements a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process includes the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities.
Enforcement:
Violation: Title 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," states, in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings. Section 6.1.3 of OP L-6, "Cold Shutdown/Refueling," Revision 29, an activity affecting quality requires, in part, that containment spray pumps and control power are disabled after the unit reaches Mode 5 and before reaching Mode 6. Contrary to the above, on November 30, 2019, in anticipation of Mode 5 entry, the licensee inadvertently rendered both trains of containment spray inoperable while still in Mode 4, a mode of operation in which both containment spray pumps are required to be operable.
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On March 12, 2020, the inspectors presented the Evaluations of Changes, Tests and Experiments inspection results to Mr. M. Hayes, Director, Learning Services, and other members of the licensee staff.
- On April 9, 2020, the inspectors presented the integrated inspection results to Ms. P. Gerfen, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Notifications
51061491, 51061412
Procedures
CP M-16
Severe Weather
Corrective Action
Documents
Notifications
51051094, 51034153, 51041762, 51062395
Drawings
106703
Sheet 3
106704
Sheet 4
106723
Control Room Ventilation HVAC - Unit 1
133
107723
Control Room Ventilation HVAC - Unit 2
105
Procedures
OP D-1:II
Auxiliary Feedwater System - Alignment Verification for Plant
Startup
35B
OP H-5:II
Control Room Ventilation System - Alignment Verification
Corrective Action
Documents
Notifications
51047792, 50937061, 51065375, 51065372, 50914543,
51069005, 51069558
Drawings
111805
RCA and H-Block Elev 115
111805
Radiological Control Area (RCA) & H Block Elev. 115
111805 Sheet 60
Fire Preplan Unit 2 Radiological Control Area 115'
111805 Sheets
and 60
Turbine Building Elev. 115 ft
111805 TB-3
Fire Pre-Plan Drawing Turbine Building 85-foot elev. Sheet
111805 TB-5
Fire Pre-Plan Drawing Turbine Building 85-foot elev. Sheet
515221
Operational Requirement for Important to Safety Doors
663389
Hollow Door Vendor Drawing
RA-9
Fire Preplan Unit 1 Radiological Control Area 115'
Miscellaneous
SAP Calc. No.
9000041689-002-
NFPA 805 Design Basis Documents Units 1 and 2
TCP #12520
Transient Combustible Permit, 480 V temp power
2/22/2019
Work Orders
68058246, 64138828
Corrective Action
Notifications
50632943, 50636857, 50826609, 50591129
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Miscellaneous
DCM No. T-12
Diablo Canyon Power Plant, Units 1 & 2, Design Criteria
Memorandum T-12 Pipe Break (HELB/MELB), Flooding, and
Missiles
71111.11Q Corrective Action
Documents
Notifications
51066561, 51068223, 51065923, 51066632, 51066599,
50531403, 51058992, 51059240, 51057622, 51068868,
51066670, 51066564, 51066758, 51066640, 51069557,
51068235, 51068180, 51066545
Procedures
AD7.DC8
Work Planning
AR PK05-08
RCS Valves Stem Leakage
CF2.DC1
Configuration Management Plan for the Operator Training
Simulator
OP1.DC10
Conduct of Operations
OP1.DC31
Dissemination of Operations Information
STP P-AFW-21
Routine Surveillance Test of Turbine-Driven Auxiliary
Feedwater Pump 20-1
STP R-1A
Routine Control Rod Exercise
Work Orders
60120360, 60126079, 68055020
Corrective Action
Documents
Notification
51060172, 50980489, 51048745, 51048849, 51047760,
50997012, 51063460
Drawings
108036s4D
Multivariable Instrument Systems
Miscellaneous
DCM No. S-3C
Main Feedwater & Steam Dump Control Systems
PC-23B-01
Worksheet
Main Auxiliary Building HVAC Maintenance Rule
Performance Criteria
STP-V3P1
Valve Stroke Times for FCV-510
Procedures
OM7.ID12
STP M-6A
Routine Surveillance Testing of Control Room Ventilation
System
Corrective Action
Documents
Notifications
51034877, 51063460, 51050796, 50984446, 51066561,
51066728, 51048684, 51032369
Procedures
AD7.DC6
On-Line Maintenance Risk Management
AD7.ID15
On Line Maintenance Outage Window Execution
AD7.ID4
Assessment of integrated Risk
AWP WM-001
Integrated Risk Supplement Classification Guidance
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
B-40
Operations Response to Wildfire
CS1.ID15
Cyber Security Configuration Management
OP J-6B:IX
Diesel Generator Extended On-Line Maintenance
OP O-36
Protected Equipment Posting
Work Orders
64129724, 60126079
Corrective Action
Documents
Notifications
51065420, 51066561, 51053146, 51053498, 51063165,
51063163, 51048609, 50985428, 51060172, 51061381,
51024543, 50985953, 50931403, 50828966, 51060220,
51063968, 51063831, 51069677
Drawings
107709
Mechanical Piping Gaseous System
108021-4B
Turbo Charger Air Assist System 2-3
Procedures
STP M-21-ENG.1
Diesel Engine Generator Inspection (Every Refueling
Outage)
STP M-9A1
Diesel Engine Generator 1-1 Routine Surveillance Test
Work Orders
60126079, 60123682, 60124189, 60111921, 64137989
Calculations
14078110-MR-
001
PG&E Design Class I Component Class Break Report
2/16/2016
SAP Calculation
No. :
9000033734,
Legacy No. 364-
Unit 2 Electrical Penetration Protection Calculation.
6B
SAP Calculation
No. 9000012062,
Legacy No. RA-
93-9
Gas Decay Tank/Gaseous Radwaste System
WECTEC
14078110-C-M-
00003
Site Boundary Doses for a Gas Decay Tank (GDT) Rupture.
Corrective Action
Documents
50870357, 50873211, 50881494, 50939612, 50946995,
50969368, 50969621, 51005934, 51005938, 51034727,
51053313, 51063468
Corrective Action
Documents
51069457, 51069490, 51069602, 51069620
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Resulting from
Inspection
Drawings
2003
Diablo Canyon Power Plant - PG&E Co. - Feedwater
System
2008
Diablo Canyon Power Plant - PG&E Co., Chemical &
Volume Control System, Sheet 5B
116
2008
Diablo Canyon Power Plant - PG&E Co., Chemical &
Volume Control System, Sheet 9
2
2013
Diablo Canyon Power Plant - PG&E Co., Spend Fuel Pit
Cooling System, Sheet 2
2016
Diablo Canyon Power Plant - PG&E Co., Make-Up Water
System, Sheet 18
2016
Diablo Canyon Power Plant - PG&E Co., Make-Up Water
System, Sheet 16
2017
Diablo Canyon Power Plant - PG&E Co. Saltwater System,
Sheet 3B
2021
Diablo Canyon Power Plant - PG&E Co., Diesel Engine-
Generator Associated Systems, Sheet 7B
2021
Diablo Canyon Power Plant - PG&E Co., Diesel Engine-
Generator Associated Systems, Sheet 7
2021
Diablo Canyon Power Plant - PG&E Co., Diesel Engine-
Generator Associated Systems, Sheet 7A
106708
PG&E Co. Sheet 15A - Chemical & Volume Control System
OVID
133
106708
PG&E Co. Sheet 9 - Chemical & Volume Control System
OVID
150
106713
PG&E Co. Sheet 2 - Spend Fuel Pit Cooling System OVID
106716
PG&E Co. Sheet 18 - Make-Up Water System OVID
174
106716
PG&E Co. Sheet 16 - Make-Up Water System OVID
186
106717
PG&E Co. Sheet 8 - Saltwater System OVID
209
106717
PG&E Co. Sheet 7 - Saltwater System OVID
198
106721
PG&E Co. Sheet 16 - Diesel Engine-Generator Associated
Systems OVID
106721
PG&E Co. Sheet 6 - Diesel Engine-Generator Associated
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Systems OVID
441368
Electrical Schematic Diagram 125 Volt D. C. System
Engineering
Changes
DCN 2000001689 Replace the 3 existing Shawmut A23X125 fuses in the
Hydrogen Recombiner Power Supply Panel with Shawmut
A50P125-4 and Install 3 more redundant A50P125-4 fuses
in series.
DDN 2000001912 Design Change Notice - 4kV Switchgear Room Ventilation
System Modification (Unit 1)
11/28/2018
DDN 2000001913 Design Change Notice - This design change will revise the
licensing basis to explicitly credit manual operator actions to
ensure the cooling requirement for the electrical equipment
served by the 480VAC Switchgear Room and 125VDC
Inverter Room Ventilation System is met following a design
basis tornado that disables the ventilation system.
11/28/2018
DDN 2000001927 Design Change Notice - This design change will revise the
licensing basis to explicitly credit manual operator actions to
ensure the cooling requirement for the electrical equipment
served by the 480VAC Switchgear Room and 125VDC
Inverter Room Ventilation System is met following a design
basis tornado that disables the ventilation system.
2/15/2019
DDP 1000025299 Replace the existing fuse and install a redundant fuse in
series in the Hydrogen Recombiner Power Supply Panel.
DDP 1000025506 Minor Design Change Package Summary - This design
change will revise the licensing basis to explicitly credit
manual operator actions to ensure the cooling requirement
for the electrical equipment served by the 480VAC
Switchgear Room and 125VDC Inverter Room Ventilation
System is met following a design basis tornado that disables
the ventilation system.
2/15/2019
EDT No. 4*1581
Engineering Drawing Transmittal: NMOD Convert TMOD
68012135 for U1 ICW Cover Gas to Permanent Equipment.
Engineering
DDP 1000025448 Design Change Package Summary and Evaluation - This
1/4/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Evaluations
Design Change Package implements a physical change to
the vital 4.16-kV Switchgear room (SWGR) and Cable
Spreading Room (CSR) ventilation system by placing the
dampers in the normally closed position and disabling
(abandon in place) the associated HVAC exhaust fire
damper position switches.
Miscellaneous
Y-3.2(10)
UFSAR Change Request - The proposed activity is a change
to the DCPP current licensing basis (CLB) for
the configuration of system boundaries as defined in UFSAR
Section 3.2.2.1. l(i).
1/31/2017
Procedures
CF3.ID22
Minor Modification Process
CF3.ID6
Drawing Change Transmittal Processing
CF3.ID9
Design Change Development
CF4.ID4
Field Change Process
26A
CF4.ID7
Temporary Alteration
CP M-16
Severe Weather
OM7.ID1
Problem Identification and Resolution
OM7.ID4
Cause Evaluations
OP B-3A:IV
Safety Injection System - Off Normal Operation.
OP H-10:IV
Auxiliary Building General Ventilation - Off Normal Operation
- (Unit 1)
OP H-10:IV
Auxiliary Building General Ventilation - Off Normal Operation
- (Unit 2)
TS3.ID2
Licensing Basis Impact Evaluations
44A
Work Orders
60101343, 60108251
Corrective Action
Documents
Notifications
51060208, 50390780, 50673779, 50390622, 50673779,
51060449
Miscellaneous
Temporary
Modification
60076719
Unit 2 PRT Hydrogen Concentration Limit Increase
Procedures
AD7.ID14
Assessment of Integrated Risk
OP A-4B:III
Pressurizer Relief Tank - Remove From Service
OP A-4B:IV
Pressurizer Relief Tank - Normal Operations
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
OP F-5:I
Chemical Control Limits and Action Guidelines for the
Primary Systems
Corrective Action
Documents
Notifications
51058860, 51056200, 51062395, 51063795, 51053498,
50985428, 51063333, 50934425
Miscellaneous
Unit 1 Diesel Generator 1-1 Lube Oil Leak Adverse
Condition Monitoring Plan
2/26/2019
Procedures
MP M-21-HX.2
Diesel Generator Lube Oil Heat Exchanger
MPM M-23-BD.67 Preventive Maintenance of BD-67
OP H-5:I
Control Room Ventilation Prepare for Service
OP H-5:III
Control Room Ventilation System
STP I-36-R04
Eagle 21 Rack 4 Removal From Service and Return to
Service
STP M-21-ENG.1
Diesel Engine Generator Inspection (Every Refueling
Outage)
STP M6-A
Routine Surveillance Testing of Control Room Ventilation
System
Work Orders
6010901, 60123967, 60124001, 60123682, 60111921,
64196335, 64174219
Corrective Action
Documents
Notifications
51053146, 51053498
Miscellaneous
License Amendment Request 14-01, Revision to Technical Specifications 3.8.1, AC Sources - Operating
3/27/2014
Procedures
STP M-12B
Battery Charger Performance Test
STP M-9A1
Diesel Engine Generator 1-1 Routine Surveillance Test
STP V-18S
Nonintrusive Test of MU-02-971
TP TO-19005
Unit 2 Main Generator Reactive Power Capability Test
Work Orders
230300, 60123682, 64153267, 64178148, 64178183
Procedures
EOP E-2
Faulted Steam Generator
23A
EOP E-3
Steam Generator Tube Rupture
40A
EP G-3
Emergency Notification of Off-Site Agencies
EP RB-10
Protective Actions Recommendations
71151
Procedures
AWP L-001
NRC Performance Indicators Initiating Events, SSFFs, and
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
XI1.ID2
Regulatory Reporting Requirements
XI1.ID5
Collection and Submittal of NRC Performance Indicators
Corrective Action
Documents
Notifications
50980570, 51022441, 51023724, 51023903, 51024097,
51024146, 51024613, 51023931, 51023932, 51024092,
51024090, 51025122, 51025123, 51025124, 51025128,
51025129, 51025160, 51025161, 51025163, 51025164,
51025166, 51025167, 51025168, 51025169, 51025180,
51025181,51025182, 51025183, 51025184, 51025185,
51025186, 51025187, 51025188, 51025644, 51029223,
51029224, 51023930, 51029225, 51029389. 51032751,
51032866, 51032752, 51032865, 51032794, 51032795,
51032797, 51032851, 51032869, 51036160, 51037549,
51037687, 51037631, 51037736, 51038664, 51039380,
51041668, 51045183, 51045184, 51048745, 51048746,
51056345, 51056346, 51056347, 51056450, 51061194,
51062658, 51066257, 51066606, 51067284, 51067980,
51069986, 51068062, 51027584, 51032876, 51071321,
51067890, 51063444, 51067017, 51022978, 51057273,
51007668, 51070121, 51059901, 50652438, 50652617,
50643534, 50652093, 50657850, 50654950, 51049295,
51049291, 51050256
Drawings
107723
Auxiliary Building HVAC
Procedures
MP M-23-BD.67
Preventive Maintenance of BD-67
NRC IN 97-09
Inadequate main steam safety valve (MSSV) Setpoints and
Performance Issues
3/12/1997
Industry Performance of Relief Valves of U.S. Commercial
Nuclear Power Plant Through 2007
3/2011
OP C-3:II
Main Unit Turbine - Startup
STP M-39B
Routine Test of Cable Spreading Room CO2 Fire System
Operation
STP M-39B
Routine Test of Cable Spreading Room CO2 Fire System
Operation
STP M-70B
Inspection and Testing of Fire Dampers
STP V-3R1
Exercising 10% Atmospheric Dump Valves PCV-19, 20, 21,
57A
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
and Isolation Valves
Work Orders
60117800, 60118027, 60119941, 64190982, 60126407
Corrective Action
Documents
Notifications
51057622, 51057314, 51061381, 51067153, 51066758,
51058035, 51060562, 51065170, 51066241, 51060172,
51066640
Miscellaneous
LER 2019-001-00
Containment Spray Inoperable in Mode 4
1/29/2020
Procedures
OP AP-12B
Control Rod Misalignment
OP AP-25
Rapid Load Rejection or Shutdown
OP L-4
Normal Operation at Power
OP L-6
Cold Shutdown/Refueling
OP1.DC1
Administrative Program to control The Return to Power after
2A
STP R-19
Shutdown Margin Determination
STP R-1A
Exercising Full Length Control Rod
25