IE Insp Rept 50-320/77-36 on 770912-14.Noncompliance Noted: Failure to Follow Instrumentation Installation Procedures
ML19199A472
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/05/1977
From: Ebneter S, Paolino R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19199A468 List:
References
50-320-77-36, NUDOCS 7905020526
Download: ML19199A472 (6)


Text

U.S. tiUCLEAR REGULATORY COMMISS10?i 0FFICE OF IttiPECTION AND ENFORCEMENT Region I Report No.

77-36

.

Docket No.

50-320 B

License rio.

CPPR-66 Priority Category

--

Licensee:

Metropolitan Edison Company P. O. Box 542 Reading, Pennsylvania-19603 Three Mile Island Nuclear Station, Unit 2 Facility Name:

Inspection at:

Middletown, Pennsylvania Inspection conducted:

September 12-14, 1977

< k. de

{

/777 Inspectors:

R. J. PaolinoQ' Reactor Inspector date' signed s

date signed date signed

@ 8b I[877

4-Approved by:

S. O. Ebneter, Chief, Engineering Support date signed Section No. 2, RC&ES Branch

.

.

Insoaction Summary:

Instect.icn on Sectember 12-14,1977 (Recort No. 50-320/77-36)

Areas Insoected:

Routine, unannounced inspection of pertinent work and quality records relative to safety related instrument cables, terminations and associated hardware to ascertain whether the records meet established procedures and whether records reflect work ac-complishment consistent with NRC requirements. The inspection involved 18 inspector-hours for one NRC inspector.

Results: Of the one area inspected, one apparent item of noncompliance was identified.

(DeT1ciency - failure to follow instrumentation installation procedures - Para. 4)