ML21127A160

From kanterella
Jump to navigation Jump to search
Emergency Plan and Alert and Notification System (ANS) Design Report
ML21127A160
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/28/2021
From: Keele R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
0CAN042104
Download: ML21127A160 (2)


Text

0CAN042104 April 28, 2021 ATTN: DocumentControl Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Entergy Operations, Inc.

1448 SR 333 RUSS811vllle, AR 72802 Tel 479-858-7826 RIiey D. Keele, Jr.

Manager, Regulatory Assurance Arkansas Nuclear One 10 CFR 50.4(b)(5)

Subject:

~mergency Plan and Alert and Notification System (ANS) Design Report Arkansas Nuclear One, Units 1 and 2 NRC Docket Nos. 50-313, 50-368, and 72-13 Renewed Facility Operating License Nos. DPR-51 and NPF-6 In accordance with 1 0 CFR 50.4(b)(5), 1 0 CFR 50.54(q)(5), 10 CFR 72.4, and 1 0 CFR 72.44(f),

the Arkansas Nuclear One (ANO) ANS Design Report which is considered part of the ANO Emergency Plan has been revised and is included in the Enclosure to this letter. The ANS Design Report was revised to include an updated siren coverage map using a detailed acoustical model and field testing of siren sound levels and was effective on January 1, 2021. It was also updated to include new guidance on report format and report content in the Federal Emergency Management Agency (FEMA) Radiological Emergency Planning Program Manual, dated December 2019. In addition, no changes were made to the ANS Design Report except those reviewed and approved by FEMA.

In accordance with 1 0 CFR 50.54(q), a screening of the changes to the ANS Desig.n Report was performed. The screening concluded that the changes do not reduce the effectiveness of the ANO Emergency Plan, and the Emergency Plan continues to meet the standards of 1 0 CFR 50.47(b) and 10 CFR 50, Appendix E.

This correspondence contains no new regulatory commitments. If there are any questions or if additional information is needed, please contact me.

Re~

Riley D. Keele,~-

RDK/nbm f1-X+5

vr-1
5 5 z_~

. Al J(!__ R._

µr-1 5_$

0CAN042104 Page 2 of 2

Enclosure:

ANO ANS Design Report cc:

NRC Region IV Regional Administrator NRC Senior Resident Inspector-Arkansas Nuclear One NRC Project Manager-Arkansas Nuclear One NRC Director, Division of Spent Fuel Storage and Transportation NRC Region IV Senior Emergency Preparedness Inspector Designated Arkansas State Official